Construction of a 75MW solar PV energy facility near Kathu in the Northern Cape on portion 2 of the farm 460 Legoko. The exact co-ordinates are currently not available however the marker has been placed on the Farm 460 Legoko Portion 2 -27.754382, 23.099252
Construction of the Wolseley Wind Farm and associated infrastructure on Farm Romans Rivier RE/320, Farm Romans Rivier No. 22/320, Farm De Liefde C RE/334, Farm De Liefde C No. 5/334, Farm De Liefde RE/6/323, Farm Kleineberg No. 64/208, Farm Vaalvlei RE/324, Farm Kleineberg RE/21/208, Farm De Liefde No. 7/323, located between Worcester and Wolseley in the Western Cape. The site is approximately 1,961ha. The GPS marker has been placed on Farm De Liefde: -33.485472, 19.212602
Construction and establishment of a 133MW Castle Wind Energy Facility near De Aar in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near De Aar -30.662136, 23.967063
Construction of the 140MW Platberg Wind Energy Facility in the Ubuntu Local Municipality and the Pixley KaSeme District Municipality, 25 km south from Victoria West, 40 km north from Murraysburg and 40 km west from Richmond in the Northern Cape
Establishment of the Tollie Solar Energy, a Photovoltaic (PV) solar energy facility. The facility will be established over an area of less than 20ha on a site located approximately 11km south of Noupoort, in the Northern Cape. The Tollie Solar Energy facility is proposed on the remaining extent of Portion 1 of Farm Naauw Poort 1.
Construction of Visserspan Solar Photovoltaic Facility Project 3, covering an area of around 222ha, circumscribed with a perimeter fire access road and fence located on Farm Visserpan No. 40, approximately 10km northwest of Dealesville and 68km northwest of Bloemfontein, Free State. The PV tables will be raised approximately 500mm above ground level and will have a single-axis tracking system allowing the generation of not more than 100MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, maintenance shed, inverter transformer, stations on concrete pads and office buildings all within the 222ha proposed development site footprint, as well as switch panel and an overhead powerline from the PV array for connection to the power grid. Co-ordinates: 28°34'57.17"S; 25°43'50.59"
Construction of a 75 MW photovoltaic (PV) solar facility as well as associated infrastructure on a site located approximately 50 km east of Upington, in the Northern Cape Province. The proposed facility will be located on the remaining extent of the farm Albany 405, 50 km east of Upington. The exact co-ordinates are currently not available however the marker has been placed on farm Albany 405 -28.380871, 21.736790
Construction of the Witte Wall PV 2 175MW solar photovoltaic facility on Farm Witte Wall RE 17, Touws River, Western Cape. The GPS marker has been placed on Farm Witte Wall: -32.996755, 20.004511
Construction of a industrial plant, Phase 3, for the Prieska Power Reserve Hub about 10 km southeast of Prieska in the Northern Cape. The GPS co-ordinates are Latitude -29.704092 Longitude 22.759953.
Construction of a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of portion 2 of the farm Ruby Vale No. 266, Registration Division Gordonia in the Northern Cape. The town of Postmasburg is located approximately 46km east and the town of Olifantshoek is located approximately 35km north north east of the proposed development.
Proposed construction of the 55.5MW Springbok wind power generating facility on the farm O'Nabapeep near Springbok, within the Nama Khoi Local Municipality in the Northern Cape Province. he exact co-ordinates are currently not available however the marker has been placed on farm O'Nabapeep -29.596374, 17.794103
Construction of three 75MW solar PV power generation facilities and associated electrical infrastructure on the remaining extent of Onder Rugzeer Farm 168 north east of Kenhardt in the Northern Cape province. Kenhard PV Two Solar Facility. The exact co-ordinates are currently not available however the marker has been placed on Onder Rugzeer Farm 168 -29.273964, 21.282465
Construction of the Duneveld Photovoltaic plant with 100MW generation capacity located on the Remaining Extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MWh battery energy storage system. The exact co-ordinates are currently not available however the the marker has been placed on Farm Geelkop 456 -28.581584, 21.002489
Construction of a 75MW photovoltaic solar energy facility on portion 6 of farm 232, Swellendam, remainder of the farm 232, Swellendam and portion 19 of the farm 170, in the Bonnievale area in the Western Cape. The GPS co-ordinate marker has been placed on Farm
Construction of Hyperion solar development 4, a photovoltaic (PV) solar energy facility (SEF) with a contracted capacity of up to 75MW, located on the remaining extent of the farm Lyndoch 432 situated 16km north of Kathu in the Northern Cape Province. The proposed projects fall within the jurisdiction of the Gamagara Local Municipality and within the greater John Taolo Gaetsewe District Municipality. The exact co-ordinates are currently not available however the possible area of location is -27.2210388, 23.1918021
Construction of the proposed Soventix solar PV 2 project on the farm Goedehoop, NR Hanover in the Pixley Ka Seme district, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Goedehoop -27.158823, 22.969049
Development of a 75MW solar power facility 30km north-east of Kenhardt on on portions 8 of Gemsbok Bult Farm 120 in the Northern Cape. The proposed project is located directly alongside the proposed Nieuwehoop Solar Development. The exact co-ordinates are currently not available however the marker has been placed on Gemsbok Bult Farm 120 -29.114586, 21.417123
Construction of a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of portion 2 of the farm Ruby Vale No. 266, Registration Division Gordonia in the Northern Cape. The town of Postmasburg is located approximately 46km east and the town of Olifantshoek is located approximately 35km north-north east of the proposed development.
Construction of a proposed 75MW solar PV facility located near the town of Kathu in the Northern Cape Province. The exact co-ordinates are currently not available however the possible area of location is -27.701905, 23.088845
Establishment of the Korana Solar Energy Facility (75MW) for a wind and solar energy facility and associated infrastructure with a broader site of 175km². The site is located 22km southeast of Pofadder in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed South East from Pofadder -29.175176, 19.476641
Construction of photovoltaic solar energy facilities, for Nexergy Solar (Pty) Ltd, with a generating capacity of 75MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: 30 38'52.47" S; 24 5'33.11" E.
Construction of a 100MW photovoltaic solar energy facility to be known as Bloemsmond Solar 4 which will be developed on two farm portions, portions 5 and 14 on the farm Bloemsmond 455, Upington in the Northern Cape province. It is proposed to build three facilities and the net generating capacity of each proposed PV solar energy facility will be up to 100MW. The exact co-ordinates are currently not available however the marker has been placed on farm Bloemsmond 455 -28.555525, 21.023792
Construction of a 75MW Solar PV Power Plant on the farm Badenhorst Dam, near De Aar in the Northern Cape.
Construction of Visserspan Solar Photovoltaic Facility Project 2 covering an area of around 2 223ha, circumscribed with a perimeter fire access road and fence on Farm Visserpan No. 40, approximately 10km northwest of Dealesville and 68km northwest of Bloemfontein, Free State. The PV tables will be raised approximately 500mm above ground level and will have a single-axis tracking system allowing the generation of not more than 100MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, maintenance shed, inverter transformer, stations on concrete pads and office buildings all within the 223ha proposed development site footprint, as well as switch panel and an overhead powerline from the PV array for connection to the power grid. Co-ordinates: 28°35'6.27"S; 25°43'44.02"E.
Construction of the proposed 150MW Letsoai CSP 1 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma local municipality under the jurisdiction of the Namakwa district municipality, in the Northern Cape Province. The exact co-ordinates are currently not available however the marker has been placed on farm Hartebeest Vlei 86 -29.411378, 18.925643
Construction of the New Hope 2 Solar Park with associated infrastructure and structures on the remaining extent of the farm N'Rougas Zuid, 121, located within the Kai !Garbi Local Municipality, ZF Mgcawu District Municipality, Northern Cape. The power plant will have a maximum generation capacity of up to 300 MW. The exact co-ordinates are currently not available however the central co-ordinates of the development footprint is 29°09'10.1"S 21°09'57.4"E
Construction of a wind energy facility and associated infrastructure, Kokerboom 1 wind farm in the Northern Cape. Kokerboom 1 wind farm is located on farm portions Leeuwberg Rivier (RE/1163) and Kleine Rooiberg (RE/227) approximately 50km north of Loeriesfontein, 85km west of Brandvlei and 160km southeast of Springbok. he exact co-ordinates are currently not available however the marker has been placed on farm Leeuwberg Rivier -30.475680, 19.364600
Construction of Hyperion solar development 1, a photovoltaic (PV) solar energy facility (SEF) with a contracted capacity of up to 75MW, located on the remaining extent of the farm Lyndoch 432 situated 16km north of Kathu in the Northern Cape Province. The proposed projects fall within the jurisdiction of the Gamagara Local Municipality and within the greater John Taolo Gaetsewe District Municipality. The exact co-ordinates are currently not available however the possible area of location is -27.2210388, 23.1918021
Construction of the proposed Kotulo Tsatsi Energy up to 100MW PV Two Facility as part of the construction of up to 1000MW Concentrated Solar Power (CSP) Energy Facility located on a site near Kenhardt in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -29.312019, 21.234645
Construction of four 75MW photovoltaic (PV) solar facilities on portion 3 of the farm Zuurwater 62, approximately 9 km south-west of Aggeneys in the Northern Cape. Phase 4. The exact co-ordinates are currently not available however the marker has been placed on farm Zuurwater -29.308056, 18.733400
Construction of the proposed 120MW Witberg Wind Energy Facility comprising 25 wind turbines and associated infrastructure, located in the Central Karoo District Municipality and the Laingsburg Local Municipality on the following properties: remainder of the Farm Jantjesfontein 164; remainder of the Farm Besten Weg 150; remainder of Portion 1 of the Farm Besten Weg 150; remainder of the Farm Tweedside 151; remainder of the Farm Elandskrag 269; Portion 1 of the Farm Elandskrag 269 in the Western Cape. The exact co-ordinates are currently not available however the possible area of location is -33.186728, 20.856396
Construction of the Hari photovoltaic plant with 100MW generation capacity located on the remaining extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MW battery energy storage system. The exact co-ordinates are currently not available however the the marker has been placed on Farm Geelkop 456 -28.581584, 21.002489
Construction of the Guntsfontein Renewable Energy Facility on a site near Sutherland in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near Sutherland -32.415905, 20.668655
Construction of the proposed 75MW Enamandla PV 3 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma local municipality under the jurisdiction of the Namakwa district municipality, in the Northern Cape Province. The exact co-ordinates are currently not available however the marker has been placed on farm Hartebeest Vlei 86 -29.411381, 18.925630
Construction of a wind energy facility in Mossel Bay, in the Western Cape.
