Construction of a solar photovoltaic facility with a contracted capacity of 120MW at Selebi Phikwe in Botswana. The design calls for a ground-mounted solar farm, with capacity generation of 50 megawatts. Its output is to be sold directly to Botswana Power Company for integration into the national grid.
The proposed coal bed methane project paves the way for developing the first gas-fired power project in Botswana. The project involves the construction of up to 20MW cbm power generation, a 66kV transmission line to Serowe and a solar farm with a capacity of up to 20MW. The exact co-ordinates are currently
Construction of a solar photovoltaic power project at Maun, Botswana, under a development, financing, construction, operation and maintenance contract. The exact GPS location is not known and the Marker has been placed at Botswana Power Corporation Head Office -24.6649161, 25.9049704.
Construction of a 50MW solar power plant in Kasane, Botswana. The exact co-ordinates are currently not available however the approximate area of location is lat: -17.7952306; long: 25.1711298.
Construction and replacement of the existing water main in Mimosa Street, Jeffrey’s Bay, Eastern Cape. The project value is R 17 934 862,94. The scope of works could include: the construction of the new 315mm diameter uPVC water main in Mimosa Street starting in Noorsekloof road where it will connect
Construction of a 3 650ha, 300MW Mukondeleli Wind Energy Facility 8km south of Secunda in the Gert Sibande District Municipality and the Govan Mbeki Local Municipality, Mpumalanga Province. The exact GPS coordinates are not known, the marker has been placed an estimated 8 km south of Secunda 26°37'40.5"S
Refurbishment for the 36 Hans Strijdom Building located on Erf 155345, 36 Hans Strijdom Avenue, Cape Town City Centre, Cape Town, Western Cape. The scope of works involve construction of a new façade, relocate the parking entrance, install new lifts, new services to offices, demolish internal offices
Upgrading of the no. 6 sewage pump station and construction of a rising new main in Thembalethu, Western Cape. CIDB 7CE. The GPS location is 34°01'14.7"S 22°29'25.1"E
Construction of the proposed transmission interconnector project between the Republic of Botswana and South Africa (BOSA). The exact co-ordinates are currently not available however the approximate area of location is lat: -24.6282079; long: 25.9231471.
Quotations are hereby invited from service providers registered on the Central Supplier Database for the uShaka Marine World – Revamp of HSE office space at uShaka Marine World.