You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 1221 items with Total of 1302 results

Advertising



Projects

Daimler Logistic Sequencing Facility
172
  • 35245
Development of a logistic sequencing facility for Daimler Truck Southern Africa within the East London Industrial Development Zone, West Bank, East London, Buffalo City Metropolitan Municipality, Eastern Cape. Extent of the Works: Factory - single storey steel framed factory building, approximately 16


Projects

Haga Haga Wind Farm
182
  • 20278
Construction of a wind farm for 150MW across various land parcels located in Great Kei Local Municipality, which lies just inland of the coastal hamlets of Haga Haga, Morgans Bay and Kei Mouth in the Eastern Cape.The total area of the site equates to approximately 9100 hectares. The approximate GPS co-ordinates


Projects

Belgravia Valley Phase 3
91
  • 17947
Construction of 372 residential units for Phase 3, Belgravia Valley for a mixture of low and middle income groups in Belgravia, East London, Eastern Cape. The exact co-ordinates are currently not available however the approximate area of location is 33°00'09.0"S 27°53'52.1"E


Projects

East London Magistrates Court
177
  • 30130
Renovations and refurbishment to the existing East London Magistrates Court at 4 Buffalo Street, East London, Eastern Cape. The exact GPS location is 33°01'14.9"S 27°54'14.8"E.


Projects

N2 Sec 16 End Freeway to Brakfontein I/C
96
  • 28573
Dualling of National Route N2 Section 16 from end freeway at km 22.00 to Brakfontein interchange at km 27.40, East London, Eastern Cape. The GPS co-ordinates have been placed on the Brakfontein Interchange 32°53'55.2"S 27°59'12.8"E.


Projects

Xhora Mouth Clinic
132
  • 28621
Construction of a primary health care facility called Xhora Mouth Clinic located at Xhora Mouth, KuMatokazi, Eastern Cape. The scope of works could include a main clinic building with 5 consulting rooms and 2 counselling rooms. Four single bed units for staff accommodation. The total built area for clinic


Projects

Wilsonia Used Oil Recycling Facility
216
  • 21316
Construction of a workshop, warehouse and offices, used-oil storage areas, additional entrance to the facility, centrifuge, boiler and waste disposal area located along Signal Street, East London, Eastern Cape.


Projects

West Bank Restitution: Phase 2
197
  • 23418
Construction of the West Bank restitution phase 2, in Buffalo City Metropolitan Municipality, East London. CIDB 8CE. The exact co-ordinates are currently not available however the approximate area of location is Buffalo City, 33°00'50.4"S 27°54'13.7"E.


Projects

N2 Section 15, N6 Section 1 & R72 Section 4
98
  • 30337
Construction and the routine road maintenance of N2 Section 15 at km 0 to Section 16 at km 31.26 and N6 Section 1 from km 0 to km 32.33 and R72 Section 4 from km 9.90 to km 61.78 in East London, Eastern Cape. The project value is R 60 290 559,69. The approximate GPS location has been placed along the


Projects

Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56
249
  • 10504
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes

Advertising

Send me a Sample Based on these search results