Construction of the 10MW Gwayi Shangani hydropower project at Lake Gwayi Shangani, situated in Hwange district, near Cross Mabale. Zimbabwe. Estimated value: US$25 million. Estimated GPS coordinates -18.464764982711454, 27.17069723173317.
The project will entail the construction of a large pumped-storage scheme, situated near Roossenekal, between the Nebo plateau and the Steelpoort river valley, in Limpopo, dubbed "Project Lima". Project Lima is now known as Tubatse Hydropower Pump Storage Scheme and is envisaged as a 1 500 MW plant,
Construction of Phase 1 of the Overberg Wind Farm, located on 15 farm portions of the Swellendam area, Western Cape. Phase 1 will consist of 39 Goldwind 6.2MW turbines which will have a capacity of 380MW once completed. The exact GPS co-ordinates are currently not available so the marker has been place
Lafrica Energy intends to build a 150MW solar power plant in Hwange, Zimbabwe. Estimated cost: US$ 250 million. The GPS coordinates are unknown, and the marker has been placed at the Lafrica Group Offices in Harare -17.752473606230183, 31.003830638895394.
Construction of a 480MW Solar Photoviltaic Facility on Portion 1 of the farm Zwartwitpensbokfontein 434-KQ 10km south-west of Koedoeskop in Limpopo. The solar pv facility will have a total power generation capacity of up to 480MW, covering a total area of approximately 275-hectares and could include:
Expansion of the 5MWS solar plant by an additional 10MW to achieve 15MW at Cross Mabale in Hwange, Zimbabwe. The GPS coordinates are unknown and the marker has been placed at the Solgas Energy Offices in Harare -17.817380370368678, 31.0466122761691.
Construction of bulk and internal services for Salvokop extension 5 situated in Salvokop, Pretoria, Gauteng. The scope is divided into various packages; package 1 - internal civil works, package 3 - reservoir and pipelines work, package 4 - internal electrical works, package 7 - offsite sewer works as
Construction of the Kikot Hydroelectric Scheme in Evodoula on the Sanaga River, Cameroon. The project includes a dam, its water reservoir and a hydroelectric plant. The plant will have a capacity of between 450 and 550MW. The GPS coordinates have been placed at the Kikot hydroelectric project offices
Implementation of the Zesta Project in the Makunduchi area, southeast of the main island of Unguja, Tanzania. As part of the project a 18MW facility will be built that will be equipped with a 40 MWh battery storage system, which will be connected to a 132kV substation to stabilise the power grid. There
The Bumbuna Phase 2 project is expected to significantly increase the power capacity of the Bumbuna hydroelectric plant by 500% from 50MW to 250MW, Phase 2 will be done in 2 stages : Stage 1 will comprise four 33 MW turbines at the Bumbuna extension and dam upstream at Yiben. Stage 2 will comprise two