Found 109 items linked to Zimbabwe National Water Authority Z I N W A Zimbabwe

Advertising



Projects

Aberfoyle Dam, Zimbabwe
83
  • 25451
Construction of the Abefoyle dam in Midlands, Zimbabwe. The total earthworks volume is estimated at 900 000m³. The project also includes putting in place 30 000m³ of concrete, while the water storage capacity will be 25m. Estimated project cost: US$ 70 million. The exact co-ordinates are currently not


Projects

Runde Tende Dam, Zimbabwe
88
  • 25453
Construction of the Runde Tende dam in Masvingo province, Zimbabwe. The dam is about 90m high. It will have a total volume of rock fill of about 2 000 000m² and a central core volume of about 520 000m². The water storage capacity will be about 1 billion m². Estimated Project cost: US$ 200 million. The


Projects

Eastbourne Dam, Zimbabwe
87
  • 25449
Construction of the Eastbourne dam in Mutare, Zimbabwe. Technical details: maximum dam height: 36.5m; maximum water depth: 31m; live storage: 18.26 x 106m³ and 10% yield: 15 x 106m³ /ann. Estimated total project cost: US$ 39 million. The exact co-ordinates are currently not available however the approximate


Projects

Glassblock Dam, Zimbabwe
101
  • 22274
Construction of the Glassblock Dam in Bulawayo, Zimbabwe. Estimated cost: US$99.8 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -20.1457125; long: 28.5873388.


Projects

Mirror Dam, Zimbabwe
88
  • 25450
Construction of the Mirror dam in Chipenge, Zimbabwe. Technical details: full supply capacity: 22.87 x 106m³; 10% yield : 14 x 106m³; spillway capacity: 1,031 m³/s' maximum dam height: 36.5m and maximum water depth: 31m. Estimated project cost: US$ 43 million. The exact co-ordinates are currently not


Projects

Dande Dam, Zimbabwe
90
  • 24298
The Dande dam project involves the construction of a 160 million cubic metres capacity earth fill dam on the Dande river in Guruve District of the Mashonaland Central Province in Zimbabwe. This project also incorporates the construction of a 7.3km tunnel to be drilled through the Mavhuradonha mountains.


Projects

Chitse Dam, Zimbabwe
88
  • 25452
Construction of the Chitse dam in Mount Darwin, Zimbabwe. Technical details: full supply capacity: 273 x 106m³; 10% yield: 136.5 x 106m³; maximum dam height: 48.3m; crest length: 1 250.0m and volume of material: 5 850 000.0m³. Estimated project cost: US$ 160 million. The exact co-ordinates are currently


Projects

Nyatana Dam, Zimbabwe
100
  • 22364
Construction of the Nyatana Dam on the Mazowe River in Zimbabwe. Estimated project value: US$413 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -17.4883181; long: 30.9933168.


Tenders

Feasibility Study to Assess the Potential for New Underground Water Sources
6
  • 840662
The Zimbabwe National Water Authority (ZINWA) in conjunction with the Bulawayo City Council (BCC) seeks to carry out a feasibility study to assess the potential for new underrground water sources for the City of Bulawayo in the Matoba area (Mzingwane Catchment) and Sawmills area (Gwayi Catchment) In


Tenders

Feasibility Study to Assess the Potential for New Underground Water Sources
7
  • 857898
(Re - Advertisement) The Zimbabwe National Water Authority (ZINWA) in conjunction with the Bulawayo City Council (BCC) seeks to carry out a feasibility study to assess the potential for new underground water sources for the City of Bulawayo in the Matobo area (Mzingwane Catchment) and Sawmills area (Gwayi

Advertising

Send me a Sample Based on these search results