Construction of of the spill dam and associated infrastructure at TPL Waltloo Depot, Pretoria, Gauteng. CIDB: 7CE or higher. Estimated GPS coordinates -25.72615626793332, 28.314171545055906.
Replacement of the Mogwase asbestos pipes phase 2 in Mogwase, North West. CIDB 6CEPE/ 7CE. The exact GPS coordinates are not known and have been placed at the Moses Kotane Local Municipality office 25°16'17.0"S 27°14'05.8"E
Construction of a 3ML reservoir and associated works at Henkries water treatment works (WTW) located in Goodhouse, Northern Cape. CIDB 7CE PE/8CE. Scope of works could include but not limited to: pipework connections, sterlization, testing and commissioning, construction of the 3 Mega litre (3ML) reservoir
Construction of the internal street and stormwater control in Phagameng Ext 8 in the Modimolle-Mookgophong Local Municipality, Limpopo. CIDB 7CE. The exact location is not known and the marker has been placed at the Mookgopong Municipality Office 24°30'55.8"S 28°42'44.0"E
Construction of a 6Ml reinforced concrete reservoir in Trenance Park, Verulam, KwaZulu-Natal. CIDB 7CE. The scope of work could include construction of a 6Ml reinforced concrete reservoir, pump station, inlet and outlet pipework, 400K elevated tank and ancillary works. The GPS marker has been placed
Construction of the Enzondwane Domestic Reticulation in eNzondwane, Mandlakazi, Zululand District Municipality, KwaZulu-Natal. Value of R46 276 313.20. The scope consists of construction of 70km reticulation network with pipe diameters between 20mm to 90mm (HDPE), 110mm to 200mm (oPVC), and 600 yard
Design and construction of the 10 ML/d Havercroft water treatment works and 21 ML/d Spitzkop water treatment works in Havercroft and Spitzkop in Limpopo. CIDB 9CE. The GPS coordinates are not known and the marker has been placed at Spitskop Chrome Mine in Spitzkop 24°47'53.9"S 30°09'25.0"E
Upgrading of Sir Lowry’s Pass river from the N2 to False Bay, Gordon's Bay in the Western Cape. R 336 254 855.00. The GPS co-ordinates are 34°07'28.3"S 18°53'22.8"E.
Upgrade of the Nhlolhlela Water Supply in the Ceza Area, KwaZulu-Natal. Value of R36 889 161.72. The scope of work could include the construction of approximately 3700m of 200-250mm diameter uPVC and 250mm diameter steel pipe, 20-110mm of 9 900m of HDPE pipelines; 160 house connections and standpipes
Supply of material and the construction of storm water and environmental systems at Saldanha Bulk Terminal, Saldanha Bay, Western Cape. CIDB 8CE. The scope of work for the project includes the construction of all new stormwater infrastructure and upgrading of the existing network; the delivery to site,