Construction of improvements and renovations on National Route N2 Section 34 from Verzameling at km 30 to Leiden at km 60, in Mpumalanga. Exact co-ordinates are not known, marker placed on N2 in approximate area 26°43'52.1"S 30°15'15.8"E
The relocation of St Andrews Primary School and the Motha family home in the district municipality of Gert Sibande and local municipality of Mkhondo Local Municipality, Mpumalanga. CIDB 7GB Scope of works for the construction of the new St Andrews Primary School: 7 classrooms to be used for Grade R to
Replacing of water AC pipes in Empuluzi water Scheme in Empuluzi, Mpumalanga. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed at the Chief Albert Luthuli Municipality 26°17'37.9"S 30°46'22.6"E
Expansion of the Burnstone Gold Mine near Balfour in Mpumalanga. The proposed expansion includes an additional mining area (Area 2) and a bulk water storage dam. Four additional underground mining blocks will be extracted for Area 2, and the dam will have a minimum capacity of 400 000m³. GPS: -26.499094;
African Exploration Mining and Finance Corporation Ltd intend to mine coal on 374.63 hectares on the farm Klippoortjie 32 IS which is located within the Emalahleni Local Municipality in Mpumalanga Province. The proposed project entails the mining of coal by box-cut, opencast mining method, then using
Upgrading of National Road R573 Section 2 Work Package A from km 24.70 to km 36.20 in the province of Mpumalanga in the District Municipality of Nkangala and in the Local Municipality of Thembisile Hani. Estimated value: R559 270 315.00 The exact co-ordinates are currently not available however the approximate
Improvement of National route N2 section 33 between KZN Border (km 0.0) to Bloemendal (km 34). This project is in the province of Mpumalanga and in the district municipality of Gert Sibande. CIDB 9CE. The marker has been placed on the N2 between the KZN Border and Bloemendal 27°14'01.2"S 31°13'07.8"
Construction of improvements and renovations on National Route N2 Section 34 from Piet Retief at km 0 to Verzameling at km 30, in Mpumalanga. CIDB 9CE. The marker has been placed between Piet retief and Verzameling 26°57'12.7"S 30°46'47.4"E
The Eloff project is situated adjacent to the Kangala Colliery in Mpumalanga. This allows Universal the opportunity to consolidate the contiguous resource base of the Eloff Project with Universal’s existing Kangala Colliery, and provides optionality for extending Kangala’s life of mine and upsizing the
Exxaro proposes to relocate the Matla Coal Mine 1 surface infrastructure and access shaft from the farm Haasfontein 85 IS Portion 5 to the remaining extent of the Farm Bakenlaagte 84 IS, Mpumalanga Province. The shaft area with associated infrastructure including the pollution control structures will