Special maintenance on National Route R369 Section 2 between Hopetown at km 0.00 and the Municipal Border at km 47.17, R387 intersection, Thembelihle Local Municipality, Pixley ka Seme District Municipality, Northern Cape. The exact GPS location is not known and the marker has been placed at the R387
Repairs to the fire damaged De Aar Magistrates Court, at 43 Voortrekker Street, De Aar, Northern Cape. The contract value is R 29 280 729,60. The work at the existing court building comprises of the repairs to the fire damaged section of the double storey building. The ground floor level will also
Construction of HDPE sewer network Phase 2 in Kuilsville, Daniëlskuil, Northern Cape. CIDB 7CE. Scope of works could include: Eradication of conservancy tanks through HDPE sewer network. The exact GPS location is not known and the marker has been placed at Kgatelopele Local Municipality 28°10'56.7"S
Construction of the new Vosburg Magistrates Court, in Church Street, Vosburg, Northern Cape. The current magistrates' court is located on erf 87, which is to be consolidated with the new location at erf 86. The GPS marker has been placed on erf 86 30°34'24.0"S 22°52'51.3"E
Construction of Kuruman N14/R31 bypass road Phase 1A in Kuruman, Northern Cape. Scope of works could include overhaul, clearing and grubbing, excavation for open drains, prefabricated culverts, concrete kerbing, concrete, channelling, chutes and downpipes, and concrete linings for open drains, mass earthworks
Emergency leak repairs on priority leaks identified from the smartball survey and mid station valve repairs located at Riverton, Kimberley, Northern Cape. The project value is R 19 035 634,61. The GPS marker has been placed at the Riverton Water Treatment Works at 28°31'13.8"S 24°42'09.1"E.
Construction of the new Moolmans Workshop at the existing Tshipi Borwa Mine in the Kalahari, Northern Cape. The Tshipi Borwa Mine is located on the farm Mamatwan 331 in the southern extremity of the KMF approximately 47km west – northwest of Kuruman and 35km north of Kathu. The KMF extends continuously
Construction of 142 BNG houses in Siyathemba in Kathu, Northern Cape. The project value is R 25 771 249,30. The scope of works includes 120 standard 40m² houses and 22 Category C 45m² disabled houses. The exact GPS location is not known and the Marker has been placed at the Gamagara Local Municipality,
Special maintenance of National Route R389 Section 2 from Hanover at km 0.00 to Philipstown at km 72.13 in the Pixley Ka Seme District Municipality / Renosterberg Local Municipality, Northern Cape. The approximate GPS location has been placed along the proposed route of construction, 31°03'42.3"S 24°27'56.9"E.
Construction of a 115MW photovoltaic solar facility and associated infrastructure on the remaining extent of portion 1 of the farm Lime Bank No. 471, Registration Division Kuruman in the Northern Cape. The town of Kathu is located approximately 18km south east of the proposed development.