Upgrading of Road DR08598 between Elitheni Coal Mine (13.4km) and Road R56. The existing gravel road, which is approximately 13.4 kilometres long, is to be upgraded to a bituminous surfaced width applicable varying from 8.6m to 9.2m. There is one major structure on the project. The road pavement includes
Construction of 200 units for Oceanview 1500 housing project in Oceanview, Eastern Cape. The project value is R 23 192 200,00. The exact co-ordinates are currently not available however the GPS marker has been placed in Oceanview 32°38'59.1"S 28°05'53.2"E.
Upgrades, additions and routine road maintenance of National Route N2 Section 10 from km 73.46 to Section 11 at km 71.74, National Route R75 Section 1 at km 0 to Section 2 at km 25.93 and National Route R335 Section 1 at km 0 to km 30.1235 in the Nelson Mandela Bay Metropolitan District, Eastern Cape.
Refurbishment to the National Regulator for Compulsory Specifications building located in Port Elizabeth, Eastern Cape. The exact GPS is placed at the NRCS building 25°46'08.5"S 28°12'47.8"E.
Resealing of National Route 2 Section 11 from St. Albans interchange at km 7.19 to Linton Grange interchange at km 23.26, Nelson Mandela Bay Municipality in the Eastern Cape. The project value is R 135 290 000,00. The GPS marker has been placed along the N2 close to Gqeberha 33°56'52.9"S 25°30'21.9"E
Upgrading of the old Summerstrand Hotel to accommodate more students in Gqeberha, Eastern Cape. The scope of work includes construction of 19 separate residential complexes, providing between 3000 and 3500 additional student residence beds. The GPS co-ordinates 33°59'37.10"S 25°40'34.34"E.
Construction of a semi-circular double storey, 3 758 seater church and service center with a 408 seater hall on Erf 50543, Laurens Erasmus Drive, Bethelsdorp. Eastern Cape. Value R69 890 000.00. The GPS co-ordinates are 33°52'23.6"S 25°29'22.8"E.
Construction of the Spitskop East Wind Energy Facility and associated infrastructure on a site north-west of Riebeek East, Eastern Cape. Up to 57 wind turbines are proposed to be constructed over an area of approximately 200 km² in extent.
Construction of a 7 MW Solar PV and vertical axis wind turbine including a 6 MWH battery energy storage system, at the Port of Ngqura, Port Elizabeth, Eastern Cape. CIDB 8EP. The exact GPS location is not known and the Marker has been placed at Transnet Port Terminal- Ngqura Container: 33°48'20.9"S 25°40'46.5"E
Construction of water and sewer infrastructure in Zone 3 and 4 of the Coega SEZ, in Gqeberha, Eastern Cape. The project value is R 132 842 793,53. The scope of works includes: Construction of a Ø630mm connection including bulk water meter chamber from the Ø750mm bulk water supply line to Zone 3. Construction