Anglo American's Thermal Coal is investigating the feasibility of building a power generation plant that will operate using low-quality discarded coal as fuel, in eMalahleni, Mpumalanga. A 450MW modular plant is being considered and should the project go ahead, the plant would make use of circulating
Construction of the N7/N8 and M11 Steel Pipelines including earthworks, pipe laying and associated works from Brakpan reservoir to Selcourt reservoir in Gauteng. Minimum CIDB contractor grading is 7 CE/6 CE PE and 8 CE/ 7 CE PE. Approximately R240 Million
Construction of a 60ML reinforced concrete reservoir, inlet and outlet pipework and ancillary works at the corner of Ithendele Drive and Intaka place in Ward 44, within the Ethekwini Metropolitan Municipality of KwaZulu-Natal. Approximate GPS Coordinates: -29.721059, 30.923026. CIDB 9: R130 Million Plus
Construction of Road K46, Phase 2, P79/1 between PWV 5, Jukskei River and N14, P158/2 in Diepsloot and the distance is approximately 5 km, Gauteng. R469 414 877.50
Construction and installation of a steel pipe for the C25 pipeline from Zwartkopjes to Meyershill, Eikenhof, Johannesburg South, Gauteng. The scope of works includes earthworks, pipe laying and associated works which is divided into two portions being Portion A (3200 m) & Portion B (3000 m). CIDB Grading
Upgrading of the Vondo Water Treatment Works in Vhembe District Municipality in Limpopo. Value approximately R118 million The exact co-ordinates are currently not available and the marker has been placed on a road going through Vondo 22°56'16.9"S 30°22'05.5"E
Upgrading of the Fortuna Water Treatment Works in Dipaleseng Local Municipality in Mpumalanga Estimated value R89 386 249.11 (excluding VAT) GPS of site not available, marker placed at Balfour Municipal Council offices -26.66058221894706, 28.588112320792792
Construction of steel pipeline H39 phase 11 from Dale Road to Modderfontein Road at Midrand, Gauteng. Scope of works includes earth works, pipe laying and associated works. CIDB grading required is 8CE/7CE PE.
Construction of the Sandriver North water treatment works which is part of the Polokwane groundwater development project in Polokwane, Limpopo R151 million. GPS marker placed approximately in the middle of the work area 23°50'35.2"S 29°22'25.5"E
Construction of two 10ML command reservoirs at the existing R2 reservoir site in Phiphidi, Vhembe District Municipality, Limpopo Estimated value R73 433 419.14. The exact co-ordinates are currently not available however the approximate area of location is lat: -22.9450009; long: 30.3954282.