Construction of building two which is one of the iconic identical buildings to be known as the Gateway West development located off Magwa Crescent, Waterfall City, Gauteng. This will consist of two office buildings that are mirror versions of each other designed with progressive statements of modern
Construction of secondary roads at the Waterfall Cemetary, located in Waterfall City, Midrand, Gauteng. The exact GPS co-ordinates are 6°02'26.6"S 28°08'13.1"E.
Renovation works to the bulk stores at the Thembisa Hospital located at 539-541 Reverend R.T.J. Namane Drive, Hospital View, Thembisa, Johannesburg, Gauteng. CIDB 9GB. The GPS coordinates are -25.9825881, 28.2381142
Construction of 5 x 3 level buildings consisting of a total of 109 units for the Kew Inclusionary Housing development located at 132 9th Road, Erf 871, Kew, Johannesburg, Gauteng. The scope includes construction a laundry, gym, guard house and external works. Estimate value R50 Million - R60 Million
Renovations to the Magistrates Court located on 335 Emily Hobhouse Ave, Pretoria North, Gauteng. Some of the scope of works could include but is not limited to the repairs of the building, installation of new water storage tank, fire suppression system to registry and server rooms and construction of
Construction works, Phase 2, Stage 1 for the additions and refurbishments to the G-Fleet Bedfordview Complex, Portion 356 of farm Elandsfontein, Germiston, Johannesburg, Gauteng. CIDB 8GB. The scope of works involves refurbishment of Building E (Visitors Centre), Building K - new head office, Building
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction works for Phase 1 and Phase 2 of the Imbali Estate residential development located on along Joshua Place, Norton's Home Estates, Benoni, Gauteng. The scope of works involves the construction of 135 double-storey townhouses, each unit being approximately ±81.09m² in size. Each unit consisting
Construction works of Phase 2 of the Imbali Estate residential development located along Joshua Place, Norton's Home Estates, Benoni, Gauteng. The scope of works involves the construction of 75 double-storey townhouses, each unit being approximately ±81.09m² in size. Each unit consisting of the following:
Construction works for Phase 1 of the Imbali Estate residential development located on along Joshua Place, Norton's Home Estates, Benoni, Gauteng. The scope of works involves the construction of 135 double-storey townhouses, each unit being approximately ±81.09m² in size. Each unit consisting of the
Construction of new Amatola Office Development on Erf 1403, 14 Amatola Road, Doringkloof, Centurion, Gauteng. The scope of work involves demolition of existing residential building and the construction of new 912m² office building consisting of two floors including (but not limited to) bulk earthworks,
Construction of the Sunderland Ridge Factory Phase 2 on Erf 378, Mooiplaats 355-Jr, at the Westhills Business Estate, Centurion, Gauteng. The scope of works involves the construction of a 6 629m² factory on section 7 of Erf 378. The GPS coordinates are -25.8479922, 28.1033615