Development of a new platinum mine, Garatau Platinum Mine, on the Farm De Kom 252 KT, the remainder of the Farm Garatouw 282 KT and Portion 1 of the Farm Garatouw 282 KT. The proposed site is located approximately 25km north of Steelpoort, in the Limpopo Province. Estimated project value : R6,5 billion
The Mopane Mining Project is situated 40 km (direct) and 63km (via road) north of the town Makhado and 7 km west of Mopane in the Musina and Ma-khado Local Municipal areas, Vhembe District, Limpopo. It is contiguous to the Makhado Project in the Limpopo Province and has a total resource of 7.2 billion
Construction of Driefontein internal roads in Ephraim Mogale Local Municipality, Limpopo. Value of the project: R31 523 045.72. The project entails the upgrading of Driefontein internal roads of 3.971km from gravel to asphalt standard and provision of stormwater management to safely discharge runoff
Construction of Grootpan, Sias, Longden Garamaswikana and Ga-Mmamoleka rural water supply Phase 3 for North Cluster Reservoir Complex in the Capricorn District Municipality, Limpopo. Project Value: R36 523 735,27. The project site is located approximately 60km north east of Polokwane. It is positioned
Construction of the Vergenoeg water source development and water reticulation in Vergenoeg Village, Limpopo. CIDB 7CE. The GPS co-ordinates marker has been placed in Vergenoeg Village 23°33'14.35"S 28°43'1.64"E
Improvements to National Road R579 Section 3 from Maleetsi at km 0 to Masemola at km 40.9 and from Masemola at km 40.9 to R37 for a total of km 78.9 in the Limpopo province and in the district municipalities of Greater Sekhukhune and Capricorn. The GPS marker has been placed at the intersection of R579
Construction of the Khubvi Police Station on Road D3688, 150/Farm Chibase 215MT in Khubvi, Limpopo. CIDB 7GB Scope of works - construction of the single level buildings with a total gross floor area of approximately 1795m² consisting of the main Police Station (Block A) and the cell block (Block B).
Upgrades to existing Matsobane Primary School, Mphahlele, Capricorn District, Limpopo. R34 982 999.96. Scope of works could include: Demolitions of existing dilapidated blocks (E, G, H, I, J, K); renovations of toilets, classrooms and hall, construction of 2 x 4 classroom block, 2 x 2 Grade R classroom
The demolition, refurbishment and construction of Nkgonyeletse Secondary School in Malegasane Village, Sekhukhune District, Limpopo. The project value is R32 855 659.90. The scope of works could include the demolition of administration block, refurbishment of 23 Classrooms, 23 enviroloo seats and the
Construction of a mixed-used development near Lebowakgomo on farm Groethoek 106KS within Lepelle-Nkumpi local municipality. The total size of the land is 400 hectares. The GPS coordinates are unknown, the marker has been placed in Lebowakgomo 24°18'51.1"S 29°28'57.4"E