Rehabilitation of an 560mm potable water pipeline, valves, fittings and manholes in the Phalaborwa water supply scheme located in Mopani District, Limpopo. CIDB 7CE/ME. The project entails civil, structural and mechanical works relating to the rehabilitation of an existing pipeline within the existing
Construction of Mutale raw and portable water system upgrade, Contract C3 for the pumping main upgrade, Vhembe District Municipality, Limpopo. CIDB 8CE. The exact GPS location is not known and the Marker has been placed at Vhembe District Municipality offices: 22°58'06.8"S 30°27'27.1"E.
Construction of Klipgat sanitation Phase 9B for Sofasonke, Ward 24 in Klipgat Mabopane, North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at Sofasonke, Klipgat 25°28'08.2"S 27°58'24.3"E
Construction of the 50 Ml/D Highbury water treatment works - Stage 2 civils located between Mthatha Dam and Highbury Village in Mthatha, Eastern Cape. The value is R 168 731 790,03. The exact co-ordinates are currently not available however the approximate area of location is Highbury, 31°32'46.7"S 28°45'41.3"
Construction works for the water upgrades earmarked for the Foresthill tower and pumpstation located on Erf 68, Turffontein, 418 Rifle Range Road, Turffontein, Johannesburg, Gauteng. CIDB 8CE. Scope of works is to enhance the storage capacity of the existing water works at Foresthill in Johannesburg
Construction of Ward 30 Contract 2 of the Mbizana Ward 29 & 30 water supply scheme near Mbizana, Alfred Nzo District Municipality, Eastern Cape. CIDB 6CEPE/7CE. The scope of work includes site establishment; clearing and grubbing; excavation of trenches to a maximum depth of approximately 2m for the
Construction of Kwahlokohloko SSA 1 Bulk Water Supply: Phase 2A from Thintumkhaba to Emaqeleni, KwaZulu-Natal. Value of R56 739 793.00. Scope of works includes 2km of ND500 and 4.4km of ND400 bulk pipelines and 1.55Ml concrete reservoir. GPS coordinates: -28.844239285747236, 31.442791758922912
Construction of Motantanyane and Ledwaba water supply Phase 1, contract E in Motantanyane and Ledwaba, Limpopo. Value of the project: R50 202 606,00. Scope of works includes: Construction 5Ml concrete reservoir with 2 inlets (with 2 bulk water meters), 400mm diameter and 450mm diameter and the discharge,
Construction of the Marapong Bulk Water Supply Pipeline in Marapong, Lephalale Local Municipality, Limpopo. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed the at Lephalale Local Municipality offices 23°41'10.9"S 27°41'47.9"E
Construction of the Dumasi Regional Water Supply Phase 1, Contract 7, for the construction of bulk pipelines from Sigubudu to Ntengu Village, reservoir and reticulation network situated in the Nyandeni Local Municipality, Eastern Cape. Project value of R34 120 521.64. The exact GPS co-ordinates are