Construction of the Kikot Hydroelectric Scheme in Evodoula on the Sanaga River, Cameroon. The project includes a dam, its water reservoir and a hydroelectric plant. The plant will have a capacity of between 450 and 550MW. The GPS coordinates have been placed at the Kikot hydroelectric project offices
Construction of Greater Mnqumeni water supply scheme phase 6.1 in the Harry Gwala District Municipality, Umzimkhulu, KwaZulu-Natal. Value of R69 918 162.32. Scope of works: Construction of a new 1000kl clear water reservoir at the Mnqumeni WTW, new pump station at the WTW, new 2 700m rising main from
Raising of the Kempsdale Dam wall and upgrading of the pump station on Portions 10 of Farm Bad Fontein No. 241 and Zon-Fontein No 257, the dam is located upstream of Kokstad Town within the Greater Kokstad Local Municipality, Harry Gwala District, Kwazulu-Natal. The project value is R160 306 471.25.
Refurbishment of water supply systems for the Manguang Municipality in the Free State. Project Value: R40 800 237.00, The exact GPS location is not known and the Marker has been placed at the Municipal Offices in Bloemfontein -29.1155309, 26.2149659.
Construction of phase 2 of the Isonti low-cost housing water & sanitation scheme, the Ugu District Municipality, KwaZulu-Natal. Value of R72 673 712.38. The scope of works could include the construction of sewer pump stations, 160 diameter 3km steel rising main, 3km 160 diameter class 16 UPVC gravity
Construction of roads, storm water, water reticulation and sewer on the western side and central of the Bryntirion Estate, situated in George Washington Boulevard, Bryntirion, Pretoria, Gauteng, Pretoria, Gauteng. R220 Million. GPS Co-ordinates 25°44′23″S 28°13′36″E
Construction of a six megalitre reinforced concrete reservoir at The Dube Tradeport in La Mercy, Durban, KwaZulu-Natal. CIDB 7CE. The scope could include the circular reinforced concrete ground reservoir, associated pump station, inlet/outlet/reticulation pipelines, valve chambers, platform earthworks
Construction works for Maron-Sibow water supply in Elgeyo-Marakwet county, Marakwet East, Kenya. Scope of works could include: construction of intake works, construction of gravity mains. Transmission lines for Sibow and Mokoro Line (15km long OD 100/110mm) and the construction of the administration
Construction of the bulk sewer lines and pump stations for Mokhesi next to Sterkspruit as part of the RBIG Project in the Eastern Cape. Estimated value: R69 894 840.09. Scope of works could include but not limited to: sewer lift pump station: there are four natural drainage areas within the Mokhesi
The Bumbuna Phase 2 project is expected to significantly increase the power capacity of the Bumbuna hydroelectric plant by 500% from 50MW to 250MW, Phase 2 will be done in 2 stages : Stage 1 will comprise four 33 MW turbines at the Bumbuna extension and dam upstream at Yiben. Stage 2 will comprise two