Construction of the Gunsfontein switching station, 132kv overhead power line and ancillary infrastructure for the proposed wind farm situated near Sutherland, Northern Cape. The project site is located approximately 50km north of Matjiesfontein and 30km south of Sutherland within the Karoo Hoogland Local Municipality, which falls under the jurisdiction of the Namakwa District Municipality and is located on the following properties: Remainder of the Farm Gunstfontein 131; Remainder of the Farm Boschmans Hoek 177; Remainder of the Farm Wolven Hoek 182; Remainder of the Farm Zwanepoelshoek Re/184; and Remainder of the Farm Leeuwe Hoek 183. The exact co-ordinates are currently not available however the approximate area of location is -32.4100977, 20.670528
Construction of the proposed 75 MW photovoltaic (PV2) solar power development on the remaining extent of farm Bokpoort 390 which is 20 km north-west of the town of Groblershoop within the !Kheis Local Municipality in the ZF Mgcawu District Municipality, Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -28.810149, 21.821917
Construction of four 75MW photovoltaic (PV) solar facilities on portion 3 of the farm Zuurwater 62, approximately 9 km south-west of Aggeneys in the Northern Cape. Phase 1. The exact co-ordinates are currently not available however the marker has been placed on farm Zuurwater 62 29.308047, 18.733378
Construction and development of three wind turbines each with 5.8MW on farm 143, Wesley, Eastern Cape. The wind turbines will have a 170-meter rotor diameter and 134-meter hub height. The scope of works will include the concrete foundation, cabling between turbines, on-site substation, transformer station for each wind turbine, access roads, administration, and office buildings. The exact co-ordinates are currently not available however the approximate area of location is Latitude -32.2968402 Longitude 26.419389
Construction of the Shrubland photovoltaic plant with 100MW generation capacity located on the remaining extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MWh battery energy storage system. The exact co-ordinates are currently not available however the the marker has been placed on Farm Geelkop 456 -28.581584, 21.002489
Construction of the proposed Aletta 140MW wind energy facility near Copperton in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near Copperton -30.026485, 22.339413
Establishment of the Khai-Ma Wind Energy Facility (140MW) for a wind and solar energy facility and associated infrastructure with a broader site of 175km². The site is located 22km southeast of Pofadder in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed The exact co-ordinates are currently not available however the marker has been placed southeast of Pofadder -29.225662, 19.452517
Construction of the Paarde Valley Solar PV Plant, and 132kV overhead power lines with associated grid connection, in the Inxuba Yethemba Local Municipality, Chris Hani District Municipality, Eastern Cape. The generation capacity of the solar PV facility and the layout of the PV arrays will be dependent on the outcome of the specialist studies conducted within the EIA. The exact co-ordinates are currently not available however the approximate area of location is in the Chris Hani District Latitude -31.9317034 Longitude 25.3785719.
Construction of the 75MW AMDA Alpha solar PV facility on portion 1 of N'Rougas Zuid No 121, Straussheim in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Portion 1 of N'Rougas Zuid No 121 -29.123680, 21.278914
Establishment of the Manlenox renewable energy generation facility. The project will consist of the construction, operation and maintenance of a 75MW PV Power Plant with associated infrastructure and structures. The facility will include a workshop and warehouse and control building with offices. The project site is on remainder of the Farm Grootvlei 296, within the Kgatelopele Local Municipality, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm Grootvlei 296 -28.354477, 23.772983
Construction of four 75MW photovoltaic (PV) solar facilities on portion 3 of the farm Zuurwater 62, approximately 9 km south-west of Aggeneys in the Northern Cape. Phase 2. The exact co-ordinates are currently not available however the marker has been placed on farm Zuurwater -29.308056, 18.733400
Construction of photovoltaic solar energy facilities, for Lehlasedi Energy (Pty) Ltd), with a generating capacity of 75MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: -29.961213, 22.318998
Establishment of the Tutwa Solar Energy Facility, a Photovoltaic (PV) solar energy facility for the purpose of electricity generation. The facility will be established over an area of less then 20ha on a site approximately 85km north-west of Kakamas, and approximately 43km west of Aurgabies, in the Northern Cape. The Tutwa Solar Energy Facility is proposed on Portion 4 of Farm Narries 7. The exact co-ordinates are currently not available however the marker has been placed on farm Narries -28.528396, 19.863303
The establishment of the Southern Cross Solar Energy Facility, a photovoltaic (PV) solar energy facility. The facility will be established over an area of less than 20ha on a site approximately 85km north-west of Kakamas, and approximately 48km west of Augrabies in the Northern Cape. The Southern Cross Solar Energy Facility will be located on the farm Southern Farm 425. The GPS co-ordinate marker has been placed on Farm
Construction of the East Solar Park renewable energy facility. The project will consist of the construction of a Photovoltaic (PV) Pwer Plant with associated infrastructure and structures having a generating capacity of up to 75MW. The footprint of the solar park will be up to 180 hactares, within the property. The site is on the Remaining Portion and Portion 2 of the Farm East No. 270 Kuruman RD, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm East No. 270 -27.158832, 22.969028
Construction of the 125MW Geelstert 1 Solar photovoltaic facility located on the Remaining Extent of the Farm Bloemhoek 61, 11km south-east of Aggeneys within the Khâi-Ma Local Municipality, and the Namakwa District Municipality, Northern Cape. The facilities will be connected to the Aggeneis MTS via a collector substation and an overhead power line with a capacity of up to 220kV and the project falls within the Springbok Renewable Energy Development Zone (REDZ 8) as well as the Northern Strategic Transmission Corridor. The exact co-ordinates are currently not available however the marker has been placed on Farm Bloemhoek -29.307358, 18.940681
Construction of a 100MW photovoltaic solar energy facility to be known as Bloemsmond Solar 3 which will be developed on two farm portions, portions 5 and 14 on the farm Bloemsmond 455, Upington in the Northern Cape province. It is proposed to build three facilities and the net generating capacity of each proposed PV solar energy facility will be up to 100MW. The exact co-ordinates are currently not available however the marker has been placed on farm Bloemsmond 455 -28.555525, 21.023792
Establishment of a commercial solar energy facility and associated infrastructure on the remaining extent of the farm Wincanton 472, which lies approximately 16km south east of Kathu in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Wincanton 472 -27.585747, 22.926827
Construction of the Kgalalelo 115MW photovoltaic solar energy facility and associated infrastructure on the remaining extent of Portion 2 of the farm Ruby Vale No. 266, approximately 35km South West of Olifantshoek, Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -27.888779, 22.614749
Construction of the 130MW Bolobedu Photovoltaic Energy Solar Facility on the remainder of the farm Kromrivierfontein 360LT and the remainder of the farm Worcestor 200LT south-west of the town of Giyani within the Letaba Local Municipality of the Limpopo Province. The exact GPS is not available however it is in the general area of 23°30'53.7"S 30°24'34.1"E
Construction of the proposed Maralla East wind energy facility near Sutherland in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near Sutherland -32.419777, 20.666864
Construction of a 200MW wind energy facilty and associated infrastructure approximately 20km south of Sutherland in the Northern Cape.
Construction of a concentrated solar power (CSP) project and associated infrastructure on the remaining extent of the farm 207, portion 1 and portion 4 of farm Carolus Poort 167, situated 4km north west of Noupoort. The proposed site falls under the jurisdiction of the Umsobomvu Local Municipality and within the greater Pixley ka Seme district municipality in the Northern Cape. The Noupoort concentrated solar power project is proposed to be up to 150MW in capacity and will be constructed over an area of approximately 900ha in extent within the broader project site.
Construction of the Karroid photovoltaic plant with 100MW generation capacity located on the remaining extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MWh battery energy storage system. The exact co-ordinates are currently not available however the the marker has been placed on Farm Geelkop 456 -28.581584, 21.002489
Construction of the Skeerhok PV1 100MW solar photovoltaic facility on portion 0 of the farm Smutshoek 395, north-east of Kenhardt, Northern Cape province. The exact co-ordinates are currently not available however the marker has been placed on Farm Smutshoek 395 -29.017915, 21.390629
Construction of a photovoltaic (PV) solar energy facility, Sirius Two. The facility will be situated approximately 20km southwest of Upington, in the Northern Cape. The facility will have the capacity to supply 75 mw and will include the following infrastructure: a series of PV panels; a new substation; mounting structure to support the PV panels; underground cabling; internal roads and fencing; a workshop for maintenance and offices.
