Construction of the new Braamfontein 3kv traction substation and demolition of the existing substation, in Braamfontein, Gauteng. CIDB 9: R130 Million Plus
Upgrading of the Shosholoza Meyl Rolling Stock Depot (stages 1 - 6) situated in Rissik Street, Braamfontein, Johannesburg, Gauteng. GPS Lat -26.1972089, Long 28.04218
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E
Upgrading of the Braamfontein Metrorail Rolling Stock Depot (stages 2 - 6) situated at 41a Carr Street, Johannesburg, Gauteng. GPS Co-Ordinates are Lat -26.2002568, Long 28.0255037
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue