Construction for the new PL6 pipeline between Jameson Park Terminal and Airport Depot, including ancillary facilities the starting point of the project is located at Jameson Park Terminal 2, Poortjie Road, off R42 and ends on 43 Springbok Road, Bartlett, Boksburg, Gauteng. CIDB 9CE. The overall scope
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue
Construction of a high-speed rail line connecting Johannesburg and the ports of Durban, with a total length of about 570 kilometers within South Africa. The exact GPS co-ordinates are not yet known however the GPS marker has been placed at the Gauteng Province, Lat -26.2707593, Long 28.1122679
Construction of the Rietfontein photovoltaic solar park and associated infrastructure and structures situated on Portion 229 of farm Rietfontein 128 IR in Springs, Gauteng. The solar park will have a maximum export capacity of 32MW and a footprint of 52ha. The GPS co-ordinates are 26°18'07.2"S 28°25'04.0"E
Construction of encasements to the BG1 and BG2 pipelines between Vaal Dam and Zoekfontein Control Works located in Gauteng. Scope of works includes the construction of encasement as well as a new flow meter chamber to the BG1 and BG2 and appurtenant works. CIDB 8CE / 7CE
Construction of the Isondo Precious Metals Facility, on Portion 282 of the Farm Witkoppie No. 64 – IR, OR Tambo SEZ (Gauteng Industrial Development Zone), Bonaero Park, Kempton Park, Gauteng. The Facility will manufacture Platinum Group Metal (PGM) based Membrane electrode assemblies (MEA) and catalysts