Construction of the proposed concentrated solar power plant and associated infrastructure on the farm Sand Draai 391 in the Northern Cape. The facilities will also include ancillary infrastructure in support of the power plants including: water abstraction systems, waste management systems, power lines, roads, storage facilities, administration and operation buildings, construction laydown areas and temporary housing facilities. The exact co-ordinates are currently not available however the marker has been placed on Sand Draai 391 -28.719888, 21.950899
Construction of a solar photovoltaic facility in Danielskuil on erf 753, a portion of Erf 1, within the Kgatelopele Local Municipality, Barkley West registration division, Northern Cape. The proposed development is an array of 18 540 crystalline solar photovoltaic (PV) modules grouped into tables or panels of 20 modules each. It is proposed that the PV tables would form an array covering an area of 20ha, circumscribed with a perimeter fire access road and fence. The PV tables will be raised approximately 500mm above ground level and will have single axis tracking systems allowing the generation of approximately 5MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, a maintenance shed, six central inverters and three transformers on concrete pads, one to two office buildings on the 20ha site and a switch panel for connection to the power grid, as well as a 22kV powerline connection from the PV array to feed in to Eskom’s Ouplaas substation. The exact co-ordinates are currently not available however the approximate area of location is -28.2854106, 23.6680747
Construction of 20MW Kheis Solar Park 3. Gestamp Asetym Solar South Africa (Pty) Ltd is proposing to establish a commercial Photovoltaic Solar Energy Park with a total generating capacity of 225 MW to be developed in 3 separate phases of 75MW each. The phases are referred to as: Kheis Solar Park 1; Kheis Solar Park 2; Kheis Solar Park 3. The sites are located approximately 70km south-east of Upington, in the Northern Cape. Due to the sensitivities of the site location the size was brought down to 20MW. The exact co-ordinates are currently not available however the possible area of location is -28.507662, 21.343571
Development of Kenhardt PV 6, 115MW solar photovoltaic facility and associated electrical infrastructure approximately 30km north-east of Kenhardt, in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -29.275044, 21.263518
Development of the Geelstert 2 Solar photovoltaic facility, with a contracted capacity of up to 125MW located on the Remaining Extent of the Farm Bloemhoek 61, 11km south-east of Aggeneys within the Khâi-Ma Local Municipality, and the Namakwa District Municipality, Northern Cape. The facilities will be connected to the Aggeneis MTS via a collector substation and an overhead power line with a capacity of up to 220kV. The projects fall within the Springbok Renewable Energy Development Zone (or REDZ 8) as well as the Northern Strategic Transmission Corridor. The GPS marker has been placed on Farm Bloemhoek 61, -29.307949, 18.940271
Construction on the 75MW Khoi-Sun Development photovoltaic renewable energy facility and associated infrastructure on a portion of Farm 426, Skuitdrift, adjacent to the Schuitdrift Substation, approximately 106km northeast of Pofadder and 115km northwest of Kakamas, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Skuitdrift 426 -28.571050, 19.732055
Construction of the 100 MW Irene Photovoltaic Solar Energy Facility and supporting electrical infrastructure, as part of the Kentani Solar Development in the Free State. The proposed development will be located within 12km from Dealesville, in the Tokologo Local Municipality, which is located in the Lejweleputswa District Municipality, 50km south-east of Boshof and 70km north-east of Bloemfontein. Approximate GPS Coordinates: -28.764197, 25.683711.
Establishment of the Jouren Solar Facility, a commercial solar energy facility on a site located approximately 30km north-east of Prieska, in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -29.659358, 22.831852
Development of Kenhardt PV 4, 115 MW Solar Photovoltaic facility and associated electrical infrastructure approximately 30km north-east of Kenhardt, in the Northern Cape. The GPS marker has been placed 30km north-east of Kenhardt, -29.139946, 21.399542
Construction of Sirius Three PV facility with the contracted capacity of up to 100MW. The PV facility will be located within the remaining extent of the farm Tungsten Lodge No. 638, located 20km South West of Upington in the Northern Cape. The proposed developments fall within the jurisdiction Kai !Garib and Dawid Kruiper Local Municipalities in the greater ZF Mgcawu District Municipality. GPS coordinates lat; -28.335140; long: 21.75874.
Construction of a commercial Concentrated Solar Power (CSP) facility near Upington, in the Northern Cape Province, hereafter referred to as the Solis 2. he exact co-ordinates are currently not available however the marker has been placed near Uppington -28.523017, 21.086982
Development of Kenhardt PV 5, 115 MW Solar Photovoltaic facility and associated electrical infrastructure approximately 30km north-east of Kenhardt, in the Northern Cape. GPS coordinates lat: -29.121940; long: 21.175968.
Construction of a 100 MW solar photovoltaic facility (Skeerhok PV2) on portion 9 of Gemsbok Bult farm 120, north-east of Kenhardt, Northern Cape province. he exact co-ordinates are currently not available however the marker has been placed on farm Gemsbok Bult -29.080586, 21.437680
Construction of Kronos Solar Farm PV Two, a 75 MW photovoltaic energy plant on portion 6 of farm 103 near Copperton in the Northern Cape. A total of four PV plants will be built in this area. The exact co-ordinates are currently not available however the marker has been placed on farm 103 -28.256211, 24.632221
Construction of photovoltaic solar energy facilities, for Ikusasa Energy (Pty) Ltd, with a generating capacity of 30MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: 30 38'52.47" S; 24 5'33.11" E.
Construction of a wind energy facility on Portion 1 of Farm 190 and RE of Farm 190, Eastern Cape with a total footprint of 4.3 ha. The proposed project site is situated on the remainder of Farm 190, portion 1 of Farm 190, the remainder of Farm 227 and Farm 288 in Grassridge within the Nelson Mandela Bay Municipality (NMBM). It is located directly north of Zone 14 of the Coega Industrial Development Zone (IDZ) and approximately 15km north-east of Port Elizabeth in the NMBM. It will consist of 8 turbines with a maximum output of approximately 24 mega watts, each turbine will be connected to the Grassridge and / or Olifantskop substations via underground cables of approximately 22 kV, an overhead power line (132kV distribution line) feeding into the electricity distribution network/grid and the construction of an access road of approximately 4m wide.
Construction of the new Xhosa photovoltaic plant with a capacity of 200MW located on the north eastern Portion of the remaining extent of the Farm Bokpoort 390, Groblershoop within the !kheis Local municipality Northern Cape. The exact co-ordinates are currently not available however the has been placed on the Farm Bokpoort 390 -28.788649, 21.936171
Construction of a 200MW concentrated solar power plant on the Farm Rooipunt 617 near Upington in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm Rooipunt 617 -28.478678, 21.023268
Development of a 75MW solar power facility 30km north-east of Kenhardt on remainder of Boven Rugzeer 169, in the Northern Cape. Known as the Nieuwehoop Solar Development, consisting of the Gemsbok Solar PV1, Gemsbok Solar PV2 and Boven Solar PV1 solar projects.
Construction of a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of portion 1 of the farm Lime Bank No. 471, Registration Division Kuruman in the Northern Cape. The town of Kathu is located approximately 18km south east of the proposed development.
Construction of the 75MW AMDA Charlie solar PV facility on portion 1 of N'Rougas Zuid no 121, Straussheim in the Northern Cape. The exact co-ordinates are currently not available however the marker has been place on portion 1 of N'Rougas Zuid no 121 -29.124194, 21.280481
Construction of the 175MW Hoek Doornen Photovoltaic 1 facility within the Witzenberg Local Municipality, which falls within the Cape Winelands District Municipality, and are situated approximately 90km from Ceres and 70km from Touws River, Western Cape. The GPS marker has been placed on farm Hoek Doornen 172: -32.999912, 19.941953
Construction of the 55MW Kheis Solar Park 2. Gestamp Asetym Solar South Africa (Pty) Ltd is proposing to establish a commercial Photovoltaic Solar Energy Park with a total generating capacity of 225 MW to be developed in 3 separate phases of 75MW each. The phases are referred to as: Kheis Solar Park 1; Kheis Solar Park 2; Kheis Solar Park 3. The sites are located approximately 70km south-east of Upington, in the Northern Cape. Due to the sensitivities of the site location, the size of this Kheis Solar Park 2 was brought down to 55MW. The exact co-ordinates are currently not available however the marker has been placed on Farm Namakwari 656 -28.527796, 21.059888
Construction of two commercial solar thermal electricity generating facilities on a site which lies 20km west of Upington in the Northern Cape. The proposed Upington Thermal Plant Two will consist of heliostats and a Power Tower system with a generation capacity of 150MW. Each facility would include the following infrastructure: access roads, power island, substation, power line, water abstraction point and supply pipe line, water storage tanks, packaged water treatment plant, lined evaporation ponds, salt storage tanks, auxiliary fossil fuel boilers and workshop and office buildings. Each project will be located on different areas on portion 3 of the Farm McTaggarts Camp 453, which falls within the Kai! Garib Local Municipality. he exact co-ordinates are currently not available however the marker has been placed on farm McTaggarts Camp 453 -28.520765, 21.059715
Construction of Kronos Solar Farm PV One, a 75 MW photovoltaic energy plant on portion 6 of farm 103 near Copperton in the Northern Cape. A total of four PV plants will be built in this area. The exact co-ordinates are currently not available however the possible area of location is -29.966369, 22.334343
Establishment of the Avondale Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion 1 of the Farm Avondale No 410, Gordonia, in the Upington area, in the Northern Cape. Access to the site will be from the N14 national road, which runs on the southern boundary of the property. The exact co-ordinates are currently not available however the marker has been placed on farm Avondale -28.309708, 21.588407
Construction of the Hartebeest Leegte wind farm near Loeriesfontein in the Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is -30.908556, 19.439321
Construction of grid connection infrastructure for the Zonnequa wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following properties: Remaining extent of the farm Zonnekwa 326, Remaining extent of the farm Kannabieduin 324, Remaining extent of the farm Honde Vlei 325, Remaining extent of farm Sand Kop 322, Remaining extent of farm Mannels Vley 321, Remaining extent of farm Dikgat 195, and portion 15 of the farm Dikgat 195. The exact co-ordinates are currently not available however the approximate area of location is -29.0466808, 21.8568586
Construction of the Visserspan Solar Photovoltaic Facility Project 1 covering an area of around 218ha, circumscribed with a perimeter fire access road and fence located on Farm Visserpan No. 40, approximately 10km northwest of Dealesville and 68km northwest of Bloemfontein, Free State. The PV tables will be raised approximately 500mm above ground level and will have a single-axis tracking system allowing the generation of not more than 100MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, maintenance shed, inverter transformer, stations on concrete pads and office buildings all within the 218ha proposed development site footprint, as well as switch panel and an overhead powerline from the PV array for connection to the power grid. Co-ordinates: 28°34'52.68"S; 25°43'20.55"E.
Construction of Bayview Wind Farm, 30km from Port Elizabeth, Eastern Cape. The scope of works includes operational and maintenance buildings, internal roads, cabling, an on-site switching station and a maximum of 45 wind turbines, with a net generating capacity of 135MW.
