Upgrading of National Road R573 Section 2 & 3 from Moteti at km 48.16 to Slovo at km 6.5 within the provinces of Limpopo and Mpumalanga, and in the District Municipalities of Sekhukhune and Nkangala, which navigates through three local municipalities, namely Ephraim Mogale, Limpopo, Elias Motsoaledi,
Construction of a community library on Erf 255, Petsaneng Township, Mmametlhake, DR JS Moroka Local Municipality, Mpumalanga. Project value: R21 055 784,91. GPS Coordinates: 25.1090947°S, 28.5129391°E
Renovation and construction of Lugebhuta Secondary School, Phase 3, Schoemansdal, Shongwe Mission, Nkomazi Local Municipality, Mpumalanga. CIDB 8GB. The GPS marker has been placed at Lugebhuta Secondary School 25°41'41.2"S 31°29'54.0"E
Rehabilitation including selective treatment of road P8/1 between Mashishing and Bambi for a distance of 11km in the Bohlabela District of Mpumalanga. Value R 171 458 454.21 Scope of works indicates this is Part A. The GPS co-ordinated have been placed at Road D2258 to Bosoord off the P8/1 (R36) intersection
Upgrading of the Verena water infrastructure in Ward 08 in the Thembisile Hani Local Municipality, Mpumalanga. Estimated value of R38 855 536.01. The exact GPS coordinates are not known and the marker has been placed at Kwaggafontein C as per the site inspection 25°18'41.4"S 28°57'02.2"E
Construction of the proposed Skywalk which is a cantilevered glass bottomed walkway that will be about 12m in length and 5m wide and will protrude from an elevated view point at the God’s Window site located on Farms De Houtbosch 503 KT and Portion 2 of Farm Lisbon 531 KT within the Thaba Chweu Local
Rehabilitation of Road D2950 from Steenbok to road D797 for a distance of 13.40km in Nkomazi in Ehlanzeni Region, Mpumalanga. CIDB 8CE. The GPS marker has been placed at the intersection of D2950 and D797 25°39'33.0"S 31°54'01.1"E
Construction of a child care centre and community hall, Ntunda, Nkomazi Local Municipality, Ehlanzeni District, Mpumalanga Province. Project Value: R32 894 855,00. The location of the site is 25°43'56.1"S 31°45'27.9"E
Construction of a new maternity at Themba Hospital in Kabokweni, Mbombela Local Municipality, Mpumalanga Province. CIDB 9GB The GPS marker has been placed at the existing hospital 25°20'42.0"S 31°07'18.0"E
Construction of the Halfgewonnen Solar Photovoltaic Facilities on Portions 7, 8, 9 and 16 of the Farm Halfgewonnen 190 IS in Mpumalanga Province. The facility will generate approximately 80MW and will consist of 2 components - Halfgewonnen Solar PV 1 will generate approximately 20MW for initial use by