Upgrading of the Thembalethu water infrastructure in Ward 05 in the Thembisile Hani Local Municipality, Mpumalanga. The project value is R 26 821 154,34. The exact GPS co-ordinates are not known and the marker has been placed at Kwaggafontein C as per the site inspection 25°18'41.4"S 28°57'02.2"E
Demolition, renovations and construction of new facilities at Mgobodi Primary School in Mgobodi Trust, Stand 1132, Nkomazi Local Municipality, Mpumalanga Province. Estimated value of R40 440 457.14. The GPS co-ordinates have been placed at the current school 25°51'33.6"S 31°42'14.6"E
Construction of the proposed Skywalk which is a cantilevered glass bottomed walkway that will be about 12m in length and 5m wide and will protrude from an elevated view point at the God’s Window site located on Farms De Houtbosch 503 KT and Portion 2 of Farm Lisbon 531 KT within the Thaba Chweu Local
Rehabilitation of the flood damaged bridge on road D2943 at Mlumati River Crossing in Driekopies, Nkomazi Local Municipality, Ehlanzeni Region, Mpumalanga. CIDB 8CE. The GPS marker has been placed on the D2943 25°41'02.3"S 31°32'16.6"E
Construction of a learner centre on Portion 8, Erf 3411, 24 Jerepico Street, Nelspruit Extension 29 in Mpumalanga. CIDB 8GB. The scope of works could include the construction of a administrative block which includes advisors cubicles, counselling quarters, open plan and closed offices, mini clinic, boardrooms
Construction and completion of the new Busamed Hospital - Phase 2 located at Erf 2864, Sonheuwel, Nelspruit, Mpumalanga. Scope of works could include but not limited to: renovations in the existing reception area on ground floor, changes to the existing bedward on the first floor and changes to the dayward
The Eloff project is situated adjacent to the Kangala Colliery in Mpumalanga. This allows Universal the opportunity to consolidate the contiguous resource base of the Eloff Project with Universal’s existing Kangala Colliery, and provides optionality for extending Kangala’s life of mine and upsizing the
Construction of Rockdale Extension 2 Primary School, at Erf 2637, Rockdale Extension 2, Steve Tshwete Local Municipality, Mpumalanga. The project value is R 67 051 828,00. The GPS co-ordinates are 25°49'19.1"S 29°32'03.8"E
Renovation and construction of Lugebhuta Secondary School, Phase 3, Schoemansdal, Shongwe Mission, Nkomazi Local Municipality, Mpumalanga. CIDB 8GB. The GPS marker has been placed at Lugebhuta Secondary School 25°41'41.2"S 31°29'54.0"E
Construction of Boekenhouthoek (Mohlamonyane) bus road in Boekenhouthoek, Mpumalanga. Value of R21 065 092.46. Construction of 1700m of road and paving with 80mm concrete interlocking paving. Concrete works for drains. The road is in Ward 7, Zithabiseni Village. Start of road -25.305335 29.023051, end