Construction of photovoltaic solar energy facilities, for Khaliphile Energy (Pty) Ltd, with a generating capacity of 75MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: 30 38'52.47" S; 24 5'33.11" E.
Construction of the 175MW Hoek Doornen photovoltaic 4 facility in the Witzenberg Local Municipality, which falls within the Cape Winelands District Municipality, and ais situated approximately 90 km from Ceres and 70 km from Touws River, Western Cape. The GPS marker has been placed on farm Hoek Doornen 172: -32.999912, 19.941953
Establishment of the Carodex renewable energy generation facility. The project will consist of the construction, operation and maintenance of a PV Power Plant with associated infrastructure and structures. The facility will include a workshop and warehouse and control building with offices. The project site is the portion 1 of the farm Klein Kareelaagte 168 in the Siyancuma Local Municipality, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Klein Kareelaagte -29.362016, 24.472097
Establishment of the Dida Solar Energy Facility. The facility will be established over an area of less than 20ha on a site located approximately 26km north of Noupoort, in the Northern Cape, on portion 3 of Farm Rietfontein 140. The facility will have a maximum generating capacity of up to 20 MW.
Construction of a 40MW solar photovoltaic plant on Mierdam Farm near Prieska in the Northern Cape Province. The exact co-ordinates are currently not available however the approximate area of location is -29.7069446, 22.739048
Construction of the Spitskop East Wind Energy Facility and associated infrastructure on a site north-west of Riebeek East, Eastern Cape. Up to 57 wind turbines are proposed to be constructed over an area of approximately 200 km² in extent.
Construction of grid connection infrastructure for the Namas wind farm in the Northern Cape. The scope of works will include the construction of a collector substation, a double - circuit 132kV power line and infrastructure including access roads and laydown areas. This development traverses the following properties: Portion 3 of farm Zonnekwa 328, Portion 2 of farm Zonnekwa 328, Portion 1 of farm Zonnekwa 326, Remaining extent of Zonnekwa 326, Remaining extent of farm Honde Vlei 325, Remaining extent of farm Kannabieduin 324, Remaining extent of farm Sand Kop 322, Remaining extent of farm Mannels Vley 321, Remaining extent of farm Dikgat 195, Portion 15 of farm Dikgat 195, and remaining extent of farm Rooivlei 327.
Construction of a 300MW Kleinzee wind energy facility and the associated infrastructure in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is within Kleinsee. -29.678251, 17.0687079
Establishment of the Poortjies Wind Energy Facility (140MW) for a wind and solar energy facility and associated infrastructure with a broader site of 175km². The site is located 22km southeast of Pofadder in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed southeast of Pofadder -29.225662, 19.452517
Construction of a 125MW CSP (Solis 1 Concentrated Solar Power) Project, located near Upington in the Northern Cape. Previously known as Sasol CSP Facility. The exact co-ordinates are currently not available however the GPS marker has been placed near Uppington -28.513486, 21.084673
Construction of a 100 MW Solar Photovoltaic Facility (Skeerhok PV3) on portion 0 of the farm Smutshoek 395, north-east of Kenhardt, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm Smutshoek 395 -29.017915, 21.230616
Construction of the 75 MW Boschrand 2 Photovoltaic Solar Energy Facility and supporting electrical infrastructure, as part of the Kentani Solar Development in the Free State. The proposed development will be located within 12km from Dealesville, in the Tokologo Local Municipality, which is located in the Lejweleputswa District Municipality, 50km south-east of Boshof and 70km north-east of Bloemfontein. Approximate GPS Coordinates: -28.734136, 25.742675.
Establishment of the Carolusberg Solar Energy Facility, a commercial solar energy facility and associated infrastructure for the purpose of electricity generation on a site near Carolusberg, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near Carolusberg -29.628216, 17.957591
Construction of the 100MW Brypaal solar power PV project on the remainder of portion 4 of 134 of the Farm Brypaal located 53,23km south of Kakamas in the Northern Cape. GPS coordinates lat: -29.112640; long: 20.235312.
Development of a 75MW (megawatts) solar facility, on Remainder of Farm 436 Kapstewel (previously Vaalkop), located off the R325, approximately 21km north of Postmasburg, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm 436 Kapstewel -28.411096, 22.904009
Development of a 75MW solar power facility 30km north-east of Kenhardt on remaining extent of Boven Rugzeer farm 169 in the Northern Cape. The proposed project is located directly alongside the proposed Nieuwehoop Solar Development. The exact co-ordinates are currently not available however the possible area of location is -28.575682, 21.201899
Construction of the Paulputs 300MW Wind Energy Facility and the associated infrastructure approximately 50 km (centre point of the site) northeast of Pofadder and approximately 80 km northwest of Kakamas in the Northern Cape. The scope of works also includes a 132 KV grid connection. The development will consist of a maximum of 85 wind turbines, each with a maximum hub height of 140 m (maximum blade tip height 220 m). The blade length will be a maximum of 80 m and a maximum of 160 m for the rotor diameter. The exact co-ordinates are currently not available however the approximate area of location is 28°58'24.1"S 19°30'31.3"E
Development of a 75MW solar power facility 30km north-east of Kenhardt on on portions 8 of Gemsbok Bult Farm 120 in the Northern Cape. The proposed project is located directly alongside the proposed Nieuwehoop Solar Development.
Construction of the proposed 75MW Enamandla PV 4 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma local municipality under the jurisdiction of the Namakwa district municipality, in the Northern Cape Province. The GPS co-ordinate marker has been placed on Farm
Construction of 75MW a solar photovoltaic (PV) energy generation facility and associated infrastructure on the remaining extent (portion 0) of farm 18, Kalkpoort in the vicinity of Hopetown in the Northern Cape to be known as Kloofsig PV 1. The exact co-ordinates are currently not available however the possible area of location is -29.653489, 24.081851
Construction of the proposed Kotulo Tsatsi Energy up to 100MW PV One Facility as part of the construction of up to 1000MW Concentrated Solar Power (CSP) Energy Facility located on a site near Kenhardt in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed near Kenhardt -29.384567, 21.238999
Construction of a 75 MW photovoltaic (PV) solar facility as well as associated infrastructure on a site located approximately 50 km east of Upington, in the Northern Cape Province. The proposed facility will be located on the remaining extent of the farm Albany 405, 50 km east of Upington in the Northern Cape Province. The exact co-ordinates are currently not available however the marker has been placed on Farm Albany 405 -28.381448, 21.732967
Construction of the proposed 75MW Enamandla PV 5 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma local municipality under the jurisdiction of the Namakwa district municipality, in the Northern Cape Province. The GPS marker has been placed on Farm Hartebees Vlei 86, -29.412034, 18.923940
Construction of the Tirisano 115MW photovoltaic solar energy facility and associated infrastructure on the remaining extent of Portion 2 of the farm Ruby Vale No. 266, approximately 35km south west of Olifantshoek, Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -27.888779, 22.614749
Mulilo Renewable Energy (Pty) Ltd (Mulilo) proposes to construct a 75MW PV solar energy plant on the farm Hoekplaas, near Copperton in the Northern Cape. GPS Coordinates: 29°59'29.95"S 22°21'20.22"E.
Construction of the Ithemba wind farm near Loeriesfontein in the Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is -30.9199262, 19.4497084
Development of 3 x 75MW (megawatts) solar facility, on Remainder of Farm 417 Humansrus, located on the R357, south-west of Prieska, in the Northern Cape. GPS placed on farm 147 Humansrus 28°22'07.9"S 22°53'42.8"E
Construction of the Padrooi Photovoltaic Solar Power Plant on the Farm Padrooi, 22km west of Augrabies in the Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on farm Padrooi -28.630323, 20.311809
Construction of Kronos Solar Farm PV Three, a 75 MW photovoltaic energy plant on portion 6 of farm 103 near Copperton in the Northern Cape. A total of four PV plants will be built in this area. The exact co-ordinates are currently not available however the marker has been placed on Farm 103 -28.255831, 24.633786
Construction of the Witte Wall photovoltaic 1 175MW Solar Photovoltaic Facility on Farm Witte Wall RE 17, Touws River, Western Cape. The GPS marker has been placed on Farm Witte Wall: -32.996755, 20.004511
Construction of a 200 MW concentrated solar power project and associated infrastructure (using Solar Thermal Electric (STE) Molten Salt Tower (MST) technology). The project development site is located on portion 4 of the farm Scuitklip 92 which is located approximately 45 km north-east of Pofadder within the Khai-Ma Local Municipality in the Northern Cape. The project is referred to as the Paulputs CSP Project.
Construction of the proposed 75 MW photovoltaic (PV1) solar power development on the remaining extent of farm Bokpoort 390 which is 20 km north-west of the town of Groblershoop within the !Kheis Local Municipality in the ZF Mgcawu District Municipality, Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on farm Bokpoort -28.750673, 21.053834
Construction of the 75 MW Boschrand 1 Photovoltaic Solar Energy Facility and supporting electrical infrastructure, as part of the Kentani Solar Development in the Free State. The proposed development will be located within 12km from Dealesville, in the Tokologo Local Municipality, which is located in the Lejweleputswa District Municipality, 50km south-east of Boshof and 70km north-east of Bloemfontein. Approximate GPS Coordinates: -28.728439, 25.723100.
