Search Results Found 679 results

Select All

Advertising



Projects

Sterkfontein Project, Mpumalanga
524
  • 5876
The 4 009 hectare Sterkfontein project will be developed as an underground mine. The project is located in the Bethal district of the Highveld coalfield, in the Mpumalanga province, 143km South-East of Johannesburg. Wholly-owned subsidiary, Keaton Mining acquired the new order prospecting rights on


Projects

Balfour WWTW, Ph 1 & 2
167
  • 22055
Upgrading of the Balfour Waste Water Treatment Works, phase 1 and 2 in Dipaleseng Local Municipality, Mpumalanga Value of Contract R81 135 711.81


Projects

Witfontein Opencast Coal Mine, Mpumalanga
233
  • 19433
The Witfontein project is located on the farm Holfontein 111 IS (remaining extent) and farm Witrand 103IS portions, 11, 12, 15, 19 and 20 approximately 13km north west of the town of Bethal in the Mpumalanga Province.The proposed Witfontein project has a measured coal resource of 18.86 million tonnes


Projects

R573 Section 2 Work Package A
129
  • 24750
Upgrading of National Road R573 Section 2 Work Package A from km 24.70 to km 36.20 in the province of Mpumalanga in the District Municipality of Nkangala and in the Local Municipality of Thembisile Hani. CIDB 9CE


Projects

Safari Lodge
143
  • 23929
Construction of a 100-room (200-bed) safari lodge just north of the Phalaborwa Gate within the boundaries of the Kruger National Park in Mpumalanga. The term will be for 25 years and will require equity participation by successful land claimants.


Projects

Concession Lodge
137
  • 23928
Construction of a lodge for 50 guest guest beds and 30 staff beds on a new concession of approximately 15 000 hectares south of the Letaba River on the western boundary of the Kruger National Park in Mpumalanga. Certain activities will be allowed on the concession area and could include equestrian activities.


Projects

Elikhulu Tailings Project, Phase 3
211
  • 19804
Phase 3 is the re-establishment of the hydromining infrastructure to the Winkelhaak Tailings dump at the Evander Gold Mine in Mpumalanga. A definitive feasibility study completed on the Elikhulu tailings project has shown the project to have excellent recovered grades and gold production, attractive


Projects

Elikhulu Tailings Project, Phase 2
210
  • 19803
Phase 2 is the re-establishment of the hydromining infrastructure to the Leslie Tailings dump at the Evander Gold Mine in Mpumalanga. A definitive feasibility study completed on the Elikhulu tailings project has shown the project to have excellent recovered grades and gold production, attractive financial


Projects

N2 section 34 - P97/2 and road D803
241
  • 17489
Upgrading of the national route N2 section 34, Panbult Intersection: Link and grade-separation scheme for road P97/2 and road D803 for the Kangra Mine coal haulage at Panbult, Mpumalanga. Scope of works include: Construction of a 3-span continuous bridge with a post tensioned double cell box girder


Projects

Secunda Split Level Shopping Mall
98
  • 8270
Construction of a new split level shopping mall. Located between Walter Sisulu Road, Helen Joseph Drive and Danie Theron Street, Secunda, Mpumalanga.

Advertising

Send me a Sample Based on these search results