Construction of 70km of 1 200mm diameter steel pipeline from the Flag Boshielo dam to a terminal reservoir at Pruissen (near Mokopane) in Limpopo Province. CIDB 9CE. Along the route, three pump stations will be required: the first at the Flag Boshielo dam, the second in the vicinity of Immerpan (on the
Upgrading of the Nelsonskop sewage plant at Matimba Power Station, Lephalale, Limpopo. CIDB 7CE. The works is inclusive of all activities necessary for the provision of a fully functional sewage treatment plant that meets Eskom and Department of Water and Sanitation requirements. The Contractor designs,
Replacement of asbestos cement pipes to HDPE/UPVC water pipes in Onverwacht, Section B, Lephalale Municipality, Limpopo. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed at the Lephalale Municipality 23°41'10.6"S 27°41'47.8"E
Upgrading of the pavement outfall sewer pipeline in Khuma, North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at City of Matlosana Local Municipality, 26°51'59.5"S 26°39'56.2"E
Construction and refurbishment of Phase 2 for the Mogalakwena waste water treatment works and Rebone maturation ponds within the Mogalakwena Local Municipality in Mokopane, Limpopo. CIDB 8CE. The exact GPS coordinates are not known and the GPS marker has been placed at Rebone-A Village 23°25'47.2"S 28°37'18.4"
Upgrading of the McGregor water treatment works, located on Voortrekker Street, McGregor, Western Cape. The project value is R 49 088 971,92. Scope of works: Civil and structural works: Construction of a 20m long, 11m wide building to house the new water treatment works including 6m high portal frames,
Design and construction of the 10 ML/d Havercroft water treatment works and 21 ML/d Spitzkop water treatment works in Havercroft and Spitzkop in Limpopo. CIDB 9CE. The GPS coordinates are not known and the marker has been placed at Spitskop Chrome Mine in Spitzkop 24°47'53.9"S 30°09'25.0"E
Phase 1 for the replacement of 12.7km of asbestos cement pipes to uPVC pipelines in Frankfort and Namahadi, Free State. CIDB Grade 6CE PE or higher. The contract will consist of the following: The replacement of two asbestos cement main supply pipelines with HDPE/uPVC- 160-250mm diameter and the replacement
Construction of the Wendywood water pipe replacement in Wendywood, Region E of the City of Johannesburg, Gauteng. CIDB 8CE. Scope of works could include: Site clearance of the pipeline route. Pipe supply and laying. Construction of pre cast concrete manholes. Erf re-connections. Excavation of launch
Upgrading of the Klapmuts wastewater treatment works, phase 1, located in Klapmuts, Western Cape. The project value is R 32 131 179,33. The GPS co-ordinates are 33°48'12.9"S 18°51'28.9"E