Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Construction of the Sterkspruit Driving License Testing Centre on Erf 79 and 80, Sterkspruit, Senqu Local Municipality, Eastern Cape. The project value is R39 824 578,26. The GPS location has been placed on erf 79: 30°31'39.5"S 27°22'10.7"E
Construction of bulk sewer lines and pump stations for Sterkspruit & Tapoleng as part of the RBIG project: Sterkspruit waste water treatment works and associated bulk infrastructure, Senqu Local Municipality, Eastern Cape. CIDB: 7CE. Works will comprise of the following: Sewer lift pump station, there
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.
Construction of Nkopane Junior Secondary School in Sterkspruit within the Joe Gqabi Region, Eastern Cape. Project value: R 48 481 518.91. The scope of works will include construction of seven new classrooms and support spaces, demolitions, nutrition block, admin block, grade R classroom and toilets,
The Xolobeni project is regarded as one of the largest undeveloped mineral sands resources in the world, containing more than nine-million tons of ilmenite. The proposed Xolobeni mineral sands project will be a dry-mining operation as the area being mined is relatively small. Between 13 million tons
Construction of the bulk sewer lines and pump stations for Mokhesi next to Sterkspruit as part of the RBIG Project in the Eastern Cape. Estimated value: R69 894 840.09. The GPS is placed at the Sterkspruit Water Treatment Works, 30°31'50.0"S 27°21'21.5"E.
Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution