Construction works for the Mabandla Total Energies garage located on Erf 9081, Masakhane Street, Tshongweni, Katlehong, Ekurhuleni, Gauteng. The scope of works involve demolitions to the existing Sasol petrol station and the construction works for the new Total Energies. The exact GPS coordinates are
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Manufacturing of NCP vehicles in Isondo, Sasolburg, Gauteng. The exact details of the project location, scope and value is still to be confirmed. The GPS Coordinates have been placed in Isondo Lat -26.7895628 & Long 27.8495522
Construction of 8 x 2 level blocks of about 40 units each to accommodate approximately 364 students on 9 100m² located at Land is Wealth farm lodge, Sterkfontein, Gauteng. CIDB 8GB . The exact GPS Coordinates are 26°00'44.7"S 27°41'34.2"E.
Construction of a new school, Montic Factory Primary School to be situated on Erf 3138 Zonkizizwe Township, Katlehong, Johannesburg, City of Ekurhuleni, Gauteng. The contract value is R134 195 579,87. Scope of works could include but is not limited to the construction of new classroom facilities (which
Construction of the Eden-Ridge Secondary School on Celtis Street, Palm Ridge, Katlehong, Gauteng. The scope of works involve the replacement of the full mobile school with brick & mortar on the same site. CIDB 8GB. The GPS coordinates are -26.3945792, 28.1379456
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive