Installation of internal services for 2 lots of 500 stands, Project A & B at Boitekong Extension 39, also known as Popo Molefe in Rustenburg Local Municipality, North West. CIDB 7CE. Scope of works could include: stabilisation of gravel roads, storm water control, erosion protection, water supply and
Construction of Waterborne Sanitation System within ward 16 and 21, Edendale, Pietermaritzburg. CIDB 7CE. The exact GPS coordinates are not known and the marker has been placed in ward 16 29°41'04.8"S 30°17'14.1"E
Construction of the eManzana waste water treatment plant in eManzana, Mpumalanga. CIDB 7CE. The exact coordinates are not known and the marker has been placed at the Chief Albert Luthuli Municipality offices 26°04'00.8"S 30°06'51.6"E
Refurbishment of the Jan Kempdorp waste water treatment works in Jan Kempdorp, Northern Cape. CIDB 7CE/5ME. The approximate GPS co-ordinates are 27°54'40.9"S 24°48'08.5"E.
Construction of phase 2 of the Isonti low-cost housing water & sanitation scheme, the Ugu District Municipality, KwaZulu-Natal. Value of R72 673 712.38. The scope of works could include the construction of sewer pump stations, 160 diameter 3km steel rising main, 3km 160 diameter class 16 UPVC gravity
Construction of a sewer reticulation pipeline in Ward 13, Shenstone Ambleton, approximately 10km south of Pietermaritzburg CDB, KwaZulu-Natal. Value of R16 526 071,90. Scope of works could include construction of sewer pipelines, manholes, erf connection pipelines and the terminal manhole. The site is
Construction of a new bulk outfall sewer and associated works situated in Montague Gardens, Western Cape. The project value is R 315 011 965,28. The GPS co-ordinates are 33°50'53.9"S 18°31'13.1"E.
Refurbishment of the wastewater treatment works in Ezenzeleni/ Warden, Free State. CIDB 7ME & 6CE. The GPS coordinates are unknown and the marker has been placed at the Warden Municipal Office -27.85593827401358, 28.96510056205902.
Refurbishment of water treatment works and replacement of AC pipes, Komatipoort, Mpumalanga. CIDB 7CE. Scope of works could include: Replacement of 21.3km asbestos cement pipes with uPVC and installation of isolation valves, scour valves, bulk water meters, fire hydrants, 775 metered stand connections.
Rehabilitation of Palmiet Pump Station situated in Van Bergen Street, Alberton, Gauteng. The contract value is R817 457 618,99. The scope of work will include but is not limited to work associated with the previously constructed 40.571km section of the existing B17 pipeline starting at Zuikerbosch Pump