Development of a 75MW solar power facility 30km north-east of Kenhardt on portion 3 of Gemsbok Bult 120, in the Northern Cape. Known as the Nieuwehoop Solar Development, consisting of the Gemsbok Solar PV1, Gemsbok Solar PV2 and Boven Solar PV1 solar projects. The exact co-ordinates are currently not available however the marker has been placed on Gemsbok Bult 120 -29.121011, 21.341324
Construction of a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of the farm London No. 275, Kuruman in the Northern Cape. The town of Hotazel is located approximately 10km north west of the proposed development. he exact co-ordinates are currently not available however the marker has been placed on farm London 275 -27.244117, 23.053823
Construction of four 75MW photovoltaic (PV) solar facilities on portion 3 of the farm Zuurwater 62, approximately 9 km south-west of Aggeneys in the Northern Cape. Phase 3. The exact co-ordinates are currently not available however the marker has been placed on farm Zuurwater 62 -29.308047, 18.733368
Construction of the proposed 150 MW CSPtTower development on the remaining extent of farm Bokpoort 390 which is 20 km north-west of the town of Groblershoop within the !Kheis Local Municipality in the ZF Mgcawu District Municipality, Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on farm Bokpoort 390 -28.750654, 21.961587
Construction of a photovoltaic solar facility with a contracted capacity of up to 75MW located on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452 within the Kai !Garib Local Municipality of the greater ZF Mgcawu District Municipality, Northern Cape Province. The development footprint will be approximately 210ha and will include in the scope of works will be the following infrastructure: Solar PV panels; centralised inverter stations or string inverters; cabling between the panels, to be laid underground where practical; an on-site facility substation to facilitate the connection between the solar PV facility to the electricity grid; an access road to the development area with a maximum width of 6m; internal access roads within the PV panel array area with a maximum width of 5m; a temporary laydown area and operation and maintenance buildings including a gatehouse and security building, control centre, offices, warehouses, a workshop, and visitors centre. The broader study area for McTaggarts PV3 borders the Dawid Kruiper Local Municipality to the east. The exact co-ordinates are currently not available however the approximate area of location is -28.7086118, 20.9759699
Establishment of the Okiep 3 PV Solar Energy Facility, a commercial solar energy facility and associated infrastructure on a site on Okiep Mine north of Springbok, Northern Cape. The proposed facility will have a maximum generating capacity of 20MW. The exact co-ordinates are currently not available however the marker has been placed North of Springbok -29.619255, 17.880504
Construction of 75MW a solar photovoltaic (PV) energy generation facility and associated infrastructure on the remaining extent (portion 0) of farm 18, Kalkpoort in the vicinity of Hopetown in the Northern Cape to be known as Kloofsig PV 3. The exact co-ordinates are currently not available however the possible area of location is -29.653489, 24.081851
Construction of the Riverbank Wind Energy Facility Phase 2 on farm Sandflat 149, Riverbank 147, Holstein 148, Porcupine Kop 169, Bristol 170, approximately 4 km northeast of Wesley in the Eastern Cape. The facility is proposed over a collective area of 20 km² in extent. The development is two phases: the first phase comprises of the construction of up to 17 turbines (33MW) and the second phase will similarly include the construction of up to 17 (33MW) turbines, totaling to 34 (66MW) turbines. Just Energy has proposed collaborating with the Uncedo Lwethu Farmers Cooperative. This is also known as the Wesley-Ciskei (33 MW) of which phase 1 forms part of the Window 4 of the Renewable Energy Independent Power Producer Procurement REIPPP programme.
South Africa Mainstream Renewable Power Developments (Pty) Ltd (MRP) proposes to construct a renewable energy facility on Farm Koeris (Farm No. 78 Portion 1), Farm Areb (Farm No. 75 Portion 0 and Remainder) in the Northern Cape. The farm is located approximately 48 km east of Springbok and are accessed via the N14. The exact co-ordinates are currently not available however the marker has been placed on Farm Koeris -29.669010, 18.494747
Establishment of a 75MW photovoltaic solar power generation plant on the farm Adams 328, close to Hotazel in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Adams -27.366273, 23.020729
Construction of a 115MW photovoltaic solar facility and associated infrastructure on portion 2 (Karabee A) of the farm Karabee No. 50, Registration Division, Prieska in the Northern Cape. The town of Prieska is located approximately 15km north west of the proposed development which will be known as Camelthorn solar power plant. The exact co-ordinates are currently not available however the possible area of location is -29.687492, 22.709129
Construction of the Khunab Solar Grid Connection on Portion 3 of the Farm McTaggarts Camp 453; Portion 12 of the Farm Klip Punt 452 and Olyvenhouts Drift Settlement Agricultural Holding 1080 in the Northern Cape. The grid connection solution will include specific grid connection infrastructure to cater for the proposed four (4) individual Khunab and Klip Punt solar PV facilities. The infrastructure to be developed will include the following: Two collector substations; two switching stations and a 132 kV single-circuit power line to connect each solar PV facility to the national grid. The GPS marker has been placed on Farm Mc Taggarts Camp 453, -28.521434, 21.057849
Construction of the Geelstert Grid Connection located on Remaining Extent of the Farm Bloemhoek 61 Remaining Extent of the Farm Aggeneys 56, Portion 1 of the Farm Aggeneys 56, Portion 2 of the Farm Aggeneys 56, Portion 12 of the Farm Aggeneys 56, and Portion 13 of the Farm Aggeneys 56, 11km south-east of Aggeneys within the Khâi-Ma Local Municipality, and the Namakwa District Municipality, Northern Cape. The projects fall within the Springbok Renewable Energy Development Zone (or REDZ 8) as well as the Northern Strategic Transmission Corridor.
Construction of the 175MW Hoek Doornen photovoltaic facility within the Witzenberg Local Municipality, which falls within the Cape Winelands District Municipality, and is situated approximately 90 km from Ceres and 70 km from Touws River, Western Cape. The GPS marker has been placed on farm Hoek Doornen 172: -32.999912, 19.941953
Construction of a 100mw photovoltaic solar power generation plant on the farm Klein Zwart Bast 188 near Kenhardt in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -29.368739, 21.153410
Construction of a 75 MW photovoltaic solar energy facility to be known as AEP Bloemsmond Solar 1 will be developed on two farm portions, portions 5 and 14 on the farm Bloemsmond 455, situated approximately 30 km south west of Upington in the Northern Cape province. It is proposed to build two facilities and the net generating capacity of each proposed PV solar energy facility will be up to 75 MW. The GPS co-ordinate marker has been placed on Farm Bloemsmond 455
Construction of Sirius Four PV facility with the contracted capacity of up to 100MW located within the remaining extent of the farm Tungsten Lodge No. 638, located 20km south west of Upington in the Northern Cape. The proposed development falls within the jurisdiction Kai !Garib and Dawid Kruiper local municipalities in the greater ZF Mgcawu District Municipality. GPS coordinates lat: -28.335140; long: 21.75874
Construction of Kheis Solar Park 1. Gestamp Asetym Solar South Africa (Pty) Ltd is proposing to establish a commercial Photovoltaic Solar Energy Park with a total generating capacity of 225 MW to be developed in 3 separate phases of 75MW each. The phases are referred to as: Kheis Solar Park 1; Kheis Solar Park 2; Kheis Solar Park 3. The sites are located approximately 70km south-east of Upington, in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Namakwari -28.528605, 21.858051
Development of a 30 MW PV Plant on of the Farm Schmidtsdrift 248 Portion 0000. The farm is 33 000 ha in extent, of which 100 ha comprises the proposed development site. The proposed site is located approximately 50 km north-east of Douglas, 50 km south-west of Barkly West and 80 km west of Kimberley, in the Northern Cape. The purpose of the PV plant is to augment renewable energy and feed this into the national grid via the Schmidtsdrift substation. This substation is to be constructed by Eskom in the near future, and will be located less than 1 km from any of the phases of the proposed project. The exact co-ordinates are currently not available however the marker has been placed on farm Schmidtsdrift -28.748844, 23.991784
Construction of a 75MW solar photovoltaic facility on the remainder of portion 62 (a portion of portion 9) of the farm Vaalkoppies in the Northern Cape. Scope of works includes associated infrastructure, on-site substation, auxiliary buildings, access and internal roads, overhead electrical transmission line and perimeter fencing. The exact co-ordinates are currently not available however the marker has been placed on Farm Vaalkoppies 40 -28.536262, 21.356980
Construction of 75MW a solar photovoltaic (PV) energy generation facility and associated infrastructure on the remaining extent (portion 0) of farm 18, Kalkpoort in the vicinity of Hopetown in the Northern Cape to be known as Kloofsig PV 2. he exact co-ordinates are currently not available however the marker has been placed on farm 18 -29.982746, 24.555256
Construction of photovoltaic solar energy facilities, for Ennex Solar (Pty) Ltd, with a generating capacity of 75MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: 30 38'52.47" S; 24 5'33.11" E.
Construction of the proposed Soventix solar PV 3 project on the farm Goedehoop, NR Hanover in the Pixley Ka Seme district, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm Goedehoop -28.730951, 20.912055
Construction of a a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of the farm Kameel Aar 315, Registration Division Kuruman in the Northern Cape. The town of Hotazel is located approximately 8km north west of the proposed development. Estimated GPS coordinates lat: -24.144813; long: 23.12745.
Construction of the Kuruman phase 1 wind energy facility near Kuruman in the Northern Cape and will be on the following farm portions: remainder of the farm Woodstock no. 441; remainder portion 1 of the farm Hartland no. 381; portion 2 of the farm Hartland no. 381; remainder of the farm Rossdale no. 382; remainder portion 2 of the farm Carrington no. 440; portion 4 of the farm Carrington no. 440.
