Construction of 57km long DN 100 to DN 600 steel pipeline, 7 concrete reservoirs and 4 break pressure tanks for the uMshwathi bulk water supply scheme Phase 4, in the uMgungundlovu District Municipality, Kwazulu-Natal. CIDB 9CE. The GPS coordinates are not known and the marker has been placed at the
Rehabilitation of main road P19 km 6.0 to km 23.0 between Mooi River and Giants Castle in uMgungundlovu district municipality and Mpofana local municipality, KwaZulu-Natal. CIDB 9 CE. the GPS marker has been placed at the intersection of P19 and P172, km12 along P19 from Mooi River, GPS coordinates 29°11'14.02"S
Construction of earthworks, layerworks, surfacing, drainage, retaining structures and the upgrade of Kwamanzamnyama River Bridge on Main Road 714, from Ndondolo to Sonkombo (km 8 - km 18) near Ndwedwe in KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of
Construction of a 6Ml reinforced concrete reservoir in Trenance Park, Verulam, KwaZulu-Natal. CIDB 7CE. The scope of work could include construction of a 6Ml reinforced concrete reservoir, pump station, inlet and outlet pipework, 400K elevated tank and ancillary works. The GPS marker has been placed
Upgrades to the Phobane water treatment works located ±13km north of Eshowe, Kwazulu-Natal. CIDB 8CE/ME. The water treatment works are to be upgraded to 40ML/D. The GPS marker has been placed at the Mthonjeneni Pump Station 28°46'20.6"S 31°28'32.5"E
Construction of a primary bulk gravity pipeline for the Kwajobe community water supply scheme in Wards 3, 4 and 5, Jozini Local Municipality, KwaZulu-Natal. CIDB 7CE. The scope of work could include the laying of 4km of 350/400 diameter secondary bulk gravity pipeline, 19km of 50 - 110mm reticulation
Upgrading of the Msunduzi River Bridge (Grimethorpe Avenue to Bishopstowe) on District Road D669 at km 2.54 in the Umgungundlovu District Municipality in Pietermaritzburg, KwaZulu-Natal. CIDB 7CE The scope includes establishment on site and clearing and grubbing, provision of traffic accommodation facilities,
Upgrades and rehabilitation to the KwaNdengezi wastewater treatment works and upstream catchment network in Ward 12, Durban, KwaZulu-Natal. CIDB 7CE. The GPS coordinates are 29°52'4.61"S, 30°46'3.08" E
Routine and safety maintenance on road P1/1 from km 0.00 to km 42.91 and P400 from km 0.00 to km 14.38 in Ethekwini Metro under Durban region, KwaZulu-Natal. CIDB 7CE. The construction works are on Main Road P1/1 (M13) and P400 traversing Ward 63 between Hillcrest and Pinetown. The GPS marker has been