Project Details Leisure and Cultural village - Infrastructure

Leisure and Cultural village - Infrastructure
  • Proudly Researched by: Sonet Du Plooy
  • Last Updated on: 09 October 2019.
  • There are 84 Subscribers monitoring this project.
  • This project has been viewed 165 times
Status: Procedural
Value: Unknown At This Stage

Details

Construction of infrastructure and services for a cultural village including accommodation and tourism facilities locate ...End of the details preview. Please Log in or Subscribe for ALL the information.

Private Sector Classified as: Invited / Negotiated
Zeerust Region Timing: 2019 onwards.

Category

Infrastructure

Industry

Hospitality & Leisure

Project Notes

This Project was last updated on the 2019-10-09, please Log in or Subscribe Now to L2B to receive further updates as this Project evolves!

Awards

There are no award notes as yet for this Project, Log in or Subscribe Now for more further updates!

Documents

There are important documents associated to this Project to gain access, Log in or Subscribe Now

Professionals

Client

We have details of the Client associated with this Project, Log in or Subscribe Now to be in the know!

EIA Consultant

We have details of the EIA Consultant associated with this Project, Log in or Subscribe Now to be in the know!

Your Notes

Add a New Note


Quick Search Tags


Your Project Tags


Recent Projects

Related Leads

Construction of 3 residential buildings for a social housing scheme located on Erf 3525 & 3526, Extension 14, corner of Eskia Mphahlele Street and Johannes Ramokhoase Streets, Marabastad, west of Pretoria, Gauteng. The scope of works includes the construction of a 4, 7 and 8 level building to comprise of 509 apartment units in total. As well as bulk services, foundations, the superstructure, installation of aluminium windows and the relevant glazing, installation of finishes throughout the building including floor finishes, wall finishes and ceilings. Installation of fittings throughout the building, including sanitary fittings and kitchen units. Electrical installation including new transformer and switchgear, CCTV and access control, lightning protection and satellite TV. Fire protection installation including building evacuation, storage tanks and pumps, hydrants and hose reels. Wet Services installation including hot water generation, heat pumps, all water supply, waste water and soil drainage installations. Mechanical installation consisting of lifts. Installation of roofs, tiled and flat roof with waterproofing. External works of new paving, fencing and landscaping. Provision of refuse areas, drying yards and wash lines. GPS coordinates of the centre of the site are as follows: Latitude 25°44'36.6"S, Longitude 28°10'30.5"E (-25.743512, 28.175134)

Construction of the Mphephu Shopping Centre in Siloam village in Nzhelele, located 56km from Louis Trichardt and 35km from Thohoyandou, the site is bordered by the townships of Dzanani, Tshikomboni and Dopeni on Portion 4 of 199 of Farm Siloam, on the R523 in Limpopo. The proposed centre will comprise of approximately 6 000m² anchored by Shoprite and including the likes of Cashbuild, Pepkor Group and various food outlets. It will also have a new taxi rank. GPS Coordinates: 22°54'02.1"S 30°11'20.1"E

Construction of Illovo Phase 2 & 3 on Remainder of Portion 5 of the Farm Lot 22 No. 3255 and Remainder of Portion 1 of the Farm Lot 23 No. 3253, situated at 61 Pearce Road, Illovo South, KwaZulu-Natal. The development will consist of multiple 2-storey blocks, totalling 160 units (80 units per phase). The roof type will be a combination of concrete slab and concretetile. Approximate GPS Coordinates: -30.049768, 30.869399.

Send me a Sample Based on these search results