Upgrade of the Gumbi Water Supply Scheme in the Gumbi Area, Pongola, KwaZulu-Natal. CIDB 8CE. The scope of work could include the construction of a 750m of 200mm diameter HDPE pipeline with 6500m of 200mm diameter PVC-O rising pipeline; with associated valves, chambers and fittings, new floating raw
Upgrading of the water reticulation in the Port of Richards Bay in Richards Bay, KwaZulu-Natal. CIDB 7CE. The scope of work could include: replacement of a 1.5km section of existing 450mm diameter ac pipe with 560mm diameter high density polyethylene between the level crossing and tidal bridge, replacement
Upgrade of phase 2 of the Hluhluwe water treatment works in Hluhluwe, Umkhanyakude District Municipality, KwaZulu-Natal. CIDB 8CE. The scope of works could include the upgrading of the existing rising main pipelines of WTW to command reservoir, construction of bulk supply pipeline. The GPS marker has
Construction of a 300Ml reservoir, bulk pipelines and associated infrastructure on Portion 5 of Farm Weltevreden No 719 and Portion 12 of Farm Herculus Pilaar No 475 near Muldersvlei, Western Cape. CIDB 9CE. The Muldersvlei reservoir and future water treatment works (phase 3) site is located north of
Construction of Oukasie outfall sewer, internal reticulation and pump station in Oukasie, Brits, Bojanala Platinum District Municipality, North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at the Oukasie Community Hall, Oukasie, Brits, -25.6086096, 27.7912323.
Construction of Hebron Kgabalatsane water reticulation Phase 9C in Kgabalasane in the North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at Kgabalatsane Primary School 25°32'08.9"S 27°57'13.6"E
Construction of Klipgat water reticulation network, Phase 9C in Madibeng Hills Ward 8 in Makanyaneng, Klipgat, North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at Ward 8 Madibeng Offices, Jakkalas, Klipgat, 25°28'10.1"S 28°01'51.2"E
Civil repairs of the water treatment plant at Duvha Power Station, located on the old Bethal Road, approximately 15km east of Emalahleni, Mpumalanga. CIDB 7CE. The repair scope of work will cover the following areas: The offloading area. Batch tank area phase 2. Effluent launders. Effluent sump. Degasser
Construction of Phase 9C of the Klipgat sanitation infrastructure in Sofasonke, Ward 24 in Klipgat, North West. CIDB 7CE. The exact GPS co-ordinates are currently not available, however the GPS marker has been placed at a central location of the Klipgat area until the exact location is confirmed 25°28'21.6"S
Construction of Phase 1 for the return effluent distribution water infrastructure to Zones 3, 5, 6, 7 and 9 of the Coega SEZ in Port Elizabeth, Eastern Cape. CIDB 8CE. The extent of the planned works entails the construction of new RE pipelines and ancillary works. The GPS marker has been placed in Zone