Construction of a 68MW solar plant at Sishen on a rehabilitated waste dump site in Kathu, Northern Cape. GPS coordinates for Sishen Mine is : -27.737522881509182, 22.99645316016768.
Establishment of two additional ventilation shafts, associated infrastructure upgrades and changes to the approved surface infrastructure layout at the Marula platinum mine on the farms Clapham, Winnarshoek and Driekop in Sekhukhune, Limpopo. GPS coordinates lat: -24.5034064; long: 30.0718992. The proposed
The Tala Hamza Zinc Project is owned by Western Mediterranean Zinc Spa and is located on the Mediterranean Sea, 15km from the regional city of Béjaia in Algeria. Terramin holds a 65% shareholding in WMZ, with the remaining 35% held by two Algerian government-owned companies: (32.5%) and Office National
The 472.5km² Senala licence is positioned in the centre of the Birimian-age Kédougou-Kenieba gold belt in Sengal. Four main geochemical targets, Faré, Baytilaye, Saroudia, and Madina Bafé, have been confirmed by drilling. The exact co-ordinates are currently not available however the approximate area
Upgrades and alterations to the Pennyville 88kv switching station and line in Johannesburg, Gauteng. CIDB 8 R40 - R130 million. The exact co-ordinates are currently not available however the approximate area of location is Lat -26.2220497, Long 27.9426134
Development of the proposed Leeuwkop Platinum Mine. The development will consist of a 1 350-m twin-shaft system to gain access to the orebody, as well as finalising the detailed mine design for Leeuwkop, which is situated in the western bushveld, near Brits in the North West Province. The pre-feasibility
Construction of 60 new units at SJ Smith Phase 2 Community Residential Units (CRU), within eThekwini Municipality, KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of location is: -29.85868039999999, 31.0218404
Construction of 48 new units for Phase 3, Jacobs Community Residential Units (CRU), within eThekwini Municipality, KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of location is: -29.9425276, 30.9804621
The Zanaga Iron Ore Project is located in the Lekoumou District, in the south west of the Republic of Congo in West Africa. The deposit is close to the border with Gabon, approximately 300 km northeast of the port city of Pointe Noire and 250km northwest of the Congolese capital Brazzaville. It is expected
The five hectare diamondiferous, Baoulé kimberlite pipe in the Aredor region of central Guinea, Stellar commenced the treatment of weathered kimberlite ore for a 100,000 tonne trial mining evaluation programme in October 2014. During 14 months of actual production over 11,000 carats have been recovered