Construction of two commercial solar thermal electricity generating facilities on a site which lies 20km west of Upington in the Northern Cape. The proposed Upington Thermal Plant Two will consist of heliostats and a Power Tower system with a generation capacity of 150MW. Each facility would include
Construction of two commercial solar thermal electricity generating facilities on a site which lies 20km west of Upington in the Northern Cape. The proposed Upington Thermal Plant Three will utilise parabolic trough technology with a generation capacity of 100MW. Each facility would include the following
Construction of a photovoltaic (PV) solar energy facility, Sirius Two. The facility will be situated approximately 20km southwest of Upington, in the Northern Cape. The facility will have the capacity to supply 75 mw and will include the following infrastructure: a series of PV panels; a new substation;
Construction of the Padrooi Photovoltaic Solar Power Plant on the Farm Padrooi, 22km west of Augrabies in the Northern Cape. The exact co-ordinates are currently not available however the marker has been placed on farm Padrooi 28°37'49.2"S 20°18'42.5"E.
Construction of the new Upington High Court, located on Erf 330, Upington, Northern Cape. The GPS marker has been placed on erf 330, 28°27'00.5"S 21°15'31.3"E
The proposed Sishen Expansion Project at SIOM comprises of further pit expansions that include Far south pushback 21 and 19, Lylyveld pit expansion, C&G stockpile at Far south and Lylyveld pit, Moolmans workshop, access road and pollution control dam, proposed Far south Waste Rock Dump,heavy and light
Maintenance of National route R360 Section 1 from Upington at km 0.00 to Askham at km 172.06 and National Route R31 Section 1 from Rietfontein at km 0.15 to Askham at km 86.44, Dawid Kruiper Local Municipality, ZF Mgcawu District Municipality, Northern Cape. The GPS marker has been placed along the construction
Construction of a a 30MW solar photovoltaic plant for Vedanta Zinc International’s Black Mountain Mining operations in the Northern Cape. The works will be undertaken on a build, own, operate and maintain basis. The exact GPS location is not known and the Marker has been placed at Black Mountain Mining
Construction of the GK Solar photovoltaic plant with 100MW generation capacity located on the Remaining Extent of the Farm Geelkop 456, near Upington in
the Northern Cape. Included in the scope will be on-site substation, auxiliary buildings, access & internal roads, perimeter fencing, and a 400MWh
Upgrade and expansion of the Kameelmond waste water treatment works in Upington, Northern Cape. CIDB 9CE/ 9ME. The GPS marker has been placed at the Kameelmond waste water treatment works 28°28'41.7"S 21°12'14.4"E