Coleskop Wind Power (Pty) Ltd is proposing to construct a wind energy facility (WEF) to be developed near Middelburg, Eastern Cape. REIPPP 5. The WEF will host a maximum of 32 wind turbines, each generating 5.5megawatts (MW) of power, with total combined potential power output of a maximum of 140MW.
Development of a logistic sequencing facility for Daimler Truck Southern Africa within the East London Industrial Development Zone, West Bank, East London, Buffalo City Metropolitan Municipality, Eastern Cape. Extent of the Works: Factory - single storey steel framed factory building, approximately 16
Construction of two substations, two 132kV overhead power lines and to extend the existing substation in order to connect the Ukomeleza wind farm to the grid located on the remainder of farm 190, portion 1 of the farm 190, the remainder of farm 227, farm 228, Grassridge situated north of Zone 14 of the
Construction of the proposed Terra Wind Energy Golden Valley Wind Farm Project II, located outside Cookhouse, Eastern Cape. The wind farm is currently authorised to host 126 wind turbines (currently applying to decrease to 49). Each turbine will be connected to an onsite substation from which a 132kV
Construction of a workshop, warehouse and offices, used-oil storage areas, additional entrance to the facility, centrifuge, boiler and waste disposal area located along Signal Street, East London, Eastern Cape.
Construction of a windfarm approximately 30km outside of Grahamstown along the N2 in an easterly direction towards East London, in the Eastern Cape. The proposed site is on the farms Gilead, Tower Hill and Peynes Kraal. The proposed wind farm will have 14 turbines, each with a nominal power output ranging
Walter Sisulu University's upgrade to the Dwesa Marine Research Facility/Station located within the Dwesa Nature Reserve near Ngomana village in the Mbhashe Municipal area, Eastern Cape. CIDB: 7GB. The proposed upgrades to the Marine Research Facility will include: Accommodation for 15 students and 5
Construction of the proposed 140MW Boulders wind energy facility which will include up to 45 wind turbines and associated infrastructure, substation, access roads and lay down areas, located 14km north of Vredenburg and 7 km east of Paternoster in the Western Cape. The project sites include ten affected
Construction of a bulk water pipeline from Nahoon Dam Water Treatment Works to the Homeleigh Halt Reservoir in Nompumelelo, East London, Eastern Cape province. The pipeline of 600 to 800mm diameter will be approximately 18 kilometers long and will be constructed along the N6 road. The exact co-ordinates
Construction of the Umsobombu I Wind Energy Facility, Northern Cape and Eastern Cape. The facility will be developed between Middelburg (Eastern Cape) and Noupoort (Northern Cape) on the provincial border. The WEF will host a maximum of 80 wind turbines, each generating between 1.5 – 4 megawatts (MW)