You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 2888 items linked to Zutari Pty Ltd

Advertising



Projects

Mdantsane BWS Phase 5, Part 1A
158
  • 30121
Construction of the Mdantsane bulk water supply to Bufferstrip / Needscamp / Ncera villages for Phase 5, Part 1A, within the Buffalo City Municipality, East London, Eastern Cape. Estimated Value: R41 955 642,99. The exact GPS location is not known and the marker has been placed at the Robbie de Lange


Projects

N17 Sec 2, N3 to Tonk Meter
110
  • 31425
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction route at 26°21'01.2"S 28°38'39.2"E.


Tenders

Wowbiz Centre Containers For The N2 Wild Coast Toll Highway Section 20 Between The
0
  • 1017990
Zutari Consortium (hereinafter referred to as the Client) has been appointed by The South African National Roads Agency SOC Limited (SANRAL) (hereinafter referred to as the Employer) for Contract NRA NO02-200-2016/1F: N2 Wild Coast Toll Highway Section 20 for the provision of professional engineering


Projects

FMD Vaccine Factory
201
  • 28263
Construction of the proposed new Greenfield Foot & Mouth Disease vaccine factory with distribution centre and its related furniture fitting and equipment’s for the factory and site works to be developed on the ARC-Onderstepoort Veterinary Research Campus (ARC-OVR) adjacent to the site of the existing


Projects

George SWI Upgrade
128
  • 32223
Construction of Phase 1 for the George South storm water infrastructure upgrade in the Western Cape. The project value is R40 000 000.00. The exact GPS location is not known and the Marker has been placed at George Local Municipality 33°57'39.3"S 22°27'15.0"E


Projects

DR08303, DR08329, DR08308 and DR08309 - Phase 2
165
  • 27461
Phase 2 of the upgrading of road DR08303, DR08329, DR08308 and DR08309 from R61 at St Barnabas Hospital to Hluleka Nature Reserve (32km) near Libode, Eastern Cape. CIDB 9CE. The exact co-ordinates are currently not available however the GPS marker has been placed along the construction route on the


Projects

N2 Toll - Section 20 Lingeni Intersection to Msikaba Bridge
188
  • 26266
Construction of section 20 between the Lingeni Intersection at km 15.40 and the Msikaba Bridge at km 33.02 for the N2 Wild Coast Toll Highway located in the Eastern Cape. The value of the project is R 2 296 695 921.42. The exact co-ordinates are currently not available however the approximate area of


Projects

Salt River Precinct Road Resurface
85
  • 32249
Resurfacing of roadways on Salt River Precinct situated in Salt River, Cape Town, Western Cape. CIDB 7CE. Scope of works could include: The works for the site clearance, earthworks and layer works include the following: Clearing of site. Demolition of concrete aprons, walls and channels. Bulk excavation


Projects

Gordon's Bay Pump Station
381
  • 15558
Construction of the Gordons Bay pump station and rising main in Gordon's Bay, Western Cape. CIDB 8CE The exact GPS location is not known and the Marker has been placed at Helderberg Municipal Building 34°06'53.4"S 18°49'51.7"E


Projects

Ardagh Warehouse
110
  • 32821
Construction and installation of bulk earthworks and site services for the Ardagh warehouse on erf 26351, 18 Sacks Circle, Sacks Circle Industrial in Cape Town, Western Cape. The GPS location is 33°55'37.3"S 18°39'05.2"E

Advertising

Send me a Sample Based on these search results