Coleskop Wind Power (Pty) Ltd is proposing to construct a wind energy facility (WEF) to be developed near Middelburg, Eastern Cape. REIPPP 5. The WEF will host a maximum of 32 wind turbines, each generating 5.5megawatts (MW) of power, with total combined potential power output of a maximum of 140MW.
Construction of a windfarm approximately 30km outside of Grahamstown along the N2 in an easterly direction towards East London, in the Eastern Cape. The proposed site is on the farms Gilead, Tower Hill and Peynes Kraal. The proposed wind farm will have 14 turbines, each with a nominal power output ranging
Construction of a Wind Energy Facility (WEF) that will consist of up to nine (9) wind turbines with an output capacity of between 2MW and 4.5MW per turbine with a total output of the proposed less than 20MW situated approximately thirty kilometres (30km) north of Port Elizabeth in the Eastern Cape. The
Construction of the Umsobombu I Wind Energy Facility, Northern Cape and Eastern Cape. The facility will be developed between Middelburg (Eastern Cape) and Noupoort (Northern Cape) on the provincial border. The WEF will host a maximum of 80 wind turbines, each generating between 1.5 – 4 megawatts (MW)
Construction of a wind energy facility on Portion 1 of Farm 190 and RE of Farm 190, Eastern Cape with a total footprint of 4.3 ha. The proposed project site is situated on the remainder of Farm 190, portion 1 of Farm 190, the remainder of Farm 227 and Farm 288 in Grassridge within the Nelson Mandela
Construction of the proposed Albany Wind Energy Facility located in Grahamstown, Eastern Cape. The facility will consist of up to 66 turbines each capable of generating approximately 4.5MW of power. The turbine footprints and associated facility infrastructure (internal access roads, substations, construction
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the proposed Terra Wind Energy Golden Valley Wind Farm Project II, located outside Cookhouse, Eastern Cape. The wind farm is currently authorised to host 126 wind turbines (currently applying to decrease to 49). Each turbine will be connected to an onsite substation from which a 132kV
Construction of a 10MW AC solar photovoltaic plant and associated infrastructure adjacent to the PPC Dwaalboom factory, located on portion of Schoongezicht 238 KP, Dwaalboom, Limpopo. The plant will be used to generate power for private consumption at the adjacent cement factory and neighboring mine.
Construction of the 117MW Golden Valley Wind Farm I, located outside Cookhouse, in the Eastern Cape Province. This forms part of the Window 4 of the Renewable Energy Independent Power Producer Procurement (REIPPP) programme.