Construction of the Tivaouane to Saint Louis Highway, in Senegal. The project entails the construction of a 167 km interconnecting highway between the Thiès region to the north of the country, Saint Louis. The scope involves the construction of carriageways, bridges, supporting walls, service roads,
Construction of the Sambangalou Dam that forms part of the OMVG Energy Project on the Gambia River in Senegal. The proposed Sambangalou project entails the construction of a gravity dam, with a 128 MW capacity, and a 3.8km³ reservoir. The dam is located in Senegal, 930 km upstream from the mouth of the
Construction of the Kano - Danbatta - Kazaure - Daura - MashiKatsina - Jibiya - Maradi (Niger Republic) railway line with a branch line to Dutse. All together the railway line measures 284km on the Nigerian side and 94km on the Niger side. The project value is estimated to be €1,4 billion. The exact
Conversion of the Tobene Power Plant from a heavy fuel oil-fired power plant to gas, the plant is located about 90km north-east of Dakar at Taiba Ndiaye in Senegal. The project will increase the installed capacity of the existing plant from 96 MW to 115 MW. The project is estimated at $33 million. The
The 472.5km² Senala licence is positioned in the centre of the Birimian-age Kédougou-Kenieba gold belt in Sengal. Four main geochemical targets, Faré, Baytilaye, Saroudia, and Madina Bafé, have been confirmed by drilling. The exact co-ordinates are currently not available however the approximate area
Construction of Akon City in Cadastral de Mbodiene village in Senegal. The project will comprise of 7 districts that will make up the entire city. The district names and descriptions are as follows: District 1 (African Culture Village): Resort & Spa High Rise, 26 storey high-rise building with a total
The Douta Gold Project is a gold exploration permit that covers an area of 103km² and is located within the Kéniéba inlier, eastern Senegal. The permit is an elongate polygon with dimensions of approximately 32km by 3.3km, trending northeast with an area of 103km². The exact co-ordinates are currently
Construction of a greenfield integrated cement plant of CIMAF and grinding plants in Pout, about 50 km from Dakar, the capital city of Senegal. Additional associated infrastructure including rehabilitation of an existing 2km access road, installation of 6 power substations and an optional transmission
Construction of the 18MW Gourbassi hydroelectric project on the Falémé river at the border between Mali and Senegal. The contract value is estimated to be €243 million. The exact co-ordinates are currently not available however the approximate area of location is 14.7600184, -12.2368028
The 60km² Madina Foulbé permit is located within the prolific Kedougou-Kenieba Inlier gold region in eastern Senegal. The 2 priority targets include Tambor and Madina, 2,5km and 2km long gold-in-soil anomalies respectively. The exact co-ordinates are currently not available however the approximate area