Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Construction of the new Huku Police Station on Portion 7 of the farm Mndileni No. 88 SG, in the Eastern Cape. The project value is approximately R 90 000 000,00. The exact co-ordinates are currently not available however the approximate area of location is Mandileni. 30°43'49.7"S 28°50'26.7"E.
Construction of the Wilo Comprehensive Senior Secondary School, Eastern Cape. Estimated Value R 65 922 974,03. The exact co-ordinates are currently not available however the approximate area of location is 31°52'56.6"S 28°57'57.5"E .
Construction and development of three wind turbines each with 5.8MW on farm 143, Wesley, Eastern Cape. The wind turbines will have a 170-meter rotor diameter and 134-meter hub height. The scope of works will include the concrete foundation, cabling between turbines, on-site substation, transformer station