Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Construction of the 2 000 bed student accommodation building for the Sefako Makgatho Health Sciences University situated along Molotlegi Street, Ga-Rankuwa Zone 1, Ga-Rankuwa, Gauteng. Value of the project is estimated at R550 million. The approximate GPS location has been placed along the proposed area
Construction of two new roads, Road P1-1 (R82) (57) phase 3 from D1073 (Walkerville) to K164 (De Deur) which is approximately 11.3km and Road K164 between Road D904 (Evaton) and Road D905 which is approximately 4.1km both in Gauteng. CIDB Level: 9CE.
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Construction of encasements to the BG1 and BG2 pipelines between Vaal Dam and Zoekfontein Control Works located in Gauteng. Scope of works includes the construction of encasement as well as a new flow meter chamber to the BG1 and BG2 and appurtenant works. CIDB 8CE / 7CE
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Construction of civils, services, and earthworks for the new 497.22 Ha John Dube mega city mixed use development precinct situated on the remainder of portion 41 and portion 77 of Grootfontein Farm as well as portion 7 and 29 of Farm Spaarwater 171 I.R. Heidelberg, Gauteng. R 59 929 600.90. The exact
Upgrading and construction of roads & stormwater infrastructure in EMM for package 1, cluster 4 of the Northern Region roads project which includes Harmelia / Buurmendal SW System (Cunningham /Donald); Meadowale, Brickfield, Fleming SW; (N) Dunvegan, 5th and 6th Avenue SW Upgrade; Isandovale erosion
Construction of the Isondo Precious Metals Facility, on Portion 282 of the Farm Witkoppie No. 64 – IR, OR Tambo SEZ (Gauteng Industrial Development Zone), Bonaero Park, Kempton Park, Gauteng. The Facility will manufacture Platinum Group Metal (PGM) based Membrane electrode assemblies (MEA) and catalysts