Refurbishment and extension to the existing Wits University Digital Dome that will now be known as Wits Anglo American Dome, Situated at East Campus, University of the Witwatersrand, Yale Road, Braamfontein, Johannesburg, Gauteng. R75 Million. This project will be done in 3 stages, Stage 1 - During the
Construction of a five star International Hotel and Convention Centre at Ezulwini in Eswatini. No official name has been given to the new Ezulwini complex, but it is being referred to by planners as the King Mswati III Hotel and Convention Centre. Estimated project value : E1 billion. The exact co-ordinates
Design and construction of the refurbishment at the Government Printing Works administrative building and construction of a pedestrian link bridge, located at 389 Sophie de Bruyn Street, Pretoria, Gauteng. The contract value is R162 323 840.36 (Inc VAT) The project involves repair and upgrade to the
Construction of the proposed Skywalk which is a cantilevered glass bottomed walkway that will be about 12m in length and 5m wide and will protrude from an elevated view point at the God’s Window site located on Farms De Houtbosch 503 KT and Portion 2 of Farm Lisbon 531 KT within the Thaba Chweu Local
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction route at 26°21'01.2"S 28°38'39.2"E.
Zutari Consortium (hereinafter referred to as the Client) has been appointed by The South African National Roads Agency SOC Limited (SANRAL) (hereinafter referred to as the Employer) for Contract NRA NO02-200-2016/1F: N2 Wild Coast Toll Highway Section 20 for the provision of professional engineering
Construction of the proposed new Greenfield Foot & Mouth Disease vaccine factory with distribution centre and its related furniture fitting and equipment’s for the factory and site works to be developed on the ARC-Onderstepoort Veterinary Research Campus (ARC-OVR) adjacent to the site of the existing
Transnet plans to build a 146km railway line from Sidvokodvo in Eswatini to Lothair in Mpumalanga. The project, estimated to cost R17 billion is the biggest collaborative infrastructure development between the two countries. The new line will create an additional capacity of 15 million tons. It is also
Upgrading of National Route 1 Section 26 from Rietvley at km 0.0 to Polokwane at km 28.7 in the district municipality of Capricorn, Limpopo. The exact co-ordinates are currently not available however the approximate area of location is Polokwane -23.8961708, 29.4486263
Upgrading of National Route 1 Section 25 from Modimolle Interchange at km 0.0 to Tobias Zyn Loop at km 30.0 in the district municipality of Waterberg, Limpopo. The exact co-ordinates are not available, marker has been placed on N1 near R518 interchange 24°14'25.5"S 29°01'22.0"E