Development of a solar and wind energy generation facility, known as the Clover Valley Renewable Energy Facility, approximately 3.5 km north-west of Mamre, and about 13 km south of Darling, in the Western Cape Province. The proposed facility will comprise of about 26 wind turbines (wind farm), as well as a number of photovoltaic (PV) panels that convert solar radiation energy into electrical energy. The facility will have the combined capacity to generate a maximum electricity output of about 140 megawatts. The turbines and solar panels will be spaced over an area of about 1000 ha on the Farm Klaver Valley No. 727, Farm No. 725, and Farm No. 1180, Malmesbury Registration District (RD). Associated infrastructure will include a small substation, twee spoor access tracks, and an electricity transmission line to the Dassenberg Substation in Atlantis. Value R1.2bn. The exact co-ordinates are currently not available however the possible area of location is -33.52638497021743, 18.431347685390435
Construction of the Styns Vley and Valsch Vley PV Solar Power Generation Plants on the farms Styns Vley Nr 280 division Kenhardt and Valsch Vley within Kai! Garib Local Municipality in the Northern Cape. The proposed development will involve the construction of multiple (up to 10) units of 75MW Solar Photovoltaic (PV) power generation plants; a suitable (up to 400kV) main transmission substation and associated infrastructure. The exact co-ordinates are currently not available however the marker has been placed on farms Styns Vley Nr 280 -29.781834, 20.591940
Construction of the Bushmanland Photovoltaic plant with 100MW generation capacity located on the remaining extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MWh battery energy storage system. The exact co-ordinates are currently not available however the the marker has been placed on Farm Geelkop 456 -28.581584, 21.002489
Construction of a hydropower station and associated infrastructure at Boegoeberg Dam on the Orange River, near Groblershoop in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm 306 -30.868614, 22.107046
Construction of the Kokerboom 3 wind energy facility and associated infrastructure on adjacent farms near Loeriesfontein in the Northern Cape. The WEF would have a maximum generation capacity of up to 240 MW. The proposed Kokerboom 3 WEF is located approximately 50km north of Loeriesfontein, 85km west of Brandvlei and 160km southeast of Springbok in the Northern Cape. The site can be accessed from the unsurfaced Nuwepos road running north-south from Loeriesfontein. he exact co-ordinates are currently not available however the marker has been placed North of Loeriesfontein -30.867321, 19.446325
Construction of the 200MW Kotulo Tsatsi Energy solar photovoltaic 4 facility and associated infrastructure situated on Portion 2 of Farm Kopjes Vley 281 and Portion 2 of Farm Styns Vley 280, 70km south-west of Kenhardt in the Hantam Local Municipality and the Namakwa District Municipality in the Northern Cape. The GPS co-ordinate marker has been placed on Farm Kopjes Vley -29.740550, 20.543604
Construction of the 100 MW Meeding Photovoltaic Solar Energy Facility and supporting electrical infrastructure, as part of the Kentani Solar Development in the Free State. The proposed development will be located within 12km from Dealesville, in the Tokologo Local Municipality, which is located in the Lejweleputswa District Municipality, 50km south-east of Boshof and 70km north-east of Bloemfontein. Approximate GPS Coordinates: -28.750531, 25.674992.
Development of a 75MW solar power facility 30km north-east of Kenhardt on remaining extent of Boven Rugzeer farm 169 in the Northern Cape. The proposed project is located directly alongside the proposed Nieuwehoop Solar Development. The exact co-ordinates are currently not available however the possible area of location is -29.2671381, 21.2901412
Development of the Joram Solar Power Facility on portion 62 (portion of portion 9) of Farm 40 Vaalkoppies, located on the N10, south-east of Upington in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Vaalkoppies 40 -28.536262, 21.356980
Establishment of the Project Blue Solar Energy Facility, a photovoltaic (PV) solar facility, at a site north of the town of Kleinsee within the Nama Khoi Local Municipality, in the Northern Cape, and within a De Beers mining area. This is to be phase 4 of the proposed Project Blue Renewable Energy Facility. The solar facility is proposed to accommodate PV panels appropriately spaced over an extent of approximately 130 hectares for the purpose of electricity generation. The total generating capacity of the proposed facility will be up to 65 MW (to be developed in a phased approach). This solar component will be referred to as the Project Blue Solar Energy Facility. The exact co-ordinates are currently not available however the marker has been placed within the Nama Khoi Local Municipality -29.683377, 17.063812
Development of 3 x 75MW (megawatts) solar facility, on Remainder of Farm 417 Humansrus, located on the R357, south-west of Prieska, in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -29.788767, 22.678695
Construction of the 75 MW Eksteen Photovoltaic Solar Energy Facility and supporting electrical infrastructure, as part of the Kentani Solar Development located within 12km from Dealesville, in the Tokologo Local Municipality, which is located in the Lejweleputswa District Municipality, 50km south-east of Boshof and 70km north-east of Bloemfontein. Approximate GPS Coordinates: -28.697900, 25.722189.
Construction of a wind farm for 150MW across various land parcels located in Great Kei Local Municipality, which lies just inland of the coastal hamlets of Haga Haga, Morgans Bay and Kei Mouth in the Eastern Cape.The total area of the site equates to approximately 9100 hectares.
Construction of a Photovoltaic (PV) or Concentrated Photovoltaic (CPV) Solar Facility with a generating capacity of 100MW. The Douglas solar energy facility will be connected to the Eskom grid via the Ovaal Pumps substation located approximately 1km from the site. The facility will be located on Roode Kop Farm (Portion 1 of Farm 5), 10km southwest of Douglas, in the Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on farm Roode Kop -31.328904, 24.168039
Construction of the Droogfontein 3 battery storage system and associated infrastructure for the Droogfontein 3 PV energy facility situated on Portion 1, Farm no 62 near Kimberly near the Sol Plaatje Local Municipality, Francis Baard District Municipality in the Northern Cape. The battery storage capacity will be up to 200MWh. The GPS co-ordinate marker has been placed on Farm 62 -31.358857, 24.207128
Construction of the proposed Terra Wind Energy Golden Valley Wind Farm Project II, located outside Cookhouse, Eastern Cape. The wind farm is currently authorised to host 126 wind turbines (currently applying to decrease to 49). Each turbine will be connected to an onsite substation from which a 132kV powerline will connect to power to the Poseidon Substation. The total potential output of the wind energy project is 380MW (currently applying to decrease to 343MW). Each turbine will consist of approximately 100m (applying to increase to a maximum of 130m) high tower and nacelle, a rotor of approximately 130m (applying to increase to a maximum of 170m) diameter consisting of 3 blades and each blade approximately 64.5m (applying to increase to a maximum of 85m) long. The towers will be constructed on concrete foundations. The application includes an extension of the validity of the EA for three (3) years. This amendment also includes the removal of eight (8) existing farm portions and the addition of one (1) new farm portion, namely: The removal of farm portions: Farm 161 Portion 0 (Gezhiret); Farm 164 Portion 35 (Oude Smoor Drift); Farm 164 Portion 40 (Oude Smoor Drift); Farm 164 Portion 47 (Oude Smoor Drift); Farm 164 Portion 48 (Oude Smoor Drift); Farm 172 Portion 2 (Wagenaarse Drift); Farm 304 (Smoor Drift); Farm 172/RE; The addition of farm portion: Farm 152 (Patrys Hoogte). The proposed amendments to the application are required to allow for larger, more technologically advanced and efficient turbine models to be used (the increase in output is due to improved turbine technologies - i.e. increase in turbine spec with an associated decrease in the number of turbines which will be erected), to maximise the use of existing EA within REDZ 3 and to increase the validity of the EA in order to participate in the next round of the renewable energy procurement process which has been put in place by the Department of Energy (DoE). -32.74444, 25.80749990000004
Construction of the Umsobombu I Wind Energy Facility, Northern Cape and Eastern Cape. The facility will be developed between Middelburg (Eastern Cape) and Noupoort (Northern Cape) on the provincial border. The WEF will host a maximum of 80 wind turbines, each generating between 1.5 – 4 megawatts (MW) of electricity, with total combined potential power output of approximately 140MW.
Establishment of the Naauw Poort Solar Energy Facility, a commercial photovoltaic solar energy facility (75 MW) on a site approximately 10km south of Noupoort, in the Northern Cape. The exact co-ordinates are currently not available however the possible area of location is -31.197956, 24.946889
Construction of the proposed Nama Sun solar facility in Aggeneys in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed within Aggeneys -29.203392, 18.936992
Construction of a photovoltaic solar facility and associated infrastructure on the Remaining Extent of the Farm Grootdraai 468, Registration Division Viljoenskroon, Free State Province situated within the Moqhaka Local Municipality and the greater Feliz Dabi District Municipality. The solar facility will have a generating capacity of up to 150MW. The estimated GPS coordinates of the project site is lat: -27.02783; long: 26.44562
Construction of a wind energy facility and associated infrastructure, Kokerboom 2 wind farm in the Northern Cape. Kokerboom 2 wind farm is located on farm portions Springbok Pan (RE/1163) and Springbok Tand (RE/215) and is located approximately 50km north of Loeriesfontein, 85km west of Brandvlei and 160km southeast of Springbok. The exact co-ordinates are currently not available however the marker has been placed on farm portions Springbok Pan -29.931439, 21.898944
Construction of a 13 turbine wind farm with a maximum generation capacity of 30.6MW with reinforced concrete foundation, gravel access road and fencing located on the Broadlands farm near Humansdorp in the Kouga Local Municipality of the Cacadu District Municipality, Eastern Cape. The exact co-ordinates are currently not available however the approximate area of location is within the Humansdorp Kouga Local Municipality, Latitude -34.027873238702185 Longitude 24.771199997681393.
