You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 2762 items with Total of 2977 results

Advertising



Projects

Verulam & Umdloti WWTW
134
  • 35261
Construction of storm damage repairs at the Verulam and Umdloti waste water treatment works located in Verulam, KwaZulu-Natal. CIDB 7CE. This project specifically focuses on the damages to the waste water infrastructure in the Umdloti WWTW catchment which includes damages to sewers, sewer pump stations


Projects

KwaDukuza, Phase 1, Ward 19
119
  • 33716
Rehabilitation of CBD roads and stormwater, Phase 1, in the KwaDukuza Municipality, Ward 19, KwaDukuza, KwaZulu-Natal. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed at the KwaDukuza Municipality offices 29°31'42.9"S 31°12'21.2"E


Projects

Mulembo-Lelya Hydro Power Project, Zambia
83
  • 26573
The Mulembo-Lelya hydropower project is located between the Central and Eastern provinces of Zambia, on the homonymous rivers. The project includes three main components: an upstream dam on the Mulembo river for the regulation of the flows, a water transfer scheme from Lelya to Mulembo rivers and a downstream


Projects

Tongaat WTW
138
  • 35520
Upgrading of the Tongaat water treatment works located at 9 Rupert Coleman PIace, Tongaat, KwaZulu-Natal. CIDB 8CE. At present the TWTW is operating at an average of 16Mℓ/day and requires further refurbishment to the existing buildings, structures, chambers, mechanical and electrical infrastructure;


Projects

Hammarsdale High-Level Reservoir
30
  • 31322
Construction of Hammarsdale high-level reservoir Phase 2 in Wards 4 and 103, Hammarsdale, KwaZulu-Natal, CIDB 7CE. The scope of work comprises: Construction of 2700m of 500mm steel inlet main. The GPS coordinates of the site are as follows: 29°45'52.0"S 30°39'38.4"E


Projects

Kwamgai Reticulation, Phase 1
130
  • 35417
Construction of gravity main and reticulation pipelines for phase one of the Kwamgai and surrounds in the Ugu District Municipality, KwaZulu-Natal. CIDB 7CE. The scope of work includes the construction of 12.5km gravity mains, 17.5km reticulation pipelines Including bulk connection to existing 2.5ML


Projects

KwaDabeka SR
123
  • 34275
Construction of a sewer reticulation in KwaDabeka, KwaZulu-Natal. CIDB 8CE. This project entails the construction of a sewer reticulation to service 765 units and construction of a sewer collector line to connect the existing sewer collector line adjacent to Dumisani Makhaye Drive Highway (M5 Highway)


Projects

Maselspoort Upgrade Phase 1
129
  • 35776
Phase 1 upgrade of Maselspoort rising main river crossing and refurbishment of pipelines in Maselspoort, near Bloemfontein in the Free State. CIDB: 6CEPE / 7CE GPS coordinates for Maselspoort WTW is -29.032185499124335, 26.405414580209307.


Projects

Nsezi Raw Water Transfer System
112
  • 32519
Upgrades to the Nsezi raw water transfer system in Nsezi, Richardsbay, King Cetshwayo District, Kwazulu-Natal. CIDB 8CE. The construction of 4.5km of DN1500 continuously welded steel pipeline. The GPS location is 28°44’54.74″S, 31°59’0.73″E.


Projects

Hluhluwe WTW, Phase 2
15
  • 36375
Upgrade of phase 2 of the Hluhluwe water treatment works in Hluhluwe, Umkhanyakude District Municipality, KwaZulu-Natal. CIDB 8CE. The scope of works could include the upgrading of the existing rising main pipelines of WTW to command reservoir, construction of bulk supply pipeline. The GPS marker has

Advertising

Send me a Sample Based on these search results