Construction of a 765kV Transmission Power Line between Umfolozi Substation and a new 765/400kV substation near Empangeni, KwaZulu-Natal. GPS coordinates are -28.2159308, 31.1884679
Construction of a new 400kV line of approximately 11km in length between the existing Neptune and Poseidon substations. The substation will also be expanded and upgraded to accommodate the new line. In addition, two turnings of approximately 5km each will be constructed from the proposed Neptune-Poseidon
Construction of railway line and associated infrastructure from Ermelo to Majuba stations, approximately 67.5km - Part of CTS Project - linking the power station and the existing Richards Bay export coal railway line to supply Majuba Power Station. Eskom Holdings Limited invites you to submit a proposal
Construction of Midlands substation and associated powerlines on Erf 3236 Howick, Umngeni Local Municipality, KwaZulu-Natal. Eskom Holdings Limited proposes to construct Midlands 132kV/11kV substation and associated 2 x 132kV Gowrie Midlands Pentrich powerlines. This project will strengthen the electricity
Establishment of 132kV Powerlines from either or both of the existing substations, Makhatini or Nondabuya, on the Makhatini Flats to proposed substations at Manguzi (to be called Gesiza substation) and Mbazwana (to be called Mbazwana substation), Umkhanyakude District Municipality, KwaZulu-Natal. The
The Mmamabula coalfield comprises two noncontiguous coal prospecting licences in the Mmamabula coalfields of south-eastern Botswana, namely the 50 840 ha Mmamabula East ad the 14 000 ha Mmamabula South prospects. The global mineral resource estimate for the project totals about 2,3 billion tons in the
Construction of a proposed wind energy facility on an area of approximately 7 400 ha site near Vredendal, in the Western Cape. The site is located on the West Coast near the town of Koekenaap, west of Vredendal. The facility will include 46 wind turbines, a substation, 132kV power line to transmit generated
Upgrading of the Matla Power Station. Eight additional silicon carbide furnaces. Each furnace will consist of a transformer room of approximately 6 meters in height, and 10 meters square. There will be underground installation of power cables and power distribution. The depth of the power distribution
Construction of a 400kV substation (known as Steelpoort Substation) at a site in close proximity to the Steelpoort Pumped Storage Scheme, which is approximately 40km north-west of Simplon Substation in the Limpopo Province. This project is to be known as Steelpoort Integration Project.