Search Results Found 1578 results

Advertising

Projects

Western Aqueduct
791
  • 6210
Construction of the Western Aqueduct project. Phase 1 runs from Umlaas Road to Inchanga Station, and Phase 2 runs from Inchanga to Alverstone Nek Reservoir, Alverstone Nek Reservoir to Ashely Drive, Ashley drive, past Hilltop Road to Ntuzuma 5 resevoir, Inchanga Station to Ntuzuma, Makaranga Lodge in

Projects

Rietfontein-Manor Extension 20 - Infrastructure
468
  • 9678
Construction of services and infrastructure for the establishment of a private retirement centre with approximately 280 residential units on approximately 8 hectares. A retirement centre generally consists of dwelling units and a service centre with recreational facilities, a sick bay, medical consulting

Projects

Mapleton Pumping Station Engine Room 3
720
  • 18665
Construction of the engine room 3 building, pipelines and associated structures at the Mapleton Pumping Station, Boksburg, Gauteng. CIDB grading required is 9CE/8CE PE

Projects

F49 Pipeline
400
  • 19205
Construction of a steel F49 Pipeline from Krugersdorp to Randfontein in Gauteng. Scope of works includes earthworks, pipe laying and associated works. CIDB grading required is 8CE/7CE PE.

Projects

S4 Pipeline
1314
  • 17755
Construction of the S4 pipeline from Van Dyk Park to Rynfield, Benoni, Gauteng. The scope of works includes earthworks, pipe laying, pipe jacking and associated works. CIDB grading required is 8CE/7CE PE.

Projects

Station 5 Pipeline
167
  • 21544
Construction of the Station 5 pipeline in Gauteng. CIDB grading required is 8CE/7CE PE.

Projects

Steel Pipeline H39 Phase II
338
  • 19203
Construction of steel pipeline H39 phase 11 from Dale Road to Modderfontein Road at Midrand, Gauteng. Scope of works includes earth works, pipe laying and associated works. CIDB grading required is 8CE/7CE PE.

Projects

C25 Pipeline Steel Pipe
286
  • 19707
Construction and installation of a steel pipe for the C25 pipeline from Zwartkopjes to Meyershill, Eikenhof, Johannesburg South, Gauteng. The scope of works includes earthworks, pipe laying and associated works which is divided into two portions being Portion A (3200 m) & Portion B (3000 m). CIDB Grading

Projects

N7/ N8 & M11 Steel Pipelines
398
  • 19580
Construction of the N7/N8 and M11 Steel Pipelines including earthworks, pipe laying and associated works from Brakpan reservoir to Selcourt reservoir in Gauteng. Minimum CIDB contractor grading is 7 CE/6 CE PE and 8 CE/ 7 CE PE.

Projects

Hobsland to Indaka Bulk Water Feeder, Phase 2
1307
  • 15951
Construction of the Hobsland to Indaka Bulk Water Feeder Main phase 2, which will realize the supply of bulk potable water to the community of Jononoskop / Matiwaneskop and surrounds, in the uThukela District Municipality, Kwazulu-Natal. This project is the continuation of phase 1 which formed the linkage

Advertising

Send me a Sample Based on these search results