Construction of Delmas Branch Office in Botleng Township, Victor Khanye Local Municipality, Mpumalanga. CIDB 7GB. The GPS coordinates of the office are 26°06'12.3"S 28°41'51.8"E
Upgrading of Road D2950 from D797 towards Dludluma and Ring Road in the Ehlanzeni Region of Mpumalanga. CIDB 8CE. Scope of works could include the upgrading of 9.5km of road. The GPS marker has been placed on the route of construction 25°39' 32.30"S 31°54' 00.97"E
Upgrading of the Thembalethu water infrastructure in Ward 05 in the Thembisile Hani Local Municipality, Mpumalanga. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed at Kwaggafontein C as per the site inspection 25°18'41.4"S 28°57'02.2"E
Rehabilitation including selective treatment of road P8/1 between Mashishing and Bambi for a distance of 11km in the Bohlabela District of Mpumalanga. Value R171 458 454.21 Scope of works indicates this is Part A. The GPS co-ordinated have been placed at Road D2258 to Bosoord off the P8/1 (R36) intersection
Construction of a child care centre and community hall, Ntunda, Nkomazi Local Municipality, Ehlanzeni District, Mpumalanga Province. CIDB 7GB. The location of the site is 25°43'56.1"S 31°45'27.9"E
Construction of the proposed Skywalk which is a cantilevered glass bottomed walkway that will be about 12m in length and 5m wide and will protrude from an elevated view point at the God’s Window site located on Farms De Houtbosch 503 KT and Portion 2 of Farm Lisbon 531 KT within the Thaba Chweu Local
Construction of bulk line, water reticulation and elevated tank in Steenbok, Mpumalanga. R41 639 391.48.. The GPS marker has been placed at the area of construction 25°44'31.2"S 31°53'45.6"E
Expansion of the Burnstone Gold Mine near Balfour in Mpumalanga. The proposed expansion includes an additional mining area (Area 2) and a bulk water storage dam. Four additional underground mining blocks will be extracted for Area 2, and the dam will have a minimum capacity of 400 000m³. GPS: -26.499094;
African Exploration Mining and Finance Corporation Ltd intend to mine coal on 374.63 hectares on the farm Klippoortjie 32 IS which is located within the Emalahleni Local Municipality in Mpumalanga Province. The proposed project entails the mining of coal by box-cut, opencast mining method, then using
Upgrading of National Road R573 Section 2 Work Package A from km 24.70 to km 36.20 in the province of Mpumalanga in the District Municipality of Nkangala and in the Local Municipality of Thembisile Hani. Estimated value: R559 270 315.00 The exact co-ordinates are currently not available however the approximate