Upgrading of the National Route R335 Section 1, from Addo at km 37.04 to the Zuurberg Intersection at km 49.06 in the Sunday’s River Valley Local Municipality, Sarah Baartman District Municipality, Eastern Cape. CIDB 9CE. The exact GPS co-ordinates are not available so the marker has been placed at Addo
Construction of Section A of the Nquthu Water Supply Scheme in Helpmekaar, KwaZulu-Natal. CIDB 8CE. The scope of work comprises a new 600mm diameter steel rising main in Nquthu Local Municipality from CH 0 to CH 5052. The GPS coordinates are 28°24'12.3"S 30°53'20.3"E
The Mulembo-Lelya hydropower project is located between the Central and Eastern provinces of Zambia, on the homonymous rivers. The project includes three main components: an upstream dam on the Mulembo river for the regulation of the flows, a water transfer scheme from Lelya to Mulembo rivers and a downstream
Routine and safety maintenance on the main roads P3/1 (R102) from km 69.00 to km 77.96, P3/2 (R603) from km 0.00 to km 11.50 and P21/2 (section of N2) from km 0.00 to km 29.83 in eThekwini Metro, Durban, KZN. CIDB 8CE. The GPS coordinates have been placed on the P21/2 30°08'54.4"S 30°49'41.0"E
Rehabilitation of Tabata Street in Thembalethu Zone 7, George, Western Cape. CIDB 7CE. The approximate GPS location has been placed along the proposed route of construction 34°00'24.5"S 22°29'12.4"E.
Repairs and upgrades to the existing Taylor Bequest Hospital waste water treatment works, located in Mount Fletcher, Eastern Cape. Estimated value of R 42 481 329.00 (Inclusive of Vat). The scope of works includes but is not limited to: Install 2 new elevated tank feeder pumps, including pipework and
Construction of the Chilonga bridge in Zimbabwe. Esitmated cost: US $20m. The exact co-ordinates are currently not available however the approximate area of location is lat: -21.0458596; long: 31.6694677.
Construction of housing units in Kingswood Golf Estate, on erf 20849, Kingswood Cross, George, Western Cape. The GPS location is 33°58'33.3"S 22°25'54.7"E.
Upgrading of the bulk water supply (portion 2) for Wesselsbron and Monyakeng in the Free State. Estimated project value: R64 million (Incl. VAT). The exact co-ordinates are currently not available however the approximate area of location is lat: -27.8291984; long: 26.3751225.