Construction of the N2 Section 20 between the Msikaba Bridge and the Mtentu Bridge on the Wild Coast Toll Highway located in Eastern Cape. The project value is R 2 545 887 374,99. The exact GPS co-ordinates are currently not available however the marker has been placed as the Msikaba Bridge 31°17'20.5"S
Coleskop Wind Power (Pty) Ltd is proposing to construct a wind energy facility (WEF) to be developed near Middelburg, Eastern Cape. REIPPP 5. The WEF will host a maximum of 32 wind turbines, each generating 5.5megawatts (MW) of power, with total combined potential power output of a maximum of 140MW.
Construction of a wind energy facility established on Portion 301 of Farm Bontrug, Brak River SW 224 and Grassridge 228, Eastern Cape and is expected to create a total footprint of 19 ha. This will include 26 turbines with a maximum output of 87 Mega Watts, an overhead power line (132kV distribution
Construction of the Umsobombu I Wind Energy Facility, Northern Cape and Eastern Cape. The facility will be developed between Middelburg (Eastern Cape) and Noupoort (Northern Cape) on the provincial border. The WEF will host a maximum of 80 wind turbines, each generating between 1.5 – 4 megawatts (MW)
Construction of the new Ntamonde Police Station on Portion 13 of the farm Ntshangase No. 63 SG, in the Eastern Cape Province. A Marker has been placed at 32°14'17.3"S 28°50'33.6"E
Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Construction of a new feedmill for De Heus Karoo situated on Portion 15 (Portion 1) of Farm Bultfontyn 128, located in Middelburg, Eastern Cape. The scope of work includes the construction of a new feed mill, offices, guard house, fire pump station, security fencing around the perimeter, feed mill and
Upgrading of the R72 Section 4 and MR501 Intersection at km 42.08 in Kidds Beach, near East London, Eastern Cape. The project value is R 75 860 000,00. The exact GPS location is not known and the marker has been placed at R72 intersection towards Kidds Beach 33°08'12.0"S 27°40'44.2"E.
Construction of the new Moyeni Police Station in Moyeni, Eastern Cape Province. The contract value is R 74 325 917,05. The GPS co-ordinates are 32°15'19.8"S 27°39'29.4"E.