Rehabilitation including selective treatment of road P8/1 between Mashishing and Bambi for a distance of 11km in the Bohlabela District of Mpumalanga. Value R171 458 454.21 Scope of works indicates this is Part A. The GPS co-ordinated have been placed at Road D2258 to Bosoord off the P8/1 (R36) intersection
Construction of Nyongane Pedestrian Bridge in Mbombela, Mpumalanga. R7 952 022.14. The scope of works could include site establishment, site clearance, excavation, construction of foot bridge, construction of v-drains and gabions, stormwater control. GPS coordinates have been placed at the proposed
Construction of the proposed Skywalk which is a cantilevered glass bottomed walkway that will be about 12m in length and 5m wide and will protrude from an elevated view point at the God’s Window site located on Farms De Houtbosch 503 KT and Portion 2 of Farm Lisbon 531 KT within the Thaba Chweu Local
Construction of a child care centre and community hall, Ntunda, Nkomazi Local Municipality, Ehlanzeni District, Mpumalanga Province. CIDB 7GB. The location of the site is 25°43'56.1"S 31°45'27.9"E
Construction of the Verena C Bus and Taxi Route in Ward 11 in Verena, Mpumalanga. CIDB 7CE. The exact GPS location is not known and the marker has been placed at the Thembisile Hani Local Municipality Head Office 25°18'30.9"S 28°56'48.6"E
Construction of Mzimuhle water infrastructure in Ward 10 in the Thembisile Hani Local Municipality, Mpumalanga. CIDB 7CE/6CEPE. GPS co-ordinates are not known and the marker has been placed at the municipality offices 25°18'30.9"S 28°56'48.7"E
Upgrading of Milieland Road located in the Mbombela municipal area within the Kabokweni residential area in Mpumalanga. CIDB 7CE. Scope of works could include: upgrading of Milieland road from previously surfaced road that was completely damaged due to inadequate stormwater control to paving, provision
Upgrading of Pennywhistle Street and Swan Street in Kanyamazane Township in Ward 20 of Mbombela in the Ehlanzeni District, Mpumalanga. CIDB 7CE. Scope of works could include: upgrading of the gravel road to a surface road. As per the tender document the approximate location of the start of Penywhistle
Construction of bulk line, water reticulation and elevated tank in Steenbok, Mpumalanga. R41 639 391.48.. The GPS marker has been placed at the area of construction 25°44'31.2"S 31°53'45.6"E
Expansion of the Burnstone Gold Mine near Balfour in Mpumalanga. The proposed expansion includes an additional mining area (Area 2) and a bulk water storage dam. Four additional underground mining blocks will be extracted for Area 2, and the dam will have a minimum capacity of 400 000m³. GPS: -26.499094;