Construction of Section A of the Nquthu Water Supply Scheme in Helpmekaar, KwaZulu-Natal. CIDB 8CE. The scope of work comprises a new 600mm diameter steel rising main in Nquthu Local Municipality from CH 0 to CH 5052. The GPS coordinates are 28°24'12.3"S 30°53'20.3"E
The Mulembo-Lelya hydropower project is located between the Central and Eastern provinces of Zambia, on the homonymous rivers. The project includes three main components: an upstream dam on the Mulembo river for the regulation of the flows, a water transfer scheme from Lelya to Mulembo rivers and a downstream
Repairs and upgrades to the existing Taylor Bequest Hospital waste water treatment works, located in Mount Fletcher, Eastern Cape. Estimated value of R 42 481 329.00 (Inclusive of Vat). The scope of works includes but is not limited to: Install 2 new elevated tank feeder pumps, including pipework and
Upgrading of the bulk water supply (portion 2) for Wesselsbron and Monyakeng in the Free State. Estimated project value: R64 million (Incl. VAT). The exact co-ordinates are currently not available however the approximate area of location is lat: -27.8291984; long: 26.3751225.
Upgrades and expansion of the Maio Airport on Maio Island, Cabo Verde. Included in the scope of works will be the installation of renewable energy infrastructure (solar or wind). The project’s total cost will be a portion of €135 million. The GPS coordinates are 15.1577491, -23.2136711
Construction of Mthonjaneni reservoir Phase 1B2 in Mthonjaneni, KwaZulu-Natal. R18 155 969.03. The project is located primarily within Ward 5 in the Mthonjaneni Local Municipality and the supply area is approximately 15km southwest of Melmoth and is accessed by District Road D550. The scope includes
Repairs and renovations of sewer, stormwater and roads as well as sinkholes at the Department of Defense Thaba Tshwane Military base at 911 Pieter Cronje Road, Pretoria, Gauteng. The contract value is R72 410 058,25. GPS Co-Ordinates are 25°47'20.7"S 28°09'09.3"E.
Construction of the Runde Tende dam in Masvingo province, Zimbabwe. The dam is about 90m high. It will have a total volume of rock fill of about 2 000 000m² and a central core volume of about 520 000m². The water storage capacity will be about 1 billion m². Estimated Project cost: US$ 200 million. The
Replacement and rehabilitation of the Department of Transport's Motor Transport Services (MTS) B Block existing roof and restoration of other areas at 230 Prince Alfred Street, Pietermaritzburg, KwaZulu-Natal. 7GB. The scope of works could include the removal of all existing old building components and
Construction of a multi-storey car park facility in Lilongwe, Malawi. The exact co-ordinates are currently not available however the approximate area of location is lat: -13.9626121; long: 33.7741195.