Construction of the 10-15 MW Lower Maguduza Hydropower Scheme (LMHPS) to be developed on the Lusufu River in Eswatini. Value: E800 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -26.7851773; long: 31.8107079.
Construction of a 550 km interconnector transmitter to be known as the Mozisa Project for Zimbabwe, South Africa and Mozambique. Estimated total project cost will be US$ 342.2 million. The exact co-ordinates are currently not available however the approximate area of location is lat: -19.883333; long:
Construction of a national referral hospital at Elangeni, Hhohho region, Eswatini. The hospital will have 250 beds and will be constructed in phases. The exact co-ordinates are currently not available however the approximate area of location is lat: -26.5845545; long: 31.4159662.
Construction of the Zambia-Mozambique 400kV Power Interconnector Project. The Southern African Power Pool (SAPP) has received a grant from the African Development Bank to finance the project. The exact co-ordinates are currently not available however the approximate area of location is lat: -13.6445104;
Construction of blocks of residential flats at Golf Course Plot 102 and Checkers Plot 589 in Mbabane, Eswatini. The exact co-ordinates are currently not available however the approximate area of location is lat: -26.3076082; long: 31.1359554.
Construction of a double storey cell block (Lot 5) at Matsapha Correctional Services in the Manzini region, Eswatini. The exact GPS location is not known and the Marker has been placed at Matsapha Correctional Services - lat: -26.5149959756153, long: 31.302256311042647.
Construction of the Ngwempisi Hydro Power Cascading Scheme in Eswatini. The exact co-ordinates are currently not available however the approximate area of location is lat: -26.7014649; long: 31.2899466.
Construction of a biomass circa 40MW plant, that will be developed via the Second Tranche Procurement Programme in Eswatini. It is unclear at this stage where the new biomass plant will be situated. The GPS co-ordinates will be added as soon as the site is identified.
Construction of the Ezulwini Sustainable Water Supply Services Delivery Project by the Eswatini Water Services Corporation (SWSC) in Eswatini. The scope of the works may include, although not limited to, construction of an abstraction point which includes a low flow gauging weir on the Lusushwana River
Construction of the proposed 300MW coal thermal power plant at Lubhuku in Eswatini. Estimated cost: E12 billion. The thermal plant will be composed of a single boiler and a single steam turbine generator with an air cooled condenser. The boiler will be a Circulating Fluidised Bed (CFB) boiler and it