Construction of a handling facility for the Bayvue Precinct in Bayview, Richards Bay, KwaZulu-Natal. Bayveu will accommodate a Multi Purpose Terminal (MPT) and Dry Bulk Terminal (DBT) with a total area of 349ha. The entire precinct will comprise of a total number of 14 berths and 3 terminal operators
Construction of the proposed Liquefied Natural Gas (LNG) Terminal at the Richards Bay Port within Richards Bay, KwaZulu-Natal. CIDB 9CE. The proposed terminal will occupy a footprint of approximately 15.8ha and will consist of 45 storage tanks which will store liquid petroleum gas (LPG), and a mix of
Infrastructure maintenance and repairs of buildings, civil, mechanical, electrical and installations for the Van Rooyenshek Land Port of Entry in the Free State. CIDB 7CE/GB. GPS coordinates for Van Rooyens Border Crossing is -29.7562840, 27.1084821.
Upgrading works for the Nolungile public transport interchange along Japhta K Masemola Road (M9) in Khayelitsha, Cape Town, Western Cape. CIDB 8CE. The GPS co-ordinates have been placed at the existing Nolungile PTI 34°00'54.3"S 18°38'55.7"E
Construction of a dry port in Newcastle, KwaZulu-Natal. The ideal site is Erf 17411 to 17470 Newcastle within the Riverside Industrial area. A dry port is an inland intermodal terminal directly connected by road or rail to a seaport. The exact co-ordinates are currently not available however the approximate
Construction of Gate 4 access control building and weighbridge at Medupi Power Station, Limpopo CIDB 7CE. The GPS coordinates are 23°42'17.1"S 27°33'48.1"E
Infrastructure maintenance and repairs of buildings, civil, mechanical, electrical and installations for the Makhaleng, Telle Bridge and Sepapushek Land Ports of Entry situated on the Free State / Lesotho border. CIDB grading: 7CE/GB. GPS coordinates for Makhaleng Port of Entry is -30.163124587207317,
Construction of the IRT phase 2A closed median station, left-aligned median and kerb side stop infrastructure, located in Cape Town, Western Cape. CIDB 8GB. The exact GPS co-ordinates are not available so the marker has been placed at the location of the site inspection meeting at Civic Centre, 12 Hertzog
Upgrading of the Nonkqubela Public Transport Interchange in Nonkqubela, Cape Town, Western Cape. The project value is R 89 562 000,00. The exact GPS co-ordinates are not available so the marker has been placed at the location of site briefing meeting at Sub Council 9 Office, 7 Bonga Drive, Village 3
Construction and upgrade of Nyanga Public Transport Interchange on the corner of Emms Drive and Sithandatu Avenue, Nyanga, Cape Town, Western Cape. The project value is R 267 056 680,00. The GPS co-ordinates are 33°59'32.2"S 18°34'56.0"E.