Construction of the 2 000 bed student accommodation building for the Sefako Makgatho Health Sciences University situated along Molotlegi Street, Ga-Rankuwa Zone 1, Ga-Rankuwa, Gauteng. Value of the project is estimated at R550 million. The approximate GPS location has been placed along the proposed area
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Additions and upgrades to the existing MTN Data Centre situated at 20 Watershed Close, Louwlardia, Centurion. Gauteng. The scope of works will consist of two phases. Phase one will be construction of the DC room and phase two will be electrical installation. The exact GPS coordinates are 25°55'00.8"S
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Upgrading and construction of roads & stormwater infrastructure in EMM for package 1, cluster 4 of the Northern Region roads project which includes Harmelia / Buurmendal SW System (Cunningham /Donald); Meadowale, Brickfield, Fleming SW; (N) Dunvegan, 5th and 6th Avenue SW Upgrade; Isandovale erosion
Construction of a business park warehouse located in Louwlardia, Centurion Gauteng. This state of the art warehouse facility right next to the N1 with ample height, loading docks, truck reticulation, fibre reinforced floors & sprinkler system. Floor Size 18,742m²,47 covered parking bays and 173 open
Construction of the Southdowns Office Park in Irene, Centurion, Gauteng. The development will offer convenient amenities and features such as secure parking, 24/7 security, between prominent residential areas as well as major shopping malls, backup generators, wheelchair access and is within close proximity
Construction of the Isondo Precious Metals Facility, on Portion 282 of the Farm Witkoppie No. 64 – IR, OR Tambo SEZ (Gauteng Industrial Development Zone), Bonaero Park, Kempton Park, Gauteng. The Facility will manufacture Platinum Group Metal (PGM) based Membrane electrode assemblies (MEA) and catalysts