Construction of a single level wellness centre development consisting of many blocks situated within Klipfontein, Johannesburg, Gauteng. Designed for treatment, rehabilitation & integration, the total development will include a large clinic, treatment centre as well as a number of outdoor activities
Construction of the new double level 1870m² Turffontein Clinic to be situated in Turffontein, Johannesburg, Gauteng. The exact co-ordinates are currently not available however the approximate area of location is: 26°14'44.3"S 28°02'20.8"E
Construction works associated with the Chancellor House relocation project located at the corner of Fox and Gerard Sekoto streets in Ferreiras Dorp, Johannesburg, Gauteng. CIDB 7GB. The scope of works involves turnkey solutions space planning design, refurbishments, relocation and accommodation at the
Construction of Molapo Bridge for the Jabulani Transit-oriented Development Phase 7, Johannesburg, Gauteng. The scope of works entails extending and upgrading of the existing pedestrian bridge over the railway line, building of a new pedestrian and vehicular bridge over a railway line and new approach
Completion work to the constitution hill visitors centre located in 11 Kotze Street, Braamfontein, Johannesburg, Gauteng. The scope comprises remedial and repair works to the incomplete five level concrete frame structure which also includes the extension of the first floor slab, casting of the second
Construction of a shelter for displaced people in Freedom Park, Devland Extension 30, Johannesburg on Erf 2161, Gauteng. CIDB 8GB. The extent of the works will inter alia include development of an office for social worker, entrance and security screening area, reception area, boardroom, kitchen, dining
Refurbishment of the administration building at the existing Selby Depot (Phase 2 C) John Street in Selby, Johannesburg, Gauteng. The scope of works will include both civil and building upgrades. CIDB 8: R 40 Million - R 130 Million. The scope of works includes the demolition works to various areas,
Construction works for the Phase 1A Meadowlands Rea Vaya Bus Depot refurbishment project located Meadowlands, Soweto, Gauteng. CIDB 7GB. The GPS coordinates are -26.2084171, 27.8766764
Construction of Phase 2 of the Diepsloot Public Environment Upgrade project in Diepsloot, Johannesburg, Gauteng. The contract value is R 34 417 710.31. The works to be carried out include civil engineering works, landscaping, new sidewalks, road upgrades, upgrade of storm water system, bridges and provision
Construction works for phase 2 of the The Murray Park Library Upgrade located at 110 Park Street and Stone Street, Jeppestown, Johannesburg, Gauteng. The facility will span 2000m². The ground floor will feature a general space, a study area, meeting rooms, study centres, and essential amenities. The