The Da Tambuk project is located in the Tigray National Regional State of the Federal Democratic Republic of Ethiopia. The exact co-ordinates are currently not available however the approximate area of location is lat: 14.0313344; long: 38.3097060.
Construction of the Gimba-Tenta-Tenta Junction in Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 80.21km in length. The exact GPS location is not known and the Marker has been placed at Tenta, 11.3190186, 39.2505381.
The Terakimti Project, also known as the Harvest Project, is proposed as an open pit mining operation followed by heap leaching and on site processing to produce gold-silver dore. The combination of near surface oxide gold and silver mineralization, hosted in soft rock when compared to other deposits,
The Mato Bula gold project is located in the Tigray National Regional State of the Federal Democratic Republic of Ethiopia. The exact co-ordinates are currently not available however the approximate area of location is lat: 14.0323336; long: 38.3165725.
Transport facilitation and road upgrading of the Kampala – Juba – Addis Ababa Djibouti Corridor between Uganda, Ethiopia and Dijbouti running from Kampala in Uganda, East Africa through to Djibouti in North Africa. The exact co-ordinates are currently not available however the approximate area of location
Construction of standard gauge railway connecting Ethiopia and Sudan. The planned railway project runs along Addis Ababa to-Weldiya - Wereta - Gonder- Metema-Galabat- Gadarif-Kassala-Haiya to the Port of Sudan and has a total length of 1 512km. The exact co-ordinates are currently not available however
Construction of the proposed Melkajilo - Awash Expressway in Ethiopia. The project road begins from MelkaJilo at km 60 and traverses part of Amora-Bet Kebele, and other Kebeles such as Ilala, Dhega Hedu, Kobo and Benti in Fentale Woreda of Oromia region, then traverses the Awash National Park, traverses
Construction of the Ethiopia/ Eritrean railway link between Ethiopia and Eritrea. The line is 736km in distance. The route is expected to pass through Mekelle, capital of the northern Tigray region, then through to Awash to the Red Sea. The exact co-ordinates are currently not available however the approximate
Construction of the remaining works for the Jihur-Deneba-Lemi Megenteya-Guguftu-Wereilu-Degolo Road including the Guguftu-Wereilu-Degolo Road in Ethiopia. Scope of works could include: Upgrading of the 74.4 Km existing unpaved gravel road to a two-lane road with a 7.00m carriageway width. Asphalt concrete
Construction of the Kofele - Kore - Bekoji and Arsi Negelle - Bilallo Junction, Ethiopia. Scope of works could include: Design and build contract for an asphalt road of 89.90km in length. The exact GPS location is not known and the Marker has been placed at Kofele 7.0766834, 38.7868342.