Upgrading of the pavement outfall sewer pipeline in Khuma, North West. CIDB 7CE. The exact GPS location is not known and the Marker has been placed at City of Matlosana Local Municipality, 26°51'59.5"S 26°39'56.2"E
Design and construction of the 10 ML/d Havercroft water treatment works and 21 ML/d Spitzkop water treatment works in Havercroft and Spitzkop in Limpopo. CIDB 9CE. The GPS coordinates are not known and the marker has been placed at Spitskop Chrome Mine in Spitzkop 24°47'53.9"S 30°09'25.0"E
Upgrading of the McGregor water treatment works, located on Voortrekker Street, McGregor, Western Cape. The project value is R 49 088 971,92. Scope of works: Civil and structural works: Construction of a 20m long, 11m wide building to house the new water treatment works including 6m high portal frames,
Construction and refurbishment of Phase 2 for the Mogalakwena waste water treatment works and Rebone maturation ponds within the Mogalakwena Local Municipality in Mokopane, Limpopo. CIDB 8CE. The exact GPS coordinates are not known and the GPS marker has been placed at Rebone-A Village 23°25'47.2"S 28°37'18.4"
Construction of South Coast Phase 3 Pipeline within the Ugu District Area, KwaZulu-Natal. The exact co-ordinates are currently not available however the GPS marker has been placed in the Ugu District Municipality: -30.6217975; 30.2512728
Phase 1 for the replacement of 12.7km of asbestos cement pipes to uPVC pipelines in Frankfort and Namahadi, Free State. CIDB 6CEPE/7CE. The contract will consist of the following: The replacement of two asbestos cement main supply pipelines with HDPE/uPVC- 160-250mm diameter and the replacement of the
Upgrading of the Klapmuts wastewater treatment works, phase 1, located in Klapmuts, Western Cape. The project value is R 32 131 179,33. The GPS co-ordinates are 33°48'12.9"S 18°51'28.9"E
Construction of the Wendywood water pipe replacement in Wendywood, Region E of the City of Johannesburg, Gauteng. CIDB 8CE. Scope of works could include: Site clearance of the pipeline route. Pipe supply and laying. Construction of pre cast concrete manholes. Erf re-connections. Excavation of launch
Construction of Borakalalo water supply starting at the Motswedi water treatment plant, Borakalalo, Ngaka Modiri Molema District Municipality, North West. Value of R106 764 538.93. Scope of work includes: Refurbishment/upgrade of the Motswedi water treatment works (sand filter, air filter blowers, supply
Construction of storm damage repairs at the Verulam and Umdloti waste water treatment works located in Verulam, KwaZulu-Natal. CIDB 7CE. This project specifically focuses on the damages to the waste water infrastructure in the Umdloti WWTW catchment which includes damages to sewers, sewer pump stations