Upgrades and expansion of the Maio Airport on Maio Island, Cabo Verde. Included in the scope of works will be the installation of renewable energy infrastructure (solar or wind). The project’s total cost will be a portion of €135 million. The GPS coordinates are 15.1577491, -23.2136711
Airports Company South Africa SOC Limited invites tenders for the once off Refurbishment of the Elevated Roadway Bridge Expansion Joints at King Shaka International Airport.
Construction of the Mombasa Kampala Kigali railway project which entails a 1,185km rail from Mombasa through Nairobi to Malaba and branching to Kisumu; a 1,400km rail from Malaba to Kampala and branching to four Ugandan towns before connecting to the main line to Rwanda at Mirima Hills; a 200km rail
PRASA Cres Kwa-Zulu Natal invites tenders for the appointment of four qualified contractors for general plumbing and drainage maintenance works on an as and when basis for a period of 36 months in KwaZulu Natal region.
Construction of the Benrose Rolling Stock Depot and yard situated at Doornfontein 92-Ir, Johannesburg South, Gauteng. CIDB 9CE. GPS Co-Ordinates are Lat -26.216340, Long 28.081186
Construction and replacements of the rails located on the Metrorail - Johannesburg to Randfontein Line in Braamfontein, Gauteng. CIDB 7CE. The approximate GPS location has been placed along the proposed area of construction: 26°11'22.7"S 28°02'33.8"E.
Upgrading of the Mansa Airport into an International Airport which will form another entry point into the country. This could aid in exploiting the numerous tourist attractions in the northern part of Zambia. GPS coordinates lat: -11.1392209; long: 28.8750382.
Construction of the Construction of Rustenburg Rapid Transport stations superstructures Zone B, Rustenburg, North West. CIDB 7GB. The stations are located on the median at intersections along Swartruggens road heading out of the CBD towards the North West. The GPS coordinates are placed at the existing