Construction of the 15 Ml/day Leeuwkuil wastewater treatment plant and the refurbishment of the existing works located on the corner of Boy Louw Street (R28) and Lager Street in Vereeniging, Gauteng. CIDB 9CE . The exact GPS is placed at 26°40'18.73"S 27°53'56.87"E
Construction of Didi, Ezinkozweni and Mafeni reticulation for the Rosedale to Libode water supply infrastructure, Libode, Eastern Cape. Project value of R20 555 578.47 inclusive of VAT. The exact GPS location is not known and the Marker has been placed at Nyandeni Local Municipality - Libode: 31°32'47.5"S
Construction of sewer and water reticulation network for 950 stands in Khalinkomo and Vergenoeg, Wesselsbron, Free State. CIDB 7CE. Estimated GPS coordinates for the proposed Khalinkomo Township is -27.822766956315995, 26.387273267870423.
Upgrading of extension 32, 33 and 34 sewer reticulation network in Ermelo, Mpumalanga. CIDB 8CE. The exact GPS coordinates are unknown but the marker has been placed at the municipality 26°31'40.8"S 29°59'19.1"E
Construction of the Bospoort pipeline on Bospoort Portion 4 of Tweedepoort 283 JQ , Rustenburg Municipality, North West. CIDB 9CE. Scope of works could include: construction of a 500mm diameter rising- and an 800mm diameter gravity potable water pipelines from the Bospoort WTW to tie into the existing
Upgrade and refurbishment of the civil works at the Paarl Wastewater Treatment Works in Paarl, in the Western Cape. The scope of work for the project’s first phase at the WWTW includes demolishing unused infrastructure; constructing a new raw sewage lifting station and inlet works; establishing a new
Upgrading of the Bayside Canal from Blaauwberg Road to Rietvlei, Milnerton, Western Cape. The project value is R 69 172 805,00. The proposed project consists of two components: formalising the cross-section of the Bayside Canal between Blaauwberg Road and the canal outlet at the northwestern corner of
Upgrading of the existing Williston wastewater treatment works, located in Williston, Northern Cape. CIDB 7CE. The existing wastewater treatment works capacity to be upgraded to treat raw, pumped, sewage flows for the current estimated permanent and seasonal population fluctuations of approximately 460
Construction of a 300Ml reservoir, bulk pipelines and associated infrastructure near Muldersvlei, Western Cape. CIDB 9CE. The GPS co-ordinates are 33°47'45.1"S 18°47'52.9"E.
Construction of the Ndindani Reticulation in Giyani, Mopani District Municipality, Limpopo CIDB 7CE The exact location is not known and the GPS marker has been placed at the Giyani Water Treatment Works 23°19'31.3"S 30°42'30.1"E