Construction of a commercial Concentrated Solar Power (CSP) facility near Upington, in the Northern Cape, hereafter referred to as the Solis 2. The exact co-ordinates are currently not available however the marker has been placed near Upington at 28°20'50.1"S 20°51'33.3"E
Construction of the 75MW AMDA Charlie solar PV facility on portion 1 of N'Rougas Zuid no 121, Straussheim in the Northern Cape. The exact co-ordinates are currently not available however the marker has been place on portion 1 of N'Rougas Zuid no 121 29°07'27.1"S 21°16'49.7"E.
Construction of the Arab Republic of Egypt Dry Port in Egypt and the Middle East, also known as the Damietta Dry Port. The development will be connecting the Middle East and Africa. Works will include container terminals, railway lines, dry ports and cargo distribution areas. The project is estimated
Moyeng Energy (Pty) Ltd is proposing to establish a commercial wind energy facility and associated infrastructure on a site located near Suurplaat in the Western and Northern Cape Provinces. An area which falls within the Laingsburg Local Municipality (Western Cape); and the Karoo Hoogland Local Municipality
Periodic maintenance on National Route 7 Section 8 from Brakfontein at km 7.80 to Vioolsdrift at km 116.58 in the District Municipality of Namakwa and Local Municipality of Nama-Khoi, Northern Cape. The GPS marker has been placed along the proposed construction route 30°46'36.5"S 18°05'40.6"E
Resurfacing of the National Route R40 Section 2 from Barberton at km 0.0 to Mbombela at km 35.60 in the District Municipality of Ehlanzeni, Mpumalanga. The GPS marker has been placed at the start of construction in Barberton 25°44'10.8"S 30°59'28.2"E.
Construction of the 75MW AMDA Bravo solar PV facility on portion 1 of N'Rougas Zuid no 121, Straussheim in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Portion 1 of N'Rougas Zuid No 121 29°07'25.3"S 21°16'44.1"E.
Construction of the Paulputs 300MW Wind Energy Facility and the associated infrastructure approximately 50 km (centre point of the site) northeast of Pofadder and approximately 80 km northwest of Kakamas in the Northern Cape. The scope of works also includes a 132 KV grid connection. The development
Upgrade of National Route R75 Section 3 from Uitenhage at km 5.0 to Kirkwood Intersection at km 31.0, Sundays River Valley Local Municipality, Nelson Mandela Bay Metropolitan Municipality, Sarah Baartman District Municipality, Eastern Cape. The GPS marker has been placed along the construction route
Upgrading of the Mahlabathini water infrastructure located in the Thembisile Hani Local Municipality, Mpumalanga. Value of R51 994 351.69. Scope of works for Phase 1 could include: site clearance and earthworks, accommodation of traffic, construction of 250mm diameter uPVC pipes, class 12 - 3000m, installations