Eland Platinum has concluded a sale agreement with Barplats Mines to acquire the Maroelabult mine in the Brits area, North West. Proposed works will include mining, a chrome floatation plant and re-processing of waste rock dumps at Maroelabult mine and run of mine stockpiles, vent shafts, additional
Rand Uranium, a subsidiary of Sibanye, intends to develop the Cooke Uranium Project located within approximately 395 hectares of land over various portions of the farms Springbok Kraal 359 KQ, Modderfontein 345 IQ, Doornpoort 347 IQ, Waterpan 292 IQ, Luipaardsvlei 243 IQ, Luipaardsvlei 246 IQ, Panvlakte
The Steenkampskraal project is located almost 70km north of Vanrhynsdorp in the Western Cape and is expected to be one of the first rare-earth mines to be developed outside China. The Steenkampskraal mine was a high grade from producer with a known process for recovering rare earths. The total capital
Construction of a 150MW solar photovoltaic facility and related infrastructure at the Amandelbult Complex, located in Thabazimbi Local Municipality, Limpopo. GPS coordinates 24°46'22.6"S27°22'22.0"E
African Nickel Ermelo is undertaking a Bon Accord underground mining project and associated infrastructure located approximately 9km south west of Lows Creek and 20km to the north east of Barberton in Mpumalanga. Estimated GPS coordinates: -25.685559472866373, 31.224976520900718.
Construction of a 132MWp solar photovoltaic plant and battery energy storage system based within the municipal jurisdiction of Ba-Phalaborwa, Limpopo, just outside Namakgale township, and will be approximately 20km from the mine. The location is strategically chosen to allow for direct supply to the
The Mopane Mining Project is situated 40 km (direct) and 63km (via road) north of the town Makhado and 7 km west of Mopane in the Musina and Ma-khado Local Municipal areas, Vhembe District, Limpopo. It is contiguous to the Makhado Project in the Limpopo Province and has a total resource of 7.2 billion
Glencore intends to develop a photovoltaic solar facility, including battery storage, at Glencore Eastern Mines located approximately 26km south of Steelpoort and 34km north-west of Lydenburg in Limpopo. Approximate coordinates for the centre of the site are: Lat: -24.970288°S; Long: 30.132833°E..
The Thuso (previously Witfontein) project is located on the farm Holfontein 111 IS (remaining extent) and farm Witrand 103IS portions, 11, 12, 15, 19 and 20 approximately 13km north west of the town of Bethal in the Mpumalanga Province.The proposed Witfontein project has a measured coal resource of 18.86
The project is located 270 kilometres south-west of Kimberley, the regional capital of the Northern Cape province. Importantly, the project has access to significant local and regional infrastructure, with mine infrastructure including a regional power grid feed, bitumen access roads, access to a bulk,