The proposed underground mine is located approximately 10km north west from the town of Mokopane in Limpopo Province. A mining right has been applied for on the Farms Turfspruit 241 KR and Macalacaskop 243 KR. The Platreef project is likely to be the largest mining project in South Africa over the next
Construction of a solar PV and wind systems to supply 40 MW of clean energy to the mine via a wheeling arrangement from sites in Limpopo and Western Cape that will power Sedibeolo's mining operations in the North West province. The GPS for the sites for the proposed works are unknown at this stage. The
The project is located 270 kilometres south-west of Kimberley, the regional capital of the Northern Cape province. Importantly, the project has access to significant local and regional infrastructure, with mine infrastructure including a regional power grid feed, bitumen access roads, access to a bulk,
Development of Tjate Platinum mine with associated infrastructure, smelter and refinery near Steelpoort in the Limpopo Province. Jubilee Platinum is planning a new $400m platinum mine producing about 262,000 oz/year from its Tjate prospect in South Africa's western Bushveld. Project value: $510 million.
The 4 009 hectare Sterkfontein project will be developed as an underground mine. The project is located in the Bethal district of the Highveld coalfield, in the Mpumalanga province, 143km South-East of Johannesburg. Wholly-owned subsidiary, Keaton Mining acquired the new order prospecting rights on
The Steenkampskraal project is located almost 70km north of Vanrhynsdorp in the Western Cape and is expected to be one of the first rare-earth mines to be developed outside China. The Steenkampskraal mine was a high grade from producer with a known process for recovering rare earths. The total capital
Development and construction of a 35 MW solar plant at or adjacent to the mine that will power Sedibelo's mining operations in the North West province. The GPS coordinates have been placed at the Pilanesberg Platinum Mine, lat: -25.1058397; long: 26.988417
Construction of a 132MWp solar photovoltaic plant and battery energy storage system based within the municipal jurisdiction of Ba-Phalaborwa, Limpopo, just outside Namakgale township, and will be approximately 20km from the mine. The location is strategically chosen to allow for direct supply to the
Establishment of two additional ventilation shafts, associated infrastructure upgrades and changes to the approved surface infrastructure layout at the Marula platinum mine on the farms Clapham, Winnarshoek and Driekop in Sekhukhune, Limpopo. GPS coordinates lat: -24.5034064; long: 30.0718992. The proposed
Phase 3 is the re-establishment of the hydromining infrastructure to the Winkelhaak Tailings dump at the Evander Gold Mine in Mpumalanga. A definitive feasibility study completed on the Elikhulu tailings project has shown the project to have excellent recovered grades and gold production, attractive