Construction of a mixed-use hotel development to be known as the JW Marriott Hotel along Walter Carrington Crescent, Victoria Island, Lagos, Nigeria. Scope of works could include: the construction of a 28-storey, 245-unit twin-tower development, high-end retail spaces, wellness and entertainment facilities,
Construction of a new shopping centre to be known as Mikeva Link, located on Louis Fourie Road in Mossel Bay, Western Cape. The existing fire damaged Mikeva Hyper will be demolished and will be included in the new mall, which will have a GLA of ± 13 000 m². The GPS co-ordinates are 34°10'57.4"S 22°06'44.3"E.
Construction of Block G consisting of 72, two-bedroom units at SJ Smith CRU, Ward 75 at 20 Swinton Road, Ethekwini Metropolitan Municipality, Durban, Kwazulu-Natal. CIDB 7GB. The GPS location is -29.9478094, 30.9492514.
Construction of Block C consisting of 72, two-bedroom units at SJ Smith CRU, Ethekwini Metropolitan Municipality, Durban, Kwazulu-Natal. CIDB 7GB. The GPS location is 29°56'52.1"S 30°56'57.3"E
Construction of an Ascott Hotel in the Durban Point area, in KwaZulu-Natal. The exact co-ordinates are currently not available however the approximate area of location is: -29.870290, 31.046126
Construction of a Specialised Lecture Theatre at Ga-Rankuwa Campus, Tshwane University of Technology, Pretoia, Gauteng. CIDB 7GB. GPS coordinates, -25.7510062, 28.1883019.
The Lesotho-Botswana Water Transfer (L-BWT) project consist of three major infrastructure components: the storage dam, the hydropower facilities, and the massive conveyance system
The Government of the Republic of Botswana through the Ministry of Minerals, Energy and Water Resources has applied for financing from the Multi-Donor Trust Fund for Cooperation in International Waters in Africa (CIWA), administered by the World Bank, toward the cost of a study for the possibilities
Construction of the extension of the Digistics Warehouse within zone 1 of the Coega Industrial Development zone in Gqeberha, Eastern Cape. CIDB 7GB. Scope of works could include but not limited to: 4250m2 extension to existing warehouse (11m eaves height), 160m2 extension to existing office block (concrete