AES is planning a new photovoltaic (PV) solar power project for the generation of solar energy in the Northern Cape, to be constructed in multiple phases over time. The site is located on the remaining portion of portion 14 (a portion of portion 4) of Olyven Kolk Farm, No. 187 which is situated in the Siyanda District (see Figure 4.2). The proposed development includes the installation and operation of solar panels (photovoltaic (PV) arrays) with a projected output of up to 200 megawatts (MW) to be constructed in phases over time. It is intended that the electricity generated by the proposed facility will feed into the national electrical grid network. The proposed solar power plant will consist of the following: • PV solar panels/modules (arranged in arrays); • PV module mountings; • DC-AC current inverters; and • Underground cabling. In addition associated infrastructure will be required such as a temporary construction camp, offices and control building, meteorological building and access roads. he exact co-ordinates are currently not available however the marker has been placed on farm Olyven Kolk -30.218995, 18.005170
Establishment of the Vlakpan Solar Park, a renewable energy generation facility. The project will consist of construction, operation and maintenance of a Photovoltaic (PV) Power Plant with associated infrastructure and structures having a generating capacity up to 75MW. The project site is on Portion 2 of the Farm Vlakpan No. 59 Hopetown RD, in the Douglas area, in the Northern Cape. Access to the site will be from the R357 regional road, which runs on the south eastern boundary of the property. he exact co-ordinates are currently not available however the marker has been placed on farm Vlak pan -29.422209, 23.258096
Construction of a 75 MW solar farm on rem portion 10 farm Korridor Wes 2, portion 9 Farm Korridor Wes 2 and remainder farm Groot Derm no 10 in the Northern Cape. The GPS co-ordinates for portion 10 is 28°30'22.4"S 16°47'28.4"E
Construction of three 75MW solar PV power generation facilities and associated electrical infrastructure on the remaining extent of Onder Rugzeer Farm 168 north east of Kenhardt in the Northern Cape province. Kenhard PV One Solar Facility. The exact co-ordinates are currently not available however the marker has been placed on Onder Rugzeer Farm 168 -29.273982, 21.282465
Construction of a 75 MW photovoltaic solar energy facility to be known as AEP Bloemsmond Solar 2 which will be developed on two farm portions, portions 5 and 14 on the farm Bloemsmond 455, situated approximately 30 km south west of Upington in the Northern Cape province. It is proposed to build two facilities and the net generating capacity of each proposed PV solar energy facility will be up to 75 MW. The exact co-ordinates are currently not available however the marker has been placed on farm Bloemsmond 455 -28.555572, 21.023781
Construction of the Maralla West wind energy facility approximately 34 km south of Sutherland in the Northern Cape and will comprise of a single site located on the remainder of farm Drie Roode Heuwels 180, the remainder of farm annex Drie Roode Heuwels 181, portion 1 and 2 of farm Wolven Hoek 182. The exact co-ordinates are currently not available however the marker has been placed on farm annex Drie Roode Heuwels 181 -32.725139, 20.744907
Construction of 100MW solar photovoltaic energy facility Paulputs PV1 in the Khai-Ma Local Municipality, Northern Cape.
Construction of a 100MW photovoltaic solar energy facility to be known as Bloemsmond Solar 5 which will be developed on two farm portions, portions 5 and 14 on the farm Bloemsmond 455, Upington in the Northern Cape province. It is proposed to build three facilities and the net generating capacity of each proposed PV solar energy facility will be up to 100MW. The exact co-ordinates are currently not available however the marker has been placed on farm Bloemsmond 455 -28.555525, 21.023792
Development of a 75MW solar power facility 30km north-east of Kenhardt on portion 3 of Gemsbok Bult 120, in the Northern Cape. Known as the Nieuwehoop Solar Development, consisting of the Gemsbok Solar PV1, Gemsbok Solar PV2 and Boven Solar PV1 solar projects. The exact co-ordinates are currently not available however the possible area of location is -29.319430, 21.295343
Construction of up to 1000MW Concentrated Solar Power (CSP) Energy Facility (comprising 3 tower plants with a generation capacity of up to 200MW each, and 2 trough plants with a generation capacity of up to 200MW each) and two Photovoltaic (PV) Solar Energy Facilities each with a generation capacity of up to 100MW, located on a site near Kenhardt in the Northern Cape. The facilities which are proposed to make up the Solar Park are as follows: Proposed Kotulo Tsatsi Energy up to 1000MW Concentrated Solar Power Facility (including both tower and trough technology). * Tower technology: 3 facilities with a generating capacity of up to 200MW each. * Trough technology: 2 facilities with a generating capacity of up to 200MW each. The exact co-ordinates are currently not available however the marker has been placed near Kenhardt -29.355503, 21.213059
Construction of a 10MW AC solar photovoltaic plant and associated infrastructure adjacent to the PPC Dwaalboom factory, located on portion of Schoongezicht 238 KP, Dwaalboom, Limpopo. The plant will be used to generate power for private consumption at the adjacent cement factory and neighboring mine. An 11kv dual-circuit over head line (OHL), approximately 1 900m in length, will be required to connect the plant to the existing PPC 11kv substation. GPS co-ordinates 24°48'27.22"S 26°50'31.45"E
Construction of a photovoltiac (PV) solar energy facility and associated infrastructure on portion 1 of the farm Bosjesmansberg 67, approximately 15km east of Copperton in the Northern Cape. The proposed solar facility will have a total generating capacity of 300MW and will be developed in 4 phases of 75MW each. Bosjesmansberg South PV Plant. The exact co-ordinates are currently not available however the marker has been placed on farm Bosjesmansberg -29.896109, 22.489318
Construction of the proposed 75MW photovoltaic (PV) solar energy facility on the farm Naroep (remainder of 45) or alternatively Haramoep (remainder of farm 53) in the Namakwa district municipality approximately 20km north-west of Aggeneys in the Northern Cape. The GPS marker has been placed on Naroep Farm, -29.038231, 18.560105
Construction of the 175MW Hoek Doornen photovoltaic 2 facility within the Witzenberg Local Municipality, which falls within the Cape Winelands District Municipality, and is situated approximately 90km from Ceres and 70km from Touws River, Western Cape. The GPS marker has been placed on farm Hoek Doornen 172: -32.999912, 19.941953
Construction and development of the 98.6 MW Canyon Springs wind and solar energy facility, in the Peddie area near Wesley, Portion 18, 19, 20 and 21 of Farm 258, Eastern Cape
Construction of the Xha! Boom wind farm near Loeriesfontein in the Northern Cape.
Construction of three 75MW solar PV power generation facilities and associated electrical infrastructure on the remaining extent of Onder Rugzeer Farm 168 north east of Kenhardt in the Northern Cape province. Kenhard PV Three Solar Facility. The exact co-ordinates are currently not available however the marker has been placed on Onder Rugzeer Farm 168 -29.273964, 21.282465
Construction of two commercial solar thermal electricity generating facilities on a site which lies 20km west of Upington in the Northern Cape. The proposed Upington Thermal Plant Three will utilise parabolic trough technology with a generation capacity of 100MW. Each facility would include the following infrastructure: access roads, power island, substation, power line, water abstraction point and supply pipe line, water storage tanks, packaged water treatment plant, lined evaporation ponds, salt storage tanks, auxiliary fossil fuel boilers and workshop and office buildings. Each project will be located on different areas on portion 3 of the Farm McTaggarts Camp 453, which falls within the Kai! Garib Local Municipality. The exact co-ordinates are currently not available however the marker has been placed on farm Farm McTaggarts Camp 453 -28.521424, 21.059913
Construction of Hyperion solar development 3, a photovoltaic (PV) solar energy facility (SEF) with a contracted capacity of up to 75MW, located on the remaining extent of the farm Lyndoch 432 situated 16km north of Kathu in the Northern Cape Province. The proposed projects fall within the jurisdiction of the Gamagara Local Municipality and within the greater John Taolo Gaetsewe District Municipality. The exact co-ordinates are currently not available however the approximate area of location is -27.6451412, 23.0488541
Construction of the proposed Soventix solar PV 1 project on the farm Goedehoop, NR Hanover in the Pixley Ka Seme district, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Goedehoop -28.733174, 20.907244
Establishment of the Inkululeko Solar Energy Facility, a photovoltaic (PV) solar energy facility, which will be located on portion 2 of Farm 167 Carolus Poort, approximately 3km north of Noupoort, in the Northern Cape. The facility will include arrays of photovoltaic panels, cabling between the project components, an overhead power line, internal access roads and a workshop area for maintenance and storage. he exact co-ordinates are currently not available however the marker has been placed on farm Carolus Poort -31.091118, 24.857872
Construction of the Rhodes 2 Solar Park which entails the establishment of a photovoltaic (PV) power plant having a maximum generation capacity of 120MW at farm Rhodes 269, Kuruman RD in the Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on farm Rhodes -27.131451, 22.949211
Construction of two substations, two 132kV overhead power lines and to extend the existing substation in order to connect the Ukomeleza wind farm to the grid located on the remainder of farm 190, portion 1 of the farm 190, the remainder of farm 227, farm 228, Grassridge situated north of Zone 14 of the Coega Industrial Development Zone (IDZ), Nelson Mandela Bay Municipality, Port Elizabeth, Eastern Cape. The exact co-ordinates are currently not available however the approximate area of location is Grassridge Wind Farm. Latitude -33.7193772 Longitude 25.5161758.
Construction of the 200MW Kotulo Tsatsi Energy solar photovoltaic 3 facility and associated infrastructure situated on Portion 2 of Farm Styns Vley 280, 70km south-west of Kenhardt in the Hantam Local Municipality and the Namakwa District Municipality in the Northern Cape. The GPS co-ordinate marker has been placed on -29.768865, 20.574236
Construction of the Visserspan Solar Photoviltaic Facility Project 4 covering an area of around 238ha, circumscribed with a perimeter fire access road and fence on Farm Visserpan No. 40, approximately 10km northwest of Dealesville and 68km northwest of Bloemfontein, Free State. The PV tables will be raised approximately 500mm above ground level and will have a single-axis tracking system allowing the generation of not more than 100MW of alternating current. Proposed associated infrastructure includes a fenced construction staging area, maintenance shed, inverter transformer, stations on concrete pads and office buildings all within the 238ha proposed development site footprint, as well as switch panel and an overhead powerline from the PV array for connection to the power grid. Co-ordinates: 28°35'58.80"S; 25°45'6.65"E
Construction of a 132kV Karusa facility substation complex and ancillaries in the Northern Cape.
