Construction and maintenance of a new 2.4km section of National Road R573 section 1 from Stormvoël Road at km 0.0 to Baviaanspoort Road at km 2.4 in Niemand Park, Pretoria, Gauteng. CIDB 9CE. The GPS Coordinates have been placed at Stormvoël Road 25°42'57.4"S 28°17'45.1"E.
Upgrading of the Vusi Mzimela (Bellair) Road, Phase 4, situated within Ward 29 and Ward 101 in Durban, KwaZulu-Natal. CIDB 8. The exact co-ordinates are currently not available however the approximate area of location is: -29.862052, 30.967086
Improvement on National Road R52 Section 3 from Koster at km 00 to N4 Rustenburg at km 38.70, in the District Municipality of Bojanala Platinum and Local Municipality of Kgetlengrivier. North West. Contract value is R1 318 072 674,40. The exact GPS co-ordinates are currently not available, however the
Construction of National Road R335 between Motherwell and Addo for Phase 1 from km 5.16 to km 27.5, within the boundaries of the of Nelson Mandela Bay Municipality, Eastern Cape. The project value is R 874 377 027,29. The GPS co-ordinates have been placed on the proposed construction route 33°39'12.8"S
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Rehabilitation of Palmiet Pump Station situated in Van Bergen Street, Alberton, Gauteng. The contract value is R817 457 618,99. The scope of work will include but is not limited to work associated with the previously constructed 40.571km section of the existing B17 pipeline starting at Zuikerbosch Pump
Upgrading of Main Road P419 from gravel to blacktop located between Howick, Hilton, and Pietermaritzburg region. Value: R285 157 392,57. The GPS marker has been placed at the start of construction 29°45'41.0"S 29°51'25.5"E
Construction of earthworks, surfacing and drainage structures on Main Road 402 from km 0 to km 7,517, in KwaMncane, KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of location is: -29.6862333, 30.1011836. R108413380.72. Phase 2 is the completion tender.
Improvement of National Road R555 Section 3 from Steynsdrift at km 44.0 to Steelpoort River at km 63.0 in the district municipality of Sekhukhune and local municipality of Elias Motsoaledi, Limpopo R342 254 001.30 The exact co-ordinates are currently not available however the approximate area of location