You are currently logged out and we are unable to show you directory results. Please Log in or Subscribe for ALL the information relating to your search.

Found 2017 items with Total of 2056 results

Advertising



Projects

Basalt Bryanston
209
  • 31485
Construction of 50 townhouses for a residential development known as Basalt, at 10 Basalt, 29 Wilton Avenue, Bryanston, Sandton, Gauteng. This project will be done over 2 phases. There are 4 names of blocks within this development: Basalt Cloud, Basalt Flint, Basalt Iron and Basalt Slate. Amenities include


Projects

Fernhill Residential Development
73
  • 28847
Construction of the Fernhill residential development situated at 28 Homestead Avenue, Bryanston, Sandton Gauteng. This development will consist of 28 modern, 4 bedroom 2.5 bathroom double storey homes, with a choice of 3 eco-friendly home designs 185.21 sqm - 201.68 sqm. All homes feature exclusive


Projects

University of Science & Innovation
133
  • 28205
Construction of the new University of Science & Innovation situated in Ekurhuleni Gauteng. The GPS coordinates are -26.2145087, 28.2572637


Projects

Tambo Springs Road K148 - Phase 1
401
  • 13466
Construction of the K148 Road, between K146 and K133, including the N3/K148 Interchange and bridge (approximately 6km), in Gauteng. R455 418 557.00. The exact co-ordinates are currently not available however the approximate area of location is 26°23'56.6"S 28°13'50.7"E


Projects

Cleveland 88kV / 11kV Substation Upgrade
339
  • 14103
Upgrading of the existing Cleveland 88kV / 11kV Substation and associated equipment in Johannesburg, Gauteng. CIDB 8 R40 - R130 million.The exact co-ordinates are currently not available however the approximate area of location is Latitude -26.206845 Longitude 28.1137309


Projects

Sibanye Gold Solar Power Project
501
  • 16034
Sibanye completed a pre-feasibility study investigating the potential of solar power as an alternative source of electrical power to partially insulate the company from the effects of electricity supply interruptions from Eskom. The PFS confirmed that solar power provided an economically competitive


Projects

N17 Sec 2, N3 to Tonk Meter
156
  • 31425
The upgrading of surfacing on National Route N17 Section 2, from N3 at km 3.0 to Tonk Meter at km 33.45, in the Ekuhurleni Metropolitan Municipality, Gauteng. The contract value is R607 450 619.79. The exact GPS co-ordinates are not known and the marker has been placed along the possible construction


Projects

Mitochondria Campus - Phase 1
103
  • 29762
Construction of the Mitochondria Energy Campus to manufacture their Phoenix Fuel Cell System (the Solid Oxide Fuel Cell) at the Vaal Special Economic Zone in Rietspruit, Vaal, Gauteng. The campus 12 000m² will produce up to 250MW per annum at maximum production. The project value for phase 1 is estimated


Projects

Far West Gold Recoveries (FWGR) Operation.
692
  • 9956
Far West Gold Recoveries (FWGR) operation in Gauteng. FWGR is being rolled out in a phased approach. Phase 1 included early-stage production, involving upgrading the Driefontein 2 plant to process tailings from the Driefontein 5 dump at between 400 000 t and 600 000 t a month, and depositing the residue


Projects

Joburg-Durban High-Speed Rail
149
  • 28199
Construction of a high-speed rail line connecting Johannesburg and the ports of Durban, with a total length of about 570 kilometers within South Africa. The exact GPS co-ordinates are not yet known however the GPS marker has been placed at the Gauteng Province, Lat -26.2707593, Long 28.1122679

Advertising

Send me a Sample Based on these search results