Construction of the Insimbi Ridge development located in the Cato Ridge Logistics Park along Eddie Hagan Drive in Cato Rodge, KwaZulu-Natal. The estimated value of the overall development is R21 billion with each warehouse esitmated at R200 million. The whole development will encompass 7 hectares. The
Lanseria Smart City is a conceptual project planned for the Greater Lanseria area in Gauteng. The concept is a framework and a suggestion / guideline for proposed developments in the area and is subject to change as the concept evolves. The concept will go through the following phases before actual construction
Construction of mini factories located 7 Cypress Dr, Glen Anil, Durban North, KwaZulu-Natal. The GPS marker has been placed on Cypress Drive 29°45'10.3"S 31°01'49.4"E
Construction of 3 warehouses situated within the Atlantic Hill Business Park, located on the corner of Giel Basson and Welbeloond Drives, Cape Town, Western Cape.
The 3 warehouses include 6 500m² of warehouse space and 500m² of offices each, a total of 212 parking bays and 21 dedicated truck loading
Construction of a new Biovac bio-pharmaceutical production facility located at Portion of Cape Town, Erf 118293, Remainder 103659, Remainder 1056 & 14836, corner of Diesel Road and Ndabeni Road, Ndabeni, Cape Town, Western Cape. The GPS coordinates are -33.9345613, 18.4900727
Construction of the Aerosud Workshop 9 located on 520 Van Ryneveld Avenue, Pierre van Ryneveld Ext 30, Centurion, Gauteng. The scope of works comprises the construction of one single storey workshop and site services, roads, paved areas, remedial work to existing buildings and other related works. Construction
Construction of the proposed new 200 000m³ bulk storage fuel facility for New Horizon Oil & Gas to be located along Petroleum Street, Erf 191 Waltloo, Portion 10 Hartebeestpoort 328-JR, Pretoria, Gauteng. GPS Co-Ordinates have been placed at Petroleum Street, Lat -25.7237799, Long 28.3111899
Construction of a new Heineken Brewery within the Cato Ridge Logistics Hub, potentially along Eddie Hagan Drive, Harrison, Cato Ridge, north of the N3 highway, eThekwini Metropolitan Municipality, KwaZulu-Natal. The contract value is estimated at R6 Billion. The GPS coordinates for the general location
Construction of a new Leroy Merlin located on Solomon Mahlangui Drive, Silverlakes, between We Buy Cars & Bidvest McCarthy VW Silver Oaks, Bendeman Boulevard, Silver Lakes, Pretoria, Gauteng. The GPS coordinates are -25.7690577, 28.3564995
Alteration works for the existing hardstands Premier FMCG located on 341 Sydney Road, KwaKhangela, eThekwini Municipality, KwaZulu-Natal. The scope of works involves alterations to the existing infrastructure surface area at the Premier FMCG facility, work will be done on the hardstands (concrete surfaces