Construction of 3 storey multi-purpose block for Phase 2 at the Nursing and Midwifery Training College, Zuarungu, Ghana. GPS coordinates 10.7876815, -0.7996473.
Construction of The Tower Residences on the corner of Dodi Link and Akosombo roads, in Airport Residential Area, Accra Ghana. The project cost has not been disclosed. Scope of works could include: construction of a 17 floor twin tower luxury complex inclusive of executive studios, 1 and 2 bedroom apartments
The Ewoyaa lithium project is a hard-rock, pegmatite and spodumene rich hosted system north of Saltpond, in the central region of Ghana. Estimated project value: US$ 68 million. The exact co-ordinates are currently not available however the approximate area of location is lat: 5.2056442; long: -1.0516029
Construction of the Kano - Danbatta - Kazaure - Daura - MashiKatsina - Jibiya - Maradi (Niger Republic) railway line with a branch line to Dutse. All together the railway line measures 284km on the Nigerian side and 94km on the Niger side. The project value is estimated to be €1,4 billion. The exact
Construction of the Train 2 Gas Processing Plant located on the west wing of the existing Train 1 in Atuabo, Ghana. The new plant will process raw gas with the natural gas liquids being fractionated into pure components like propane, butane, pentane, and stabilized condensate.The project cost is estimated
Construction of the Aurum Residence in Cantonments, Accra, Ghana. The development is a 5 floor apartment block with a 28 car parking in the basement floor. Supporting amenities are two passenger lifts, roof-top infinity pool & roof top garden, bar lounge, gym and a fire escape staircase. The interior
Construction of the 56MW Tanoso Hydropower project on Tano river basin in Ghana. The dam will be 35m in height and 0.6km in length. The GPS coordinates are temporarily unavailable, we have placed the GPS marker at the clients Head Office until they have earmarked the preferred site area 5.549320300000001,
Construction of the 130kW Nworanae Falls Hydropower project on the Nworanae River, Ghana. The gross head of the dam will be 50m. The GPS coordinates are temporarily unavailable, we have placed the GPS marker at the clients Head Office until they have earmarked the preferred site area 5.549320300000001,
Construction of the 64MW Ntereso Hydropower project on Black Volta river/basin in Upper West, Ghana. The dam will be 30m in height, 1.8km in length and the plant will also consist of 3 turbines. The GPS coordinates are temporarily unavailable, we have placed the GPS marker at the clients Head Office
Construction of the 25MW Asuoso Hydropower project on Tano river basin in Ghana. The dam will be 50m in height and 0.4km in length. The GPS coordinates are temporarily unavailable, we have placed the GPS marker at the clients Head Office until they have earmarked the preferred site area 5.549320300000001,