Upgrades and renovations to the Van Wyksrust sewer pump station, Contract 1 at the Olifantsvlei waste water treatment works located along Cavendish Street, in Soweto, Gauteng. CIDB 8CE. The work largely involves repairing and replacing of existing infrastructure and equipment which are either damaged,
Construction of Contract C for Phase 1 of the Stocks Regional Water Supply project in Limpopo. Value of contract R54 525 868,00. The project is located about 60km north east of Polokwane town and situated at Ledwaba (Mmakotse Extension), Mmakotse, Motantanyane and Hwereleng villages within the jurisdiction
Upgrading of the De Doorns Water Works to 6ML/day (civil and structural works), located in de Doorns, Western Cape. CIDB 7CE. The exact GPS co-ordinates are not available so the marker has been placed at the location of the site inspection meeting, 33°28'33.0"S 19°39'50.0"E.
Construction of the Seweding bulk sewer pipeline and main outfall sewer project in Seweding, Mahikeng North West. CIDB 8CE. The exact GPS location is not known and the Marker has been placed at the Mmabatho Wastewater Treatment Plant 25°51'54.1"S 25°33'37.2"E
Construction of the Qumbu waste water treatment plant located in Qumbu, Eastern Cape. The project value is R 54 598 797,85. The majority of the works included in this Phase 1 of the project will be almost located in a pre-selected greenfield site located approximately 1km northwest of Qumbu town, with
Installation of the internal water and sewer reticulation network in Extension 7 in Senekal / Matwabeng in the Free State. CIDB 7CE The exact GPS location is not known and the Marker has been placed at Town Hall in Senekal -28.32023553313903, 27.621392802095784.
Construction of bulk sewer services east of the Coega River in Gqeberha, Eastern Cape. R 84,655,925.14. The scope of work entails completing the construction of the Sonop sewage pump station and the dual 500 mm diameter rising main discharging at the existing Zone 5 sewage pump station. The contract
Upgrading of the Bayside Canal from Blaauwberg Road to Rietvlei, Milnerton, Western Cape. The project value is R 69 172 805,00. The proposed project consists of two components: formalising the cross-section of the Bayside Canal between Blaauwberg Road and the canal outlet at the northwestern corner of
Construction of a 300Ml reservoir, bulk pipelines and associated infrastructure on Portion 5 of Farm Weltevreden No 719 and Portion 12 of Farm Herculus Pilaar No 475 near Muldersvlei, Western Cape. CIDB 9CE. The Muldersvlei reservoir and future water treatment works (phase 3) site is located north of
Construction of the Motantanyane water supply Phase 1: Contract B, Motantanyane, Limpopo. The project value is R56 746 250,00. The exact GPS location is not known and the Marker has been placed at Sefako Makgatho Fire station, Lebowakgomo Zone F (next to Complex) 24°18’29.31”S 29°29’14.19 “E.