Construction of a 25 - 30 MW photovoltaic solar power plant for Red Sky Solar (Pty) Ltd, located on Farm David’s Kraal No. 116, in the Northern Cape Province. The land is situated approximately 30 km northeast of Victoria West, and lies just to the northwest of the railway line and road between Hutchinson and De Aar. The area is approximately 50 - 65 hectares. The exact co-ordinates are currently not available however the marker has been placed on Farm David’s Kraal No. 116 -31.282623, 23.390872
Establishment of the Hidden Valley Wind Energy Facility and associated infrastructure, south of Sutherland, in the Northern Cape. The facility will be established in three phases, which will include 170 wind turbines, up to three on-site 132 kV substations and one on-site 400kV substation, a 400 kV power line linking to a new 400 kV substation to link up to the existing Eskom transmission infrastructure, underground cables linking the turbines to the substation, workshop area and internal access roads to each turbine. Phase 3: Great Karoo Wind Farm is proposed on the following farm portions (which collectively occupies land of 91.8 km2 in extent): Farm Kentucky 206, Portion 1 of Farm Wolvenkop 207. The primary components of the Great Karoo Wind Farm include up to 57 wind turbines, appropriately spaced to make use of the wind resource on the site. The exact co-ordinates are currently not available however the marker has been placed on farm Kentucky -32.801976, 20.757988
Construction of a 75MW solar PV energy facility near Kathu in the Northern Cape on portion 1 of the farm 460 Legoko. The exact co-ordinates are currently not available however the marker has been placed on farm 460 Legoko -27.780005, 23.100746
Construction of 100 MW solar photovoltaic energy facility Paulputs PV2 in the Khai-Ma Local Municipality, Northern Cape. The exact co-ordinates are currently not available however the marker has been placed within Khai-Ma Local Municipality -29.261603, 19.545301
Construction of the proposed 150MW Letsoai CSP 2 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma local municipality under the jurisdiction of the Namakwa district municipality, in the Northern Cape Province. The GPS co-ordinate marker has been placed on Farm
Construction of the New Hope 1 Solar Park with associated infrastructure and structures on the remaining extent of the farm N'Rougas Zuid, 121, located within the Kai !Garbi Local Municipality, ZF Mgcawu District Municipality, Northern Cape. The power plant will have a maximum generation capacity of up to 300 MW. The exact co-ordinates are currently not available however the central co-ordinates of the development footprint is 29°09'10.1"S 21°09'57.4"E
Construction of Aggeneys 1 solar photovoltaic facility with a capacity of up to 100MW on the Farm Blomhoek 61, Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is -29.22079149999999, 18.9264524
Construction of a 75MW solar energy facility on portion 4 of Farm 300, Barkley West near Lime Acres in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Farm 300 -28.313435, 23.639890
Construction of a hybrid generation facility consisting of a dispatchable, dual fuel (liquid or gas) thermal generation plant that will work in combination with the authorised Hyperion PV Solar Energy Facility (SEF) complex located on the Remainder of the Farm Lyndoch 432 and Portion 1 of Farm 464, 22km north of Kathu within in the Gamagara Local Municipality which falls within the jurisdiction of the John Taolo Gaetsewe District Municipality, Northern Cape. The exact co-ordinates are currently not available however the the marker has been placed on Farm Lyndoch 432 -27.528479, 23.085260
Construction of a 200MW solar PV park on the farm Hotazel annex Langdon (F278/0), and associated infrastructure, near Hotazel, in the Joe Morolong Local Municipality, in the Northern Cape. The exact co-ordinates are currently not available however the the marker has been placed on Farm Hotazel -27.208569, 22.941472
Construction of a 75MW PV solar power development on Farm 147 Humansrus as well as associated infrastructure in the Northern Cape. GPS placed on farm 147 Humansrus 28°22'07.9"S 22°53'42.8"E
construction of the new Tsonga photovoltaic plant with a capacity of 200MW located on the north eastern Portion of the remaining extent of the Farm Bokpoort 390, Groblershoop within the !kheis Local municipality Northern Cape. The exact co-ordinates are currently not available however the has been placed on the Farm Bokpoort 390 -28.788649, 21.936171
Construction of the 75MW AMDA Bravo solar PV facility on portion 1 of N'Rougas Zuid no 121, Straussheim in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on Portion 1 of N'Rougas Zuid No 121 -29.123680, 21.278914
Construction of the Redstone solar photovoltaic power plant on the remaining extent of the farm no. 469, hay registration division in the Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is lat: -28.29793926578056, long: 23.360052082965105
Construction of the proposed Tooverberg Wind Energy Facility comprising of up to 44 wind turbines and associated infrastructure with a total generation capacity of up to 264MW, located approximately 25km north of Touwsriver in the Witzenberg Local Municipality within the Western Cape Province.
Construction of a proposed PV2 photovoltaic solar energy facility on Du Plessis dam farm near De Aar in the Northern Cape. he exact co-ordinates are currently not available however the marker has been placed on Du Plessis dam -28.300488, 25.466718
Construction of the Gordonia solar photovoltaic plant with 100MW generation capacity located on the remaining extent of the Farm Geelkop 456, near Upington in the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MW battery energy storage system. The exact co-ordinates are currently not available however the marker has been placed on Farm Geelkop 456 -28.581775, 21.005814
Construction of 100 MW solar photovoltaic energy facility Paulputs PV3 in the Khai-Ma Local Municipality, Northern Cape.
Construction of photovoltaic solar energy facilities, for Inqwaba Energy (Pty) Ltd, with a generating capacity of 75MW on the remaining extent of the Farm Vetlaagte 4 in De Aar, in the Northern Cape. GPS Coordinates: -30.674432, 24.102063
Development of a 75MW solar power facility 30km north-east of Kenhardt on remaining extent of Boven Rugzeer farm 169 in the Northern Cape. The proposed project is located directly alongside the proposed Nieuwehoop Solar Development. The exact co-ordinates are currently not available however the marker has been placed on Boven Rugzeer Farm 169 -29.197275, 21.343767
Development of the 1GW Upington Solar Park, near Upington in the Northern Cape. The development will consist of the following infrastructure development but not limited to: Construction of the Solar Park bulk infrastructure (e.g power blocks and turbines; collector substations and interconnection substations, power lines, auxiliary fossil fuel boilers, salt or direct stream storage vessels) solar panels of different solar technologies; workshop area for maintenance and storage of equipment; building infrastructure; construction of pipelines for water supply; stormwater, drainage and sewage; telecommunications; subsoil stockpile area; topsoil stockpile area – where possible foundations need to be constructed; water treatment works, water storage and evaporation ponds; access / haul road network. It is envisaged that the proposed Solar Park will make use of different Solar Technologies such as Concentrated Solar Power (CSP) which include; Parabolic Trough (PT) and Central Receiver (CR) and Photovoltaic (PV) which include; fixed and tracking crystal line PV, fixed thin film PV and Concentrated PV (CPV) with a total generating capacity of 1GW. The proposed Solar Park development is on the remaining extent of Farm Klipkraal 451 which covers an area of approximately 5011 hectares. The exact co-ordinates are currently not available however the possible area of location is -28.4415233, 21.1434246
Construction of a wind generation plant, Phase 2, for the Prieska Power Reserve Hub about 10 km southeast of Prieska in the Northern Cape. The GPS co-ordinates are Latitude -29.704092 Longitude 22.759953.
Moyeng Energy (Pty) Ltd is proposing to establish a commercial wind energy facility and associated infrastructure on a site located near Suurplaat in the Western and Northern Cape Provinces. An area which falls within the Laingsburg Local Municipality (Western Cape); and the Karoo Hoogland Local Municipality (Northern Cape) has been identified for consideration. It is proposed for a cluster of up to 400 wind turbines (collectively described as a wind energy facility) to be constructed over an area of approximately 286 square kilometers in extent. The Suurplaat Wind Facility will include up to 400 wind turbines, a substation, 400kv powerline, an access road and a maintenance building.
Construction of the Wonderheuvel Solar PV Plant, and 132kV overhead power lines with associated grid connection, in the Umsobomvu Local Municipality, Pixley ka Seme District Municipality, Northern Cape. The generation capacity of the solar PV facility and the layout of the PV arrays will be dependent on the outcome of the specialist studies conducted within the EIA. GPS coordinates: S31° 19' 20.917"; E24° 42' 27.573.
Construction of the Kuruman phase 2 wind energy facility near Kuruman in the Northern Cape and will be developed on the following land portions: portion 1 of farm Bramcote 446; and remainder of farm Bramcote 446.
Construction of a 75 MW PV3 photovoltaic solar energy facility on Badenhorst Dam farm near De Aar in the Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is -30.6753117, 24.0017582
Construction of Aggeneys 2 solar photovoltaic facility with a capacity of up to 100MW on the Farm Blomhoek 61, Northern Cape. The exact co-ordinates are currently not available however the approximate area of location is -29.22079149999999, 18.9264524
Construction of the proposed 75MW Enamandla PV 1 and associated infrastructure on farm Hartebeest Vlei 86, located approximately 13km southeast of Aggeneys located within the Khâi-Ma Local Municipality under the jurisdiction of the Namakwa District Municipality, in the Northern Cape province. The GPS marker has been placed on Farm Hartebees Vlei 86, -29.412034, 18.923940
- This tender has been viewed 55 times
Details
You are currently logged out. Please Log in or Subscribe for ALL the information relating to this Tender.
Site Inspection Details
We have site inspection details pertaining to this Tender, please Log in or Subscribe Now for more information!
Closing Date Set a Reminder
We have closing date details for this Tender, please Log in or Subscribe Now for more information!
Document Collection
Deposit Details: R25 000.00 Non-refundable.
Restrictions
We have restriction information on this Tender, please Log in or Subscribe Now for more information!
Category
Infrastructure, Alternate EnergyIndustry
Power Grid, InstitutionalRegion
Limpopo, Eastern Cape, Mpumalanga, Western Cape, KwaZulu-Natal, North West, Free State, Northern Cape, GautengProfessionals
Client
Tender Award
Your Notes
Add a New Note
Quick Search Tags
- Limpopo, Eastern Cape, Mpumalanga, Western Cape, KwaZulu-Natal, North West, Free State, Northern Cape, Gauteng
- Power Grid, Institutional
- Infrastructure, Alternate Energy
Your Tender Tags
Recent Tenders
Related Leads
The Government of the Republic of Uganda has receied financing from a German Bank Consortium (AKA Ausfuhrkredit - Gesellschaft mbH and CommerZbank AG) towards the cost of Development of New Kampala Port at Bukasa and intends to apply the agreed amounts for payments under the contract for Supply of Survey Equipment: Bathymetric Topographic
Invitation to competitive bidding tenders: Supply and Delivery of WAN Mateiral
Invitation to competitive bidding tenders: Supply and Delivery of LAN Mateiral