Construction of the civils and structural works for the Seven Seas in Table View, Cape Town, Western Cape. The construction consist of 16 exclusive contemporary apartments. The exact GPS location is not known and the Marker has been placed at Blackstream Developments, 33°50'37.6"S 18°40'37.0"E.
Construction of the Lions Rest Estate at 64 Dirkie Uys Street, Franschhoek, Western Cape. The construction consist of 91 (3 to 4 bedroom) units, wellness centre and associated civil and earth works. The GPS location is 33°54'05.3"S 19°06'57.7"E.
Development of the BlackBrick uMhlanga Village apartments located in uMhlanga Village, uMhlanga, KwaZulu-Natal. It is proposed that the development could be built on the site of the Buxtons Retail Centre. The GPS coordinates are -29.7262696, 31.0834032
Construction of the Odushwini Domestic Reticulation Network: Zone L1-B in Nongoma, KwaZulu-Natal. The scope consists of approximately 48km reticulation network with pipe diameters between 20mm (HDPE) to 355mm (oPVC) and yard taps, including air, scour and isolating valves, meter chambers, break pressure
Coleskop Wind Power (Pty) Ltd is proposing to construct a wind energy facility (WEF) to be developed near Middelburg, Eastern Cape. REIPPP 5. The WEF will host a maximum of 32 wind turbines, each generating 5.5megawatts (MW) of power, with total combined potential power output of a maximum of 140MW.
Routine and safety maintenance on Main Road P93 (M25) from km 0.000 to km 46.240 in the eThekwini Metro, Durban Region, KwaZulu-Natal. CIDB 7CE. The GPS location has been placed along the route of construction 29°44'34.1"S 31°00'39.1"E
Refurbishment of JS Van Der Merwe building, building E6, Potchefstroom Campus, located on Hoffman Street, Potchefstroom, North West. CIDB 7GB. The GPS coordinates are -26.6906445, 27.0928977
Repair and resealing of the National Road R52 Section 1 from Biesiesvlei at km 0.0 to Lichtenburg at km 36.6 in the District Municipality of Ngoka Modiri Molema and local Municipality of Ditsobotla in the North West. The contract value is R75 070 000. The exact co-ordinates are currently not available
Replacement of structures built of inappropriate material at Dr. Blok Secondary School on behalf of Free State Department of Education located at 2 Abdurahman Street, in Heidedal, Bloemfontein, Free State. Project value: R72 857 971,70. GPS coordinates -29.13521759999999, 26.24642549999999.
Special maintenance of primary road P35/1 and P35/2 between Koffiefontein and Havenga Bridge via Luckhoff for a distance of 69km in Xhariep in the Free State. Project value: R 315 338 92.17 (Vat Inclusive). The exact co-ordinates are currently not available however the